AGENDA
Goals and Strategy
Goal:
Optimize of refinery steam system considering the actual demand and
development of proposal for a network configuration with minimized losses
Strategy:
Simulation steam networks , considering a winter case, with results in flow,
velocity and pressure drop.
Simulations were done for winter conditions: normal operation conditions wind
velocity 2m/s and temperature - 10 ºC
HPS_P_C
PROPOSALS
•Cold stand-by 3 Raf header and completed connection with 1,2 DRB headers ( 2 Raf header to maintain in cold
stand by as it is ). 1DRB, 2 DRB can assure the requested parameters for all consumers at battery
limits of the plants
•Improve monitoring and control parameters at Cogen based on critical consumer demands (turbo blower FCC)
At flow of 98, 4t / h() , in order to meet the minimum requirements of consumers (FCC –turbo blower
32 barg /300 ° C and RC2: 30 barg /320 ° C) at Cogen should be a pressure of 33.8 barg /330 ° C
not 34,6 barg, 341,8 ° C
Detalied proposals
Consumers
• ADE
• 124N
• Ramps( chemicals, crude oil,
• 123HM
gasoline, preheated, FAME,
• 130RC2
Shell, Negoiesti, automation,
• 120 HB
gases, LPG)
• DEMI DRB
• ETBE(fract , reaction)
• Golire Rapida
• Isomerization
• Cx pumps
• DAV
• DGRS Old Plot plan
• RC1(500,570) MPS Plot plan
• TAME
• Wabag 1,2,3
• LD MP-LP
• Flare
•Maintain actual mode to feed DAV with MP steam; the alternative reserve pipe (from S822 to S885 valve)
remain in cold stand by ( temperature parameter is lower than actual)
•Assessment possibilities to consume the MPS from network only in emergency case in RC2 plants
Detalied proposals
Consumers
• COGEN
• Conrad(Gena Electric) • ADE
• DEMI Raf • Ramps gases and automated
• Isomerization • Wabag 1,2,3
• Tame • Flare
• 124N
• 123HM new
• DGRS new
• 120HB
• 130RC2
• RC1
LPS_P_C
Proposals
•Asses impact of supplying DGRS New with LP steam produced from Cx and internal letdown LDMp-Lp- DGRS Old(by a section of 2
DRB )
•Evaluate the possibilities to feed Conrad with steam by other economical way ; the steam is used discontinuous at a oven for electrical
engine drying
•Evaluate Production proposal to out of function pipes which feed RGF2; the consumer can be supply by electrical heating
•Cold stand by VJ007 pipe from interconnection with VJ003 (R 17 ) to Area 43 (R 35) due to small diameter
Detalied proposals