RANKINE CYCLE
TURBINE
W1

Temperature, T
T1
T1

W2

CONDENSER
BOILER

W1

T2

T2

W2
Entropy, s

T2
  1
BFP
T1
TCE Consulting Engineers Limited
Engineering a better tomorrow A Enterprise
2
REGENERATIVE RANKINE CYCLE

Temperature, T
W1
T1
T1
T2

W2
W1

T2
CEP

LPH
HPH

Entropy, s

W2 TCE Consulting Engineers Limited


Engineering a better tomorrow A Enterprise
3
REHEAT REGENERATIVE RANKINE CYCLE

Temperature, T
W1 T1
T1

T2

W2
W1

CEP T2

LPH
HPH

Entropy, s

W2 TCE Consulting Engineers Limited


Engineering a better tomorrow A Enterprise
4
Piping & Instrumentation Diagrams
(P&ID’s)

TCE Consulting Engineers Limited


Engineering a better tomorrow A Enterprise 5
Purpose & Significance
Basic design input for downstream engineering activities
 Fixing of equipment design parameters
Quantity, Size
Materials of Construction
Design criteria
Safety /Protection measures
 Equipment Layout
 Duct layout

TCE Consulting Engineers Limited


Engineering a better tomorrow A Enterprise 6
Purpose & Significance (cont’d)

 Piping layout
 Piping design
* Pipe dimension
* Pipe thickness
* Pipe material
* Valve selection (type, size, rating, MOC)
* Piping accessories design like expansion joints,
* Drains and vents system

TCE Consulting Engineers Limited


Engineering a better tomorrow A Enterprise 7
Purpose & Significance (cont’d)
• Control Valves and Flow Element - Design
- Number
- Size /Rating
- Materials of Construction
 Local & Remote Instruments - Design
- Type, Number
- Range
- Materials of Construction

TCE Consulting Engineers Limited


Engineering a better tomorrow A Enterprise 8
Purpose & Significance (cont’d)
 In design of all downstream control and instrumentation
engineering related activities.
- Block interlock diagram
Preparation of Flow Diagrams (FDs)/P&IDs
- First Flow Diagrams are prepared
- Flow Diagrams are used as basis for preparing P&IDs
- HBDs and process knowledge needed for
preparing FDs

TCE Consulting Engineers Limited


Engineering a better tomorrow A Enterprise 9
MAIN STEAM SYSTEM

NOT CLEAR – CLUSTER OF INFORMATION TCE Consulting Engineers Limited


Engineering a better tomorrow A Enterprise 10
MAIN STEAM SYSTEM

BETTER – DIFFICULT TO TRACE TCE Consulting Engineers Limited


Engineering a better tomorrow A Enterprise 11
MAIN STEAM SYSTEM

TCE Consulting Engineers Limited


Engineering a better tomorrow A Enterprise 12
HP/ LP BYPASS SYSTEM

TCE Consulting Engineers Limited


Engineering a better tomorrow A Enterprise 13
STEAM EXTRACTION SYSTEM TO HEATER

TCE Consulting Engineers Limited


Engineering a better tomorrow A Enterprise 14
STEAM SUPPLY TO BFP DRIVE TURBINE SYSTEM

TCE Consulting Engineers Limited


Engineering a better tomorrow A Enterprise 15
AUXILIARY STEAM SYSTEM

TCE Consulting Engineers Limited


Engineering a better tomorrow A Enterprise 16
CONDENSATE SYSTEM

TCE Consulting Engineers Limited


Engineering a better tomorrow A Enterprise 17
FEEDWATER SYSTEM

TCE Consulting Engineers Limited


Engineering a better tomorrow A Enterprise 18
HEATER DRAINS SYSTEM

TCE Consulting Engineers Limited


Engineering a better tomorrow A Enterprise 19
STEAM TURBINE DRAINS SYSTEM

TCE Consulting Engineers Limited


Engineering a better tomorrow A Enterprise 20

You might also like