KBAT BUILDERS

The Pioneers, The Builders

Presented by-
Taniya Nagpal
Kunal Janyani
Bhagyashree Sonkar
Aneesh Prabhu
TABLE OF CONTENTS
Introduction Scope Statement
1 Introduction and 2 Detailed description of
purpose of presentation delieverables

WBS Gantt Chart


3 Breaking down the 4 Graphical illustrations of
work delieverables to scheduled plan
allot tasks

Conclusion Our Team


2 5 6
Summary of presentation Members of the
presentation
ABOUT THE PROJECT

We are creating a structure of two floored duplex


bungalow in CBD Belapur for our client.

3
The Process
Stage 1
Preparing a scope statement for detailed
analysis of work to be executed

Stage 2
To create a WBS for breaking up
tasks which can be allotted .

4 Stage 3
To prepare a Gantt chart
for the same.
Scope Of the Project
Objective: To construct a bungalow on 3000 sq. area within five months at a cost not to exceed INR 1

Deliverables: The ground floor entrance with a huge gate combined of iron wood with glass (6 x 5 feet). The outer area Verandah
is about 17.9 x 8.6 Sq. Ft area. Once you entered in drawing hall though main door (comprising of size 4 x 7 = 28 feet) with
Italian marble in a area of 19.0'×12.0' with wide window (size 6.0'×4.0.0) one will definitely enjoy the glance. The living room
attached with dinning table area about 4.0 x 6.0 along with an open window around 1.6 x 4.0 with off-white curtains on it. As
you move ahead you will see a modern modular kitchen with chimney (14.0 x 10.0) beside kitchen you will see the entrance for
paragon staircase (3.0 x 7.0) on the right-hand side of that opposite side of the kitchen you will see an Italian bathroom in (110
sq. ft) area with a window size 4.0 x 6.0. Besides that, you will see the entrance door for 3.0 x 7.0 of a bedroom with an area of
10.0 x 15.0 window size 4.0 x 4.0 white marble flooring with furniture, painting, wardrobe and daylight lighting set. As you
move toward staircase open and round you reach 1 St floor right-hand side a small study room 14.0 x 10.0 Sq. with the entrance
door of 3.0 x 7.0 with a window size of 5.0 X 4.0 Sq. Ft Second bedroom area 19.0 x 12.0 Sq. Ft area with entrance door 3.0 x
7.0 Sq. ft with a window size of 6.0 x 4.0 Sq. Ft a bed with a wardrobe along with that a mirror a modern décor your eyes will
get attention, along with balcony attached 17.9 x 8.6 Sq. Ft entrance door 3.0 x 7.0 to it and one small bedroom 10.0 x 19.0. The
second floor is the open terrace

5
Milestone
• Permits approved by Jan 1st
• Foundation by Feb 20th
• Pour Concrete – 21-01-2021
• Cure & Strip Forms – 05-02-2021
• Steel Columns – 15-02-2021
• Beams – 27-02-2021
• Joints – 24-03-2021
• Putty & Scratch Work – 05-04-2021
• Ceiling Tiles – 05-04-2021
• Installing Book Cases - 05-04-2021
• Fitting of Electricals – 05-04-2021
• Plumbing – 11-04-2021
• Set Fixtures & Trim – 20-04-2021
• Test & Clean - 30-04-2021
• Final inspection by May 10h 2021

6
WBS
Per Head* Number of
Task ID Task Name Number Days Resource Name workers Cost of Task (In Rs)

           

1 FOUNDATION        

           

1.1 Excavate 20 Worker A,B,C 1200*3 3600

1.1.1 Pour Concrete 15 Worker A,B,C 1200*3 3600

1.1.2 Cure & Strip Forms 10 Worker A,B,C 1200*3 3600

           

1.2 Steel        

1.2.1 Steel Columns 12 Worker A,B,C 1200*3 3600

1.2.2 Beams 25 Worker A,B,C 1200*3 3600

1.2.3 Joints 12 Worker A,B,C 1200*3 3600

         )  
2 EXTERNAL        

           

2.1 Building Finishes        

2.1.1 Putty & Scratch Work 5 Worker D,E,F 900*3 2700

2.1.2 Ceiling Tiles 15 Worker D,E,F 900*3 2700

2.1.3 Install Book cases 9 Worker D,E,F 900*3 2700

           

           

3 INTERNAL        

           

3.1 Plumbing        

3.1.1 Rough Plumbing 12 Plumber A,B,C 700*3 2100

3.1.2 Set Fixtures & Trim 8 Plumber A,B,C 700*3 2100

3.1.3 Test & Clean 6 Plumber A,B,C 700*3 2100

           
83.2 Electricals        

3.2.1 Rough Fittings 15 Electrical A,B,C 500*3 1500

3.2.2 Install 12 Electrical A,B,C 500*3 1500

3.2.3 Test & finalize 7 Electrical A,B,C 500*3 1500


Resource Name Per Day Cost
(In Rs)
   
Worker A 1200
Worker B 1200
Worker C 1200
   
Worker D 900
RESOURCE

Worker E 900
Worker F 900
   
Plumber A 700
Plumber B 700
Plumber C 700
   
9
Electrical A 500
Electrical B 500
Electrical C 500
Gantt Chart
Duration
Task Start date End date (days)
Excavate 01-01-2021 21-01-2021 20
Pour Concrete 21-01-2021 05-02-2021 15
Cure & Strip Forms 05-02-2021 15-02-2021 10
Steel Columns 15-02-2021 27-02-2021 12
Beams 27-02-2021 24-03-2021 25
Joints 24-03-2021 05-04-2021 12
Putty & Scratch Work 05-04-2021 10-04-2021 5
Ceiling Tiles 05-04-2021 11-04-2021 6
Installing Book Cases 05-04-2021 13-04-2021 8
Fitting of Electicals 05-04-2021 14-04-2021 9
Plumbing 11-04-2021 20-04-2021 9
10
Set Fixtures & Trim 20-04-2021 30-04-2021 10
Test & Clean 30-04-2021 10-05-2021 10
1/1/2021 1/21/2021 2/10/2021 3/2/2021 3/22/2021 4/11/2021 5/1/2021 5/21/2021 6/10/2021

Excavate

MAIN
Pour Concrete

Cure & REQUIREMENTS


Strip Forms

Steel Columns

Beams
MAIN REQUIREMENTS

Requirement
Joints 1 Requirement 2 Requirement 3
Putty & Scratch Work

Ceiling Tiles

Installing Book Cases

Despite
Fitting of Electicals being red, Mercury is the closest Saturn is the ringed
Mars is a cold place, planet to the Sun and one. It’s a gas giant,
not hot. The planet is
Plumbing it’s only a bit larger composed of hydrogen
11 full of iron oxide than our Moon and helium
Set Fixtures & Trim

Test & Clean


Thank You