Ring Topology For Hub Sites: Altium/ADR Based
Ring Topology For Hub Sites: Altium/ADR Based
Ring Topology For Hub Sites: Altium/ADR Based
Altium/ADR based.
Mobilink Pakistan
Ring Topology Project
• To provide alternate MW path to hub sites.
• Path at BSC end will remain un-changed.
• There will be two path for each site.
• Failure of any one link in the ring will not effect the network.
• Maintenance at one link can be carried without interrupting
operation.
Ring Topology Project
• Hub Sites of Karachi are selected for the
project.
• Un-protected Altium and protected ADR
qty 03 each will be used .
• All the Altium/ADR will be connected in
ring topology.
• See Diagram
Ring Topology Altium/ADR
T R T R
T R T R
ADR ADR
Altium Altium
T R T R
T R
T R
ADR
Tributary Panel
Ring Topology Project
• To provide alternate MW path to hub sites.
• Path at BSC end will remain un-changed.
• There will be two path for each site.
• Failure of any one link in the ring will not effect the network.
• Maintenance at one link can be carried without interrupting
operation.
Ring Topology Project
• To provide alternate MW path to hub sites.
• Path at BSC end will remain un-changed.
• There will be two path for each site.
• Failure of any one link in the ring will not effect the network.
• Maintenance at one link can be carried without interrupting
operation.