KfW funded Project : Introduction

• Project on GZB-CNB section – Signaling & GZB-


MGS section- Telecom.
• Ghaziabad – Kanpur section : One of the busiest
section of Indian Railways.
• More than 200 trains both ways per day.
• 410 Route Kms with electrified double line section
having 47 stations (GZB-CNB) & 3rd line between
Aligarh – Gaziabad.
• 9 big yards including Panki, Etawh, Tundla,
Aligarh, Khurja, Dadri & others.
KfW funded Project : Scope of Work
• Total 11 Pink Book sanctioned works – Approx. Cost 650 Cr.

 Signaling
• Electronic Interlocking(EI) at 38 wayside stations in GZB
– CNB section
• Provision of Automatic Signaling at 47 Block Sections on
GZB – CNB section
• EI at 9 Medium/Major yards
 Telecom
• Mobile Radio Communication (MTRC) System in
Ghaziabad – Mughalsarai section
• Optical Fibre Cable (OFC) in GZB - CNB section
• Exchanges at all stations on GZB-CNB-MGS section

 Centralised Traffic Control (CTC) at Tundla

 AMC for 3 years