Professional Documents
Culture Documents
Risk Management: Risk Identification and Risk Assesment
Risk Management: Risk Identification and Risk Assesment
IMPACT(I
)
RISK RATING
RISK SCORES
RATING
1. Theft (Inventory, Supplies, Information) L(1.5)I(5)= 7.5
Unacceptable Unacceptable Immediate action
is required to
2. Utilities Failure L(1.5)I(1.5)=
Issue 2.25 manage the risk
3. Transaction Processing Errors L(3)I(3)= 9 Issue Action is required
Unacceptable
4. Inflation L(.75)I(3)=2.25 to manage the risk
Supplementary Issue
5. IT System Malfunction L(1.5)(3)=4.5 Supplementary Action is
Issue Issue advisable if
6. Lack of Manpower L(.75)I(1.5)=
1.125 resources are
Supplementary Issue available
7. Safety Violation L(.25)I(5)=1.25
Issue Acceptable No action required
8. Ethics Violation L(.75)I(5)=3.75
Issue
9. Operation/Factory Accidents L(3)I(1.5)=4.5
Issue
10. Obselete Equipments L(3)I(.75)= 2.25
Supplementary Issue
THANK YOU