Professional Documents
Culture Documents
Sip Project
Sip Project
To improve the Food Improved Food Lab, Improve and repai Food
Laboratory, SLRC, CR, and SLRC Lab, SLRC, faucet, and
faucet, and Comfort CR
Room
PROJECT RIPS
REPAIR AND IMPROVE THE PHYSICAL ASPECT OF SCHOOL
SCHOOL PROGRAM PROGRAM OBJECTIVE OUTPUT FOR THE YEAR ACTIVITIES
Project RIPS To repair classrooms Repaired classrooms Repair of classrooms
(Repair and and buildings with minor • Ceiling
and major • Windows
Improve the • Roofs
Physical Aspect of
the School) To improve the Improved perimeter Repair and construct
perimeter fence, fence perimeter fence,
drainage/canal and drainage, canals and
pathways. pathways
To improve the Food Improved Food Lab, Improve and repai Food
Laboratory, SLRC, CR, and SLRC Lab, SLRC, faucet, and
faucet, and Comfort CR
Room
PROJECT SSS
SECURED AND SAFE SCHOOL
Y1 Y2 Y3
ENROLMENT TREND
2015-2016 2016-2017 2017-2018
JHS AND
SHS
240 272 300 INCREASING
ENROLMENT
300
272
240
ENROLMENT Y1 Y2 Y3
2015-2016 2016-2017 2017-2018
Grade 11 19 29
Grade 12 16
ENROLMENT
SEGMENTATION BY GENDER
GRADE Y1 Y2 Y3
LEVEL
2015-2016 2016-2017 2017-2018
MALE FEMALE MALE FEMALE MALE FEMALE
GRADE 7 32 31 41 29 37 30
GRADE 8 35 32 32 34 38 28
GRADE 9 26 35 35 27 36 30
GRADE10 20 29 23 32 30 26
KSA 113 127 131 122 141 114
GRADE 11 13 6 15 14
GRADE 12 10 6
KSA
ANALYSIS
The dashboard on enrolment presented the 3-
year enrolment data from Y1 2015-2016, Y2
2016-2017, and Y3 2017-2018. The data was
further elaborated through segmentation by JHS
and SHS enrolment, grade level and gender.
The data revealed that the 3-year enrolment
continue to increase from Y1 to Y3 with 240,
272, and 300 number of entrants respectively.
This is due to the increase of grade levels
particularly in Y2 with grade 11 and Y3 with
grade 11 and grade 12. The additional SHS track
on Y3 which is GAS (General Academic Strand)
also contributed to the increase of enrolment.
Action conducted
The successful implementation of Project SSC (School-to-School Campaign)
helped to increase the number of enrolment yearly. It was started on SY 2015-2016
when the enrolment from the previous year continued to decline from 282 (SY 2013-
2014) to 269 (SY 2014-2015) to 240 (SY 2015-2016). It was alarming because of the
great decrease in enrolment.
With the collaborative effort of the teachers, Project SSC was initiated and
significant increase of enrolment since the implementation of the said project is
evident.
However, in spite of the effectivity of the enrolment campaign the school needs to
strengthen its implementation to further increase the enrolment of JHS and particularly
in SHS.
PROPOSED ACTION:
Create a team who are responsible for the intensified early registration and
child community mapping plan.
Strengthened the school to school campaign through the use of social media.
Project good image of the school to attract all possible enrollees within the
catchment area.
Give flyers that showcase the achievements and activities of the school to
encourage learners to enroll.
60
59.53
50.95
50
40
30
20
10
0
1ST SEMESTER 2ND SEMESTER
GRADE 11 GRADE 12