Download as ppt, pdf, or txt
Download as ppt, pdf, or txt
You are on page 1of 14

HATIL Production Planning & Control

Eng. Aminur Rahman


Production planning and control is nothing just
situation oriented decision making of the
manufacturing process.
It co-ordinates supply and movement of materials and
labor, ensures economic and balanced utilization of
machines and equipment as well as other activities
related with production to achieve the desired
manufacturing results in terms of quantity, quality,
time and place.

Eng. Aminur Rahman


Planning : The choice from several alternatives of the best
utilizing the available resources to achieve the desired
objective .

Control: The monitoring of performance through a feed


back by comparing the results achieved with planned targets
so that performance can be improved. .

Eng. Aminur Rahman


 To ensure maximum utilization of all resources
 To minimize the product throughput time
 To maintain optimum level inventory
 To maintain flexibility in manufacturing operations
 Coordinate between various supporting departments

Eng. Aminur Rahman


 Strategic Planning(Long range): It is process of
thinking though the organizations current mission and
environment and setting a guide for future decisions and
results. Ex: Oversea purchase forecasting.

 Operational Planning(Short Range ): It is done over a


short range time span developed PPC Team. It is concern
with utilization of existing facilities rather than creation
of new facilities. Ex : Monthly Plan

Eng. Aminur Rahman


Moving +
Weighted
Moving
Avg.
12 Month Material Requirements Plan

Rough Production
Bills of
Material
Material Requirements
Planning

Inventory
Status
Place Order
If Shortage

Eng. Aminur Rahman


Eng. Aminur Rahman
Monthly Material Requirements Planning

Rough Production
Bills of
Material
Material Requirements
Planning

Inventory
Status
Place Order
If Shortage

Eng. Aminur Rahman


Moving Avg.
Eng. Aminur Rahman
Eng. Aminur Rahman
 PPC function is based on certain assumptions or
forecasts of customer’s demand, Plant capacity,
availability of materials etc
 This function become difficult when environmental

factors changes rapidly.

Eng. Aminur Rahman

You might also like