A preliminary survey was conducted to plan an optical fiber cable route which included: selecting the general route, deciding the cable size and length required, determining the number of circuits needed in the cable, and assessing the heavy tools and plants required depending on the terrain and availability of roads.
A preliminary survey was conducted to plan an optical fiber cable route which included: selecting the general route, deciding the cable size and length required, determining the number of circuits needed in the cable, and assessing the heavy tools and plants required depending on the terrain and availability of roads.
A preliminary survey was conducted to plan an optical fiber cable route which included: selecting the general route, deciding the cable size and length required, determining the number of circuits needed in the cable, and assessing the heavy tools and plants required depending on the terrain and availability of roads.
A preliminary survey was conducted to plan an optical fiber cable route which included: selecting the general route, deciding the cable size and length required, determining the number of circuits needed in the cable, and assessing the heavy tools and plants required depending on the terrain and availability of roads.
ROUTE • Preliminary survey shall be carried out for finalizing the drawing for the route of optical fibre cable as a part of project planning and execution.
• Selecting the route in general.
• Deciding the size and assessing the length of cable required.
• Working out the requirement of circuits which are to be provided in the cable.
• Working out the requirements of heavy tools and plants depending upon the nature of the territory, availability of roads along the tracks, etc.