2016.08.23
Test items per technology
Below are the frequency as agreed with NOC BIS using WDT FT tool.
ThirdTool(Speed
test)
FTP
Check-in & Check-out site for FT
Region Tester name Handphone IMEI Site ID Site Name Band for FT
1. Before FT started, information as above shall be given to NOC FT PIC daily in a table form.
2. Contact Michael Marzo +63 9193334350 for FT PIC assignment and numbers for calling will be given.
3. Send SMS with load balance to Huawei NOC FT team before starting as CHECK-IN.
4. Then start WDT FT following the test items with respective bands.
5. After FT, Send SMS with load balance to Huawei NOC FT team when done as CHECK-OUT.
Operation steps: PHU to lock frequency
2 1
1. Open [Genex PHU] apps then press home button (only need to start PHU running
in background)
2. Open the [WDT] appsNote: Must open PHU first, followed by WDT
3. Choose the [Service verification] function, then you will able to see the screen
with cell ID for start test.
FT steps
6
5
4
After several trials validation, the following key settings to be pre-defined to smooth the FT
process and guarantee the success of FT using WDT tool:-
Test item Key Setting Proposed value Reasons
Phone No. Test phone No. Tester number to speed up SMS receiving test.
SMS
Test Count(s) 3
Hotline will assign number to Confirm call quality with
Phone No. HW NOC hotline
NOC.
Dialing
Duration of call(s) 30 Need enough time for call quality test.
Test Count(s) 3
Latency time(s) 180
Answering
Test Count(s) 3
3
3
3
Thirdtool (Speedtest) & FTP UL/DL
1. When speed test done, knock the screen twice for screen
capture.
2. Press the blue dots, then select and attach the screen
capture for report purpose.
• Once tests completed and passed, the cell will be shown in GREEN, select cell
icon and view result / log
• Result path: Store in phone SD //Internal storage/HuaweiSDTData/Site_BTS3900
CSFB log check after testing
OK!
Recovered to
LTE, successful
fast return to
LTE.
Log & Test report generated
FT test result and log immediately after the test. Below is the example:-
1. Only the FT log will be zipped with label the band done FT and uploaded to Smart local server to
Smart NOC BIS.
2. Huawei Regional FT leader will compile the FT log upload results and send email to Smart NOC
BIS within 12 hours after FT done.
3. Smart NOC BIS will generate a formal report by using WDT Assistant in PC of NOC and feedback
results within 24 hours after results uploaded.
Thank you