Professional Documents
Culture Documents
EPPs - Residuos - Agua - Taller Tco (Houston Marzo 2015) V - Extendida
EPPs - Residuos - Agua - Taller Tco (Houston Marzo 2015) V - Extendida
March, 4th
Drilling:
2.00
other actions
Effluents Risk social score Source score
0.00
Air emissions
Waste
Risk R&B score Receiving body score
Water quality
Waterscore
treatment score
Air Emissions
POIs
ASSETS: ASSETS:
EPP Gap Analysis - EPP Gap Analysis
updated
- EPPs implementation
Plan (POIs)
- Water Management
Project
Alaska Norway
Russia
Spain
Algeria
Kurdistán
GOM
Trinidad Libya
Aruba Mauritania
Colombia Venezuela
Ecuador Angola
Peru Brasil
Bolivia Namibia
Australia
Geophysics
Production
DRILLING WELLS 13 23 25
EAA 5 9 13
PACIFIC 3 9 4
CARIBBEAN 2 0 6
NORTH AMERICA 2 3 1
BRAZIL 1 2 1
SEISMIC CAMPAIGNS 8 6 15
EAA 4 3 6
PACIFIC 2 0 4
CARIBBEAN 1 2 3
NORTH AMERICA 1 0 1
AUSTRALIA 0 0 1
ASSETS 9 - 10
EAA 2 - 2
PACIFIC 5 - 6
CARIBBEAN 2 - 2
85%
10%
6%
96%
94% 89%
86% 82% 83%
67% 68%
24% 25%
9% 14%
8% 6% 8% 6% 10% 7%
3% 3% 4% 3% 2% 2%
DRILLING WELLS 13 23 25
EAA 5 9 13
PACIFIC 3 9 4
CARIBBEAN 2 0 6
NORTH AMERICA 2 3 1
BRAZIL 1 2 1
SEISMIC CAMPAIGNS 8 6 15
EAA 4 3 6
PACIFIC 2 0 4
CARIBBEAN 1 2 3
NORTH AMERICA 1 0 1
AUSTRALIA 0 0 1
*Para 2012 se muestra el nº de drilling campaigns y no el nº de pozos perforados como en el resto de años.
100%
Geophysics 2012-2014
80% Compliance with EPPs - Geophysics
60% 86%
70%
40% 57% In compliance
Out of Compliance
Unknown
20% 32%
20%
11% 10% 8% 6%
0%
Aruba Australia Russia Brazil Guyana Tunisia
2012
2013
2014
2012
2013
2014
2012
2013
2014
% Applicability % In compliance % Out of Compliance % Unknown
100%
80%
60%
40%
20%
0%
Aruba Australia Russia Algeria Colombia Norway Peru U.S.A Bolivia
2012
2013
2012
2013
2014
2014
2012
2013
2014
0%
Libya Russia U.S.A Bolivia Brazil Norway Argelia Ecuador
100%
80%
60%
40%
20%
0%
Libya Russia U.S.A Bolivia Brazil Angola Kurdistan Mauritania Namibia T&T
- Better knowledge about the compliance (less unknown situations: “yellow bars”)
WATER
EPPs
WASTE
EMISSIONS
OBJECTIVE
Decommissionin
Seismic Drilling Production
g
50%
40%
8/18/20
30%
20% 8/18/20
10%
0%
8/18/2 8/18/2 8/18/2 8/18/2 8/18/2 8/18/2
8/18/2 8/18/2
0
0 0
0 0
0 0
0 0
0 0 0
0
OFFSHORE
There shall be no discharge of free oil as a result of the
EPP 54 discharge to sea of WBFs muds and WBFs cuttings
EPP 55 NAFs muds discharge to sea is not allowed • 13 wells verified according to
NAFs drill cuttings (Diesel Oil base) discharge to sea is not
EPP 56
allowed EPPs
ONSHORE • Verification by Deloitte
EPP 78
Uncontrolled pumping off of fluids is an unacceptable
onshore disposal method • 100% of compliance
Discharge to a water body is an unacceptable onshore
EPP 79 disposal methods
80%
70%
60%
Assets 2012-2014
Compliance with EPPs - Asset
50%
67%
40% I
30% 47% O
U
20% 24% 33%
10% 20%
9%
0%
Bolivia Venezuela Spain Ecuador T&T
2012
2012
2014
2014
2014
2012
% Applicability % In compliance % Out of Compliance % Unknown
80%
70%
60%
50%
40%
30%
20%
10%
0%
Bolivia Venezuela Spain Ecuador T&T Peru
- Better knowledge about the compliance (less unknown situations: “yellow bars”)
Lessons Learned
Better Practices
• To use synergies between different projects
(Water Management project, Methane Plan,
Waste plan).
67%
In compliance
47% Out of Compliance
Unknown
24% 33%
20%
9%
Spain:
Poseidon Abandonment Plan
Ecuador:
2012
2014
2014
2014
2012
2012
4 100
128
3 117
96
2 126
127
1 129
115
0 82
99 100 128 117 96 126 127 129 115 82 131 132 104 121 101 87 110 91 111 98 114 88 85 89 97 119 109
No of Projects
2013
TSP
Casablanca
Poseidón
Bloque 16
Cambeiti
2014
Margarita
Monteagudo
Quiriquire Gas
TSP
Casablanca
Poseidón
EFFLUENTS
Bloque 16
Cambeiti
Mamoré
2015
Margarita
AIR EMISSIONS
Monteagudo
Quiriquire Gas
POIs proposal 2014. Projects per asset and year.
5. PLAN OF IMPLEMENTATION (POIs)
TSP
Casablanca
Poseidón
Bloque 16
2016
Mamoré
Quiriquire Gas
TSP
Bloque 16
2017
TOTAL POIs = 50
TSP
31
5. PLAN OF IMPLEMENTATION (POIs)
POIs proposal 2014. Costs by projects.
$1.000.000
$900.000
$793.594
$500.000
Risk Assessment
Approach
Tools
Water Footprint
Certification
standards
Investors
Interest
Groups
Associations
ONU / EU
Cuenta de EPP
31
30
29
28 IdEPP
27 132
26
25 119
24
23 131
22
21 129
20
Water 19
18
128
17 127
Management 16
15 126
Project 14
13 121
12
11 117
10
9 115
Effluents 8
7 114
EPPs 6
5 111
4
3 110
2
Waste Air 1
0
109
Internal External
management management
AVAILABILITY, QUALITY AND ECOSYSTEMS OF WATER
SOURCES
MEASUREMENT
10% • SOURCE IMPORTANCE 10%
• LEVEL OF INSTRUMENTATION • WATER BODY SIGNIFICANTLY AFFECTED, DROUGHT,
CLIMATE CHANGE AND ECOSYSTEMS STRESS
FUTURE DEMAND
•
•
WATER SCARCITY
AGRICULTURE (33%)
15%
WATER TREATMENT 5% • POPULACION (33%)
• INDUSTRY (33%)
• WATER WITHDRAWAL TREATMENT
• MANAGEMENT WATER EXPENSES
• WATER DISCHARGE TREATMENT(100%) REGULATORY AND BUSINESS RISKS
• 15%
•
REGLATORY RISKS (50%)
FINES (20%)
15%
• CURRENT IMPROVEMENT PLANS (30%)
DISCHARGE WATER QUALITY 10%
SOCIAL RISKS
• EXPOSURE(40%)
• AVAILABILITY AND QUALITY FOR WATER HUMAN
10%
© Repsol. DSMA E&P. March 2015 SUPPLY (60%)
37
6. WATER MANAGEMENT Project
REPSOL WATER TOOL (RWT): RESULTS. Water Management Baseline in E&P.
Measurement score
External Threats:
Water quality score Water treatment score
Margarita for being in
water shortage area
Margarita
Block 16 for the impact
on its water bodies TSP
Block 16
© Repsol. DSMA E&P. March 2015 38
6. WATER MANAGEMENT Project
REPSOL WATER TOOL (RWT): RESULTS. Main areas of
performance. Action Plan 2015-2020.
EPPs COMPLIANCE
• Total coordination with the EPP project. POIs definition.
TECHNOLOGIES
• Identified and study potencial technologies and cost associated with the wastewater
treatment to evaluate whether the assets are technologically prepared for the future.
• Production water management alternatives
$1.500.000
$1.000.000
$793.594
$500.000
$340.500 $310.000 $335.500
$217.000
EPPs
Comments to draft
document
update
(*) PURPOSE:
• To ease the gap analysis process according to several complaints (no specific and big)
• To take into consideration the agreements reached on the October Drilling workshop
• To facilitate the compliance (e.g.: tool EPP 120 avoids to make a Risk Analysis)
© 46
• Not to add new requirements to the EPPs.
7. NEXTS STEPS: Plan 2015
EPPs Drilling Waste Objetive in 2015
DG E&P
To implement EPPs for waste 2014-2020
from PROJECTION
drilling activity
60%
verified according to EPPs
50% • Similar verification plan as
40%
8/18/20
8/18/20 in 2014
30%
20% 8/18/20
8/18/20
10%
0%
8/18/2 8/18/2
8/18/2 8/18/2
8/18/2 8/18/2
8/18/2 8/18/2
8/18/2 8/18/2 8/18/2
8/18/2
0
0 0 0 0 0 0
0 0
0
2014 2015
OFFSHORE OFFSHORE
There shall be no discharge of free oil as a result of the discharge Feasible alternatives for the disposal of offshore WBFs, OBFs,
EPP 54 EPP 53
to sea of WBFs muds and WBFs cuttings SBFs and associated cuttings are to be evaluated
EPP 55 NAFs muds discharge to sea is not allowed
EPP 72 Prepare a Disposal Plan for fluids and cuttings discharge
EPP 56 NAFs drill cuttings (Diesel Oil base) discharge to sea is not allowed
ONSHORE ONSHORE
Uncontrolled pumping off of fluids is an unacceptable onshore Feasible alternatives for the disposal of onshore WBDF, NADF
EPP 78 EPP 74 and associated cuttings are to be evaluated
disposal method
Discharge to a water body is an unacceptable onshore disposal Unacceptable Onshore disposal methods (which may lead to
EPP 79 EPP 77
methods pollution problems) is trenching
©
7. NEXTS STEPS: Plan 2015
WATER Management 2015 Company Objetive
• Ecuador, Bloque 16
Company Goal
• Bolivia, Margarita
2015 • Trinidad y Tobago, TSP
Main Conclusion
• Base line of water map has been developed for 9 E&P Assets
• Action Management plan has been defined for 2015-2020
• Cost estimation of implementing this action plan is 4 MM USD
Repsol has acquired the product E-Suite to support environmental management and
environmental reporting in all assets throughout the whole company.
Like Repsol, all major Oil&Gas companies are working on what is generally known as an
EMIS (Emission Monitoring Information System) Project:
2014 2015
20%
8% 13%
80%
77%
20% 20%
13% 13%
7% 10%
23% 26%
14% 17% 16%
3%
93%
Bolivia - Assets (2014)
84% 83%
70%
30%
20% 21%
16% 13%
10% 7% 10% 6%
0% 0% 4%
No of POIs
2 Nuevos POIs tras cierre
10 de diciembre de 2014:
EPPs 129 y 132
9
8
EPP
7
129
6
128 Effluents
5 127
126
4
104
3 97
96 Air Emissions
2
91
1 82
0
Margarita
Monteagudo
Cambeiti
Margarita
Mamoré
Mamoré
Mamoré
Monteagudo
Cambeiti
Measurement score
4.00
Future Demand score Water use score
2.00
582.000 $
7
- INSTRUMENTATION
6
- DECREASE WATER CONSUMPTION
- SANITARY WATER DISCHARGE
5 - WATER BODIES ANALYSIS
0
Margarita Cambeiti Mamoré Margarita Monteagudo Mamoré Margarita Monteagudo
2014 2015 2016
35%
18%
11%
44%
40%
32%
17%
54%
32%
27%
15%
No of POIs
7
5
EPP
131
4 129
128
Effluents
3 127
119
2 115
100 Air Emissions
0
Bloque 16 Bloque 16 Bloque 16 Bloque 16 Bloque 16
2013 2014 2015 2016 2017
2018…
Measurement score
4.00
Future Demand score Water use score
2.00
0.00
No of Projects No
No EPPs
EPPs EPPs
EPPs
8
8
1,103,594 $
7
7 - INSTRUMENTATION
- SOCIAL
6 - DECREASE WATER CONSUMPTION
- IMPROVEMENT IN THE QUANTITY OF
5
5 PRODUCED WATER
- SANITARY WATER DISCHARGE
4
4
- WATER BODIES ANALYSIS AND
REMEDIATION IF REQUIRED
3
3
2
2
1
1
0
0
Bloque
Bloque 16
16 Bloque
Bloque 16
16 Bloque
Bloque 16
16 Bloque
Bloque 16
16 Bloque
Bloque 16
16
2013
2013 2014
2014 2015
2015 2016
2016 2017
2017
29%
7% 5%
29% 29%
7% 5% 7% 5%
40%
36%
24%
17%
52%
39%
15%
9%
20%
13%
0%
EPP
4
3
101
100
2
96
82
1
0
Quiriquire Gas Quiriquire Gas Quiriquire Gas
2014 2015 2016
335.000 $
Measurement score (2015)
Future Demand score 1.00 Water use score
- INSTRUMENTATION
- ENVIRONMENTAL RISK
0.50
Risk social score Source score
0.00 1- Analysis of soil/groundwater.
2- External study: Influence of
asset wastewater discharge in
the ecosystem.
Risk R&B score Receiving body score
*Datos de 2011.
12% 7% 3%
19% 15%
11% 13% 11% 12% 12% 11%
6% 5% 0% 6% 6% 6%
0% 0% 0% 0%
50%
29%
21%
16%
50%
39%
12% 11%
No of POIs
13
12
11
10
EPP
9 121
8 117
7 115
Effluents
114
6
111
5 110
4 109
100
3 Air Emissions
96
2
0
TSP TSP TSP TSP TSP
2013 2014 2015 2016 2017 2018…
Measurement score
4.00
Future Demand score Water use score
2.00
0.00
0
TSP TSP TSP TSP TSP
2013 2014 2015 2016 2017
23%
19% 24%
14% 10% 7%
65%
50%
23% 27%
20%
13% 15% 15%
Casablanca Poseidon
% Applicability % In compliance % Out of Compliance % Unknown
58%
42%
Casablanca Poseidon
% Applicability % In compliance % Out of Compliance % Unknown
© Repsol. DSMA E&P. March 2015 84
8.6. Annex SPAIN
Plans of Implementation (POIs) 2014
Asset Env. POIs Dispensation
Vector
Air 2 0
Casablanca
Effluents 1 0
Air 1 4
Poseidón
Effluents 5 0 POIs realizados
No of POIs
6
5
EPP
4 132
129
3 128 Effluents
126
115
2
100
Air Emissions
99
1
0
Casablanca Poseidon Casablanca Poseidon Casablanca Poseidon
2014 2015 2016
Measurement score
2.00
Future Demand score Water use score
1.00
- SOCIAL
- WATER PRODUCTION DISCHARGE PERMIT
- SANITARY WATER DISCHARGE
0
Casablanca Poseidón Casablanca Poseidón
2014 2015
33%
14% 13% 18%
0% 0%
33%
14%
0%
Kumolskiy
% Applicability % In compliance % Out of Compliance % Unknown
26% 26%
13% 10% 13% 13% 13% 10%
0% 0% 0% 0%
6% 6% 7%
0% 0% 0%
5% 7% 9%
0% 0% 0%
Gabi 1 Gabi 3
% Applicability % In compliance % Out of Compliance % Unknown
5% 7% 7% 7% 0% 0%
0% 0% 0% 0% 0% 0%
87%
10% 13%
0%
25%
13% 14%
0% 0% 5%
14%
0% 5%
6% 0% 0%
6% 11% 11%
29%
19%
5% 7% 0% 0%
65% 67%
29% 30%
21% 18%
6% 4%
A1 129/02 A1 129/04
7% 7% 7% 7%
0% 0% 0% 0% 0% 0% 0% 0%
11% 6%
0%
10% 17%
0%
87%
80%
20%
10% 10% 13%
0% 0%
Brattholmen Darwin
% Applicability % In compliance % Out of Compliance % Unknown
7% 0% 0%
7% 7%
0% 0% 0% 0%
Binari Zewe 1
% Applicability % In compliance % Out of Compliance % Unknown
7%
0% 0%
11%
0% 0%
15%
0% 0%
11%
0% 3%
11% 11%
6%
0% 0% 0%
72%
22%
12%
6%
Aruba - 3D (2014)
100%
11%
0% 0%
26%
13%
5%
11% 12%
0%
22%
15% 13% 15%
0% 0%
15% 13%
0%