Professional Documents
Culture Documents
Installation - Operation - Maintenance Autoclave
Installation - Operation - Maintenance Autoclave
Open the taps carefully and check that there are no leaks
Switch on the power from tha main power switch (V-models:
located on the right side of the unit, D-models: located on the
bottom – right side of the unit)
Program list:
- 1-3 Instruments
- 4-5 Waste bags
- 6-7 Liquid waste
- 8-11 Liquids
- 12 Cleaning
If necessary change:
- Door gasket
- Pt100 temperature sensor
- Water, drain or air hoses