PENG 219 – Production

Engineering
Vahid Atashbari
Fall 2019

All rights reserved 1


Material Balance

• Reservoir = Tank with constant volume

• Useful to establish connected hydrocarbons volume initially in place

• Reservoir main drive mechanism

• Reservoir compartmentalization

• Oil initial in place

All rights reserved 2


Reservoir with gas cap and aquifer at
initial conditions

All rights reserved 3


Reservoir after cumulative production: Np,
Gp, Wp

All rights reserved 4


Material Balance – General Equation

All rights reserved 5


All rights reserved 6
All rights reserved 7
Flow Regimes – Horizontal Flow

All rights reserved 8


Flow in Pipes
• The flow in a wellbore or a flowline can be single phase or multiphase:

• Single phase- dry gas production,


water/chemical injection

• Multiphase- gas-condensate,
oil-water oil and dissolved gas, three-phase

• Flow in pipes: flow through surface/ subsea pipes, tubing, casing or an


annular space
All rights reserved 9
Flow in Pipes

The effect of gravity can be significant, also fluid properties:

• density, viscosity and compressibility

• rheological properties – laminar or turbulent flow, slip between


phases etc.

All rights reserved 10


Velocity Profiles
Laminar and Turbulent Flow

All rights reserved 11


Single Phase, Incompressible Flow

The change in pressure is equivalent to change in energy.


Therefore, one can explain the same phenomenon using the mechanical energy balance
equation:

All rights reserved 12