© Repsol. DSMA E&P. March 2015


INDEX

1. EPPs background and 2014 global results


2. PROJECTS (geophisics and drilling): 2014 results
3. DRILLING WASTE Objective: 2014 results
4. ASSETS: 2014 results
5. PLAN OF IMPLEMENTATION (POIs): 2014 proposal
6. WATER MANAGEMENT Project: 2014 results
7. NEXT STEPS: 2015 Planning

© Repsol. DSMA E&P. March 2015 2


Geophysic:
2014 Results
EPPs Gap Analysis
 Biodiversity
 Noise
 Effluents

Drilling:

Assets Projects EPPs Gap Analysis Drilling


 Waste Waste
 Effluents Objective
Up  Air emissions
str
ea
Repsol Water Tool
m Action Plan
Measurement score 2015
Effluents POIs +
EPPs Gap Analysis Future Demand 4.00 Water use score

2.00
other actions
 Effluents Risk social score Source score
0.00
 Air emissions
 Waste
Risk R&B score Receiving body score

Water quality
Waterscore
treatment score
Air Emissions
POIs

© Repsol. DSMA E&P. March 2015 3


1. EPPs Background and
2014 Global Results

© Repsol. DSMA E&P. March 2015 4


1. EPPs Background
Snapshot 2012-2014

2012 2013 2014

PROJECT (Seismic and Drilling): EPP Gap Analysis PROJECTS:


- EPP Gap Analysis
- Drilling waste objective

ASSETS: ASSETS:
EPP Gap Analysis - EPP Gap Analysis
updated
- EPPs implementation
Plan (POIs)
- Water Management
Project

EPPs DOCUMENT approved


(Oct 2013)

© Repsol. DSMA E&P. March 2015. 5


1. EPPs 2014 Background
The implementation of EPPs in E&P is a big challenge for
various areas:

COUNTRIES DISCIPLINES AREAS


P
USA ENVIRONMENTAL:
Colombia
Ecuador
 Air emissions
 Wastewater
E&P
- DSMA E&P
E
 Biodiversity
Bolivia
Venezuela
T & Tobago
 Waste
- UURR / UUNN
- DE Exploración
- DE Desarrollo Técnico:
O
Spain
Kurdistan
ASSET MANAGEMENT:
 Greenhouse gases
 Energy efficiency
D. Global Drilling & Comp.
D. Calidad Técnica (Drilling )
P
Namibia D. Gestión de activos
Russia
Norway
DRILLING:
 Well construction CORPORATE
L
Mauritania
Peru
 Drilling fluids - DSMA
- D Ingeniería
E
Angola SEISMIC OPERATIONS

© Repsol. DSMA E&P. March 2015. 6


1. EPPs 2014 Activities
FACE TO FACE MEETINGS + FACILITIES VISITS

ASSETS MEETING ASSETS VISIT


Quito + Sta Cruz de la Sierra
Ecuador Block-16 (September 2014)
(February 2014)
DSMA E&P (3), DSMA (3)
DSMA E&P (2)
Lima (June 2014) Trinidad&Tobago (September 2014)
DSMA E&P (1) DSMA E&P (4), DSMA (2)

Madrid (July 2014)


UN Peru (2) + DSMA E&P (3) GEOPHYSIC MEETINGS
Madrid (April, May 2014)
HSE Exploration (3)
DRILLING WORKSHOPS Geophysic (1)
EPPs WORKSHOP (Madrid, 20-21 Oct 2014) DSMA E&P (4)
Drilling projects : EAA + USA + Brazil
People: 20 Muds School (Madrid, 21-22 May 2014)
- HSE: EAA, Russia, Norway, Spain, Peru, People: 20
USA, Brazil. - DSMA E&P, EAA, Spain.
- Drilling: Houston, Spain - DSMA, DI, NNEE.

© Repsol. DSMA E&P. March 2015 7


1. EPPs 2014 Global Results
Scope GAP Analysis 2014

Alaska Norway
Russia

Spain
Algeria
Kurdistán
GOM
Trinidad Libya
Aruba Mauritania
Colombia Venezuela
Ecuador Angola
Peru Brasil
Bolivia Namibia
Australia

Geophysics

Well Construction and


Testing (Drilling)

Production

© Repsol. DSMA E&P. March 2015 8


1. EPPs 2014 Global Results
Projects and Assets in E&P 2012, 2013, 2014

2012* 2013 2014

DRILLING WELLS 13 23 25
EAA 5 9 13
PACIFIC 3 9 4
CARIBBEAN 2 0 6
NORTH AMERICA 2 3 1
BRAZIL 1 2 1
SEISMIC CAMPAIGNS 8 6 15
EAA 4 3 6
PACIFIC 2 0 4
CARIBBEAN 1 2 3
NORTH AMERICA 1 0 1
AUSTRALIA 0 0 1
ASSETS 9 - 10
EAA 2 - 2
PACIFIC 5 - 6
CARIBBEAN 2 - 2

*Para 2012 es el nº de drilling campaigns y no el nº de pozos perforados como en el resto de años

© Repsol. DSMA E&P. March 2015 9


1. EPPs 2014 Global Results
GAP Analysis 2014
Compliance with EPPs 2014

85%

10%
6%

% In compliance % Out of Compliance % Unknown

96%
94% 89%
86% 82% 83%

67% 68%

24% 25%
9% 14%
8% 6% 8% 6% 10% 7%
3% 3% 4% 3% 2% 2%

Drilling Geophysical Production Biodiversity Noise Air Emissions Waste Wastewater

© Repsol. DSMA E&P. March 2015 10


2. PROJECTS
(geophysics and drilling):
2014 Results

© Repsol. DSMA E&P. March 2015 12


2. PROJECTS (geophysics & drilling): 2014 results
Follow up 2012-2014

2012* 2013 2014

DRILLING WELLS 13 23 25

EAA 5 9 13

PACIFIC 3 9 4

CARIBBEAN 2 0 6

NORTH AMERICA 2 3 1

BRAZIL 1 2 1

SEISMIC CAMPAIGNS 8 6 15

EAA 4 3 6

PACIFIC 2 0 4

CARIBBEAN 1 2 3

NORTH AMERICA 1 0 1

AUSTRALIA 0 0 1

*Para 2012 se muestra el nº de drilling campaigns y no el nº de pozos perforados como en el resto de años.

© Repsol. DSMA E&P. March 2015 13


2. PROJECTS (geophysics): results 2014
By country. Follow up 2013-2014

Geophysical 2013 per Country

100%
Geophysics 2012-2014
80% Compliance with EPPs - Geophysics

60% 86%
70%
40% 57% In compliance
Out of Compliance
Unknown
20% 32%
20%
11% 10% 8% 6%
0%
Aruba Australia Russia Brazil Guyana Tunisia

2012
2013

2014
2012

2013
2014

2012
2013
2014
% Applicability % In compliance % Out of Compliance % Unknown

Geophysical 2014 per Country

100%
80%
60%
40%
20%
0%
Aruba Australia Russia Algeria Colombia Norway Peru U.S.A Bolivia

% Applicability % In compliance % Out of Compliance % Unknown

© Repsol. DSMA E&P. March 2015 14


2. PROJECTS (drilling): results 2014
Drilling & Well Testing by country. Follow up 2013-2014

Drilling & Well Testing 2013 per Country Drilling 2012-2014


Compliance with EPPs - Drilling and Well Testing
100%
94%
80%
66%
60% 49% In compliance
39% Out of Compliance
40% 21% Unknown
13% 12% 3%
3%
20%

2012

2013
2012
2013

2014

2014

2012
2013
2014
0%
Libya Russia U.S.A Bolivia Brazil Norway Argelia Ecuador

% Applicability % In compliance % Out of Compliance % Unknown

Drilling & Well Testing 2014 per Country

100%
80%
60%
40%
20%
0%
Libya Russia U.S.A Bolivia Brazil Angola Kurdistan Mauritania Namibia T&T

% Applicability % In compliance % Out of Compliance % Unknown

© Repsol. DSMA E&P. March 2015 16


2. PROJECTS (geophysics & drilling): results 2014
Conclusions

PROJECTS: Goals achieved


- Better understanding of EPPs applicability and scope.

- Increase in the involvement of BBUU/RRUU, DE Exploration, GDC, DSMA E&P.

- Better knowledge about the compliance (less unknown situations: “yellow bars”)

PROJECTS: Actions to improve


- To be sure that the EPPs are considered in early stages of the projects.

- To clarify the EPP aplicability criteria.

- To get better implementation of the difficult ones (passive acoustic monitoring,


tree felling… etc)

- To establish with operation teams (geophysics/drilling) the EPPs to apply in each


project.

© Repsol. DSMA E&P. March 2015. 18


3. DRILLING WASTE
Objective: results 2014

© Repsol. DSMA E&P. March 2015 19


3. DRILLING WASTE Objective: results 2014
Waste Objective and EPPs

WATER

EPPs

WASTE
EMISSIONS
OBJECTIVE

© Repsol. DSMA E&P. March 2015 20


3. DRILLING WASTE Objective: results 2014
Background. Baseline 2012

Waste Map in E&P (baseline data 2012)


30000
25000
20000 Total E&P Waste 2012
15000
(63.700 t)
10000
5000
0

Decommissionin
Seismic Drilling Production
g

92% of total produced waste (58.800 t) comes


from drilling (mud and cuttings)

© Repsol. DSMA E&P. March 2015 21


3. DRILLING WASTE Objective: results 2014
EPPs Drilling Waste Roadmap. Results 2014
OBJECTIVE DG E&P 2014-2020
To implement EPPs for waste from drilling activity

100% EPPs implemented 8/18/20 8/18/20


90% 8/18/20
80% 8/18/20
8/18/20
70% 8/18/20
60%

50%

40%
8/18/20
30%

20% 8/18/20
10%

0%
8/18/2 8/18/2 8/18/2 8/18/2 8/18/2 8/18/2
8/18/2 8/18/2
0
0 0
0 0
0 0
0 0
0 0 0
0

OFFSHORE
There shall be no discharge of free oil as a result of the
EPP 54 discharge to sea of WBFs muds and WBFs cuttings
EPP 55 NAFs muds discharge to sea is not allowed • 13 wells verified according to
NAFs drill cuttings (Diesel Oil base) discharge to sea is not
EPP 56
allowed EPPs
ONSHORE • Verification by Deloitte
EPP 78
Uncontrolled pumping off of fluids is an unacceptable
onshore disposal method • 100% of compliance
Discharge to a water body is an unacceptable onshore
EPP 79 disposal methods

© Repsol. DSMA E&P. March 2015 22


4. ASSETS: 2014 Results

© Repsol. DSMA E&P. March 2015 23


4. ASSETS: 2014 Results
Assets by country. Follow up 2012-2014
Production 2012 per Country

80%
70%
60%
Assets 2012-2014
Compliance with EPPs - Asset

50%
67%
40% I
30% 47% O
U
20% 24% 33%
10% 20%
9%
0%
Bolivia Venezuela Spain Ecuador T&T

2012

2012

2014
2014

2014

2012
% Applicability % In compliance % Out of Compliance % Unknown

Production 2014 per Country

80%
70%
60%
50%
40%
30%
20%
10%
0%
Bolivia Venezuela Spain Ecuador T&T Peru

% Applicability % In compliance % Out of Compliance % Unknown

© Repsol. DSMA E&P. March 2015 24


4. ASSETS: 2014 Results
Conclusions

ASSETS: Goals achieved


- Better understanding of EPPs applicability and scope.

- Increase in the involvement of BBUU/RRUU, DSMA E&P, Gestión de Activos.

- Better knowledge about the compliance (less unknown situations: “yellow bars”)

ASSETS: Actions to improve

- Increase the EPPs compliance with the implementation of POIs

- Air emissions: VOCs minimization (fugitives and venting), flaring


minimization

- Effluents: pollutants limits in sanitary wastewater and offshore produced


water

© Repsol. DSMA E&P. March 2015 25


4. LESSONS LEARNED DURING 2012-2014
Assets & Projects

Lessons Learned

• To have more specific EPPs avoiding interpretation


and giving flexibility.

• To give instructions clearer and simpler to


RUs/BUs/Areas to fill in the gap analysis.

• To have face to face meetings / conference calls. It


improves the understanding between teams.

© Repsol. DSMA E&P. March 2015 26


4. BETTER PRACTICES TO CONSIDER UPWARD
Assets & Projects

Better Practices
• To use synergies between different projects
(Water Management project, Methane Plan,
Waste plan).

• To use specific templates for each case.

• To show specific evidences.

© Repsol. DSMA E&P. March 2015 27


5. PLAN OF
IMPLEMENTATION (POIs):
proposal 2014

© Repsol. DSMA E&P. March 2015 28


5. PLAN OF IMPLEMENTATION (POIs)
Proposal 2014.
Country POIs Dispensation Note
Spain 9 4 (air emission)
Ecuador 8 5 (air emission)
Bolivia 15 0
Venezuela 5 0
T&T 13 0

Compliance with EPPs - Asset TOTAL 50 9

67%
In compliance
47% Out of Compliance
Unknown
24% 33%
20%
9%
 Spain:
Poseidon Abandonment Plan
 Ecuador:
2012

2014

2014
2014

2012

2012

NOx and SO2 limits.

(*) 8 Exemption: Margarita/Cambeiti low risk in wastewater discharge

© Repsol. DSMA E&P. March 2015 29


5. PLAN OF IMPLEMENTATION (POIs)
Ranking of EPPs “Out of compliance”.

Ranking of EPPs in "out of compliance" situation


5
99
No of Countries “out of compliance”

4 100
128

3 117
96
2 126
127
1 129
115
0 82
99 100 128 117 96 126 127 129 115 82 131 132 104 121 101 87 110 91 111 98 114 88 85 89 97 119 109

EPPs related to Air Emissions EPPs related to Effluents

EPP 99: VOCs (selection of components)


EPP 100: VOCs (leaks detection)
EPP 128: Sanitary effluents (total N)
EPP 117: Treatment waste water design
EPP 96: Flaring/venting minimization
EPP 126: Sanitary effluents (BOD)
EPP 127: Sanitary effluents (COD)
EPP 129: Sanitary effluents (total P)
EPP 115: Wastewater Disposal plan
EPP 82: NOx emissions

© Repsol. DSMA E&P. March 2015 30


0
1
2
3
4
5
6
7
8
9
10
Bloque 16

No of Projects

2013
TSP

Casablanca

Poseidón

Bloque 16

Cambeiti

© Repsol. DSMA E&P. March 2015


Mamoré

2014
Margarita

Monteagudo

Quiriquire Gas

TSP

Casablanca

Poseidón
EFFLUENTS

Bloque 16

Cambeiti

Mamoré

2015
Margarita
AIR EMISSIONS

Monteagudo

Quiriquire Gas
POIs proposal 2014. Projects per asset and year.
5. PLAN OF IMPLEMENTATION (POIs)

TSP

Casablanca

Poseidón

Bloque 16
2016

Mamoré

Quiriquire Gas

TSP

Bloque 16
2017
TOTAL POIs = 50

TSP
31
5. PLAN OF IMPLEMENTATION (POIs)
POIs proposal 2014. Costs by projects.

Project Costs per Asset and per Environmental Vector


$2.500.000
$2.272.885
Total Cost: 5.600.000 $
• Air Emissions:
$2.000.000
2.500.000 $
• Effluents:
3.100.000 $ $1.500.000
$1.500.000

$1.000.000
$900.000
$793.594

$500.000

$10.000 $10.000 $40.000 $72.000


$250 $0 $0 $10.000 $15.000 $0
$0
EFFLUENTS AIR EFFLUENTS AIR EFFLUENTS AIR AIR EFFLUENTS AIR AIR AIR AIR EFFLUENTS AIR
EMISSIONS EMISSIONS EMISSIONS EMISSIONS EMISSIONS EMISSIONS EMISSIONS EMISSIONS EMISSIONS
Casablanca Poseidon Bloque 16 Cambeiti Mamoré Margarita Monteagudo Quiriquire TSP
Gas

Expected increase of cost

© Repsol. DSMA E&P. March 2015 32


6. WATER MANAGEMENT
Project: 2014 Results

© Repsol. DSMA E&P. March 2015. 33


6. WATER MANAGEMENT Project
WATER GLOBAL PERSPECTIVE. Increasing water management initiatives

Risk Assessment
Approach

Tools

Water Footprint

Certification
standards

Investors
Interest
Groups

Associations

ONU / EU

© Repsol. DSMA E&P. March 2015 34


6. WATER MANAGEMENT Project
2014 COMPANY OBJECTIVE

1 Establish a baseline for water management in operated


production assets through the Repsol Water Tool (RWT)

RWT update RWT results Asset water balances BU Water Reports

2 Elaborate an action plan in each BU for implementation


in 2015-2020

BU Action Plans 2015-2020

© Repsol. DSMA E&P. March 2015 35


6. WATER MANAGEMENT Project
PROJECT ALIGNMENT

Cuenta de EPP

31
30
29
28 IdEPP
27 132
26
25 119
24
23 131
22
21 129
20
Water 19
18
128
17 127
Management 16
15 126
Project 14
13 121
12
11 117
10
9 115
Effluents 8
7 114
EPPs 6
5 111
4
3 110
2
Waste Air 1
0
109

Management emissions Bloque 16 Casablanca Mamoré Poseidon TSP


INSTALACION

© Repsol. DSMA E&P. March 2015 36


6. WATER MANAGEMENT Project
REPSOL WATER TOOL (RWT). Diferent criteria to priorize.

Internal External
management management
AVAILABILITY, QUALITY AND ECOSYSTEMS OF WATER
SOURCES
MEASUREMENT
10% • SOURCE IMPORTANCE 10%
• LEVEL OF INSTRUMENTATION • WATER BODY SIGNIFICANTLY AFFECTED, DROUGHT,
CLIMATE CHANGE AND ECOSYSTEMS STRESS

AVAILABILITY, QUALITY AND ECOSYSTEMS OF RECEIVING


WATER USED WATER
• FRESH WATER (20%)
15% • SOURCE IMPORTANCE 10%
• WATER BODY SIGNIFICANTLY AFFECTED, DROUGHT,
• PRODUCTION WATER (80%) CLIMATE CHANGE AND ECOSYSTEMS STRESS

FUTURE DEMAND


WATER SCARCITY
AGRICULTURE (33%)
15%
WATER TREATMENT 5% • POPULACION (33%)
• INDUSTRY (33%)
• WATER WITHDRAWAL TREATMENT
• MANAGEMENT WATER EXPENSES
• WATER DISCHARGE TREATMENT(100%) REGULATORY AND BUSINESS RISKS
• 15%

REGLATORY RISKS (50%)
FINES (20%)
15%
• CURRENT IMPROVEMENT PLANS (30%)
DISCHARGE WATER QUALITY 10%
SOCIAL RISKS
• EXPOSURE(40%)
• AVAILABILITY AND QUALITY FOR WATER HUMAN
10%
© Repsol. DSMA E&P. March 2015 SUPPLY (60%)
37
6. WATER MANAGEMENT Project
REPSOL WATER TOOL (RWT): RESULTS. Water Management Baseline in E&P.

Measurement score

Internal Future Demand


4.00
Water use score
management
Block 16 due to the 2.00
Casablanca
volumes of sanitary and Poseidon
produced water managed Risk social score Source score Bloque 16

Trinidad & Tobago 0.00


Venezuela
TyT
because of the out of Margarita
specification withdrawals Mamoré
into the sea. Cambeiti
Monteagud
Risk R&B score Receiving body score o

External Threats:
Water quality score Water treatment score
Margarita for being in
water shortage area
Margarita
Block 16 for the impact
on its water bodies TSP
Block 16
© Repsol. DSMA E&P. March 2015 38
6. WATER MANAGEMENT Project
REPSOL WATER TOOL (RWT): RESULTS. Main areas of
performance. Action Plan 2015-2020.
EPPs COMPLIANCE
• Total coordination with the EPP project. POIs definition.

WATER BODIES AND WATER BALANCE


• Instrumentation plan in order to get better knowledge of water use
• Water surface and groundwater bodies characterizarion

WATER USE MANAGEMENT


• To incorporate the rainwater management on assets
• Reuse of water particularly in places with drilling campaigns and potencial water
shortage areas
• Social risk management in sensitive areas

TECHNOLOGIES
• Identified and study potencial technologies and cost associated with the wastewater
treatment to evaluate whether the assets are technologically prepared for the future.
• Production water management alternatives

© Repsol. DSMA E&P. March 2015 39


6. WATER MANAGEMENT Project
WATER MANAGEMENT BU ACTION PLANS 2015-17

Number of Projects per Year and Country


EPPs No EPPs
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0
ECUADOR TRINIDAD & SPAIN BOLIVIA ECUADOR TRINIDAD & SPAIN BOLIVIA ECUADOR TRINIDAD & VENEZUELA BOLIVIA ECUADOR TRINIDAD & ECUADOR TRINIDAD &
TOBAGO TOBAGO TOBAGO TOBAGO TOBAGO
2013 2014 2015 2016 2017

© Repsol. DSMA E&P. March 2015 41


6. WATER MANAGEMENT Project
WATER MANAGEMENT BU ACTION PLANS 2015-17. Costs per asset.

Cost per Asset and per Type of Project


$2.500.000
$2.272.885
TOTAL COST = 4.300.000 $
$2.000.000

$1.500.000

$1.000.000
$793.594

$500.000
$340.500 $310.000 $335.500
$217.000

$10.000 $0 $250 $25.000 $500 $10.000 $14.000


$0
EPPs No EPPs EPPs No EPPs No EPPs EPPs No EPPs No EPPs No EPPs EPPs No EPPs EPPs No EPPs
Casablanca Poseidón Cambeiti Mamoré Margarita Monteagudo Bloque 16 TSP Quiriquire
Gas

© Repsol. DSMA E&P. March 2015 42


7. NEXT STEPS: Plan 2015

© Repsol. DSMA E&P. March 2015 43


7. NEXTS STEPS: Plan 2015
Snapshot 2012-2015

2012 2013 2014 2015


PROJECTS:
PROJECT (Seismic and Drilling):EPP Gap Analysis PROJECTS: - EPP Gap Analysis
- EPP Gap Analysis - GIP
- Drilling waste objective - Drilling waste objetive

ASSETS: ASSETS: ASSETS:


EPP Gap Analysis. - EPP Gap Analysis - EPPs implementation
updated. Plan (POIs): follow up.
- EPPs implementation - Inclusion the EPPs in
Plan (POIs): definition. ORPs.
- Water objetive.

EPPs DOCUMENT EPPs DOCUMENT


approved (Oct 2013) UPDATED

EMISphere Tool Pilot


Implementation

© Repsol. DSMA E&P. March 2015 44


7. NEXTS STEPS: Plan 2015
EPPs Proposal Activities 2015

MEETINGS VISIT TO ASSETS


UN USA (Madrid, Jan 2015)
UN USA (3) + DSMA E&P (4) Bolivia (April 2015)
BU, D. Ingenieria , DSMA
D.E. Exploration (Madrid, Jan-Feb 2015)
HSE Exploration , DSMA E&P Peru Kinteroni (June 2015)
BU, DSMA E&P, DSMA

ORPs (during 2015)


WORKSHOPS DSMA E&P , Assets Management, BU
Attendance to the Muds School (Houston,
Sept 2015)
GDC, DSMA E&P, BU USA, ….. EPPs DOCUMENT
UPDATED
Ask for comments
ASSESSMENT FROM BBUU/RRUU, DE Exploration, DSMA
TECHNOLOGY (CTR) E&P and corporate areas
DSMA E&P / CTR
Review the analytical methods for monitoring DRILLING – EPPs
of the EPPs parameters/compounds . Develop New Templates
a proposal . Comments
GDC, RRUU/BBUU, DSMA E&P

© Repsol. DSMA E&P. March 2015. 45


7. NEXTS STEPS: Plan 2015 Actions2
Action Plan
EPPs Plan 2015 015
2015

 Gap analysis for new campaigns


Geophysics  Discussions with HSE Exploration/Geophysics on EPP applicability
and interpretation

 Gap analysis for new campaigns:current excel or new templates (*)


Drilling

 POIs follow up quarterly (air emissions / water map)


Assets

EPPs
 Comments to draft
document
update
(*) PURPOSE:
• To ease the gap analysis process according to several complaints (no specific and big)
• To take into consideration the agreements reached on the October Drilling workshop
• To facilitate the compliance (e.g.: tool EPP 120 avoids to make a Risk Analysis)
© 46
• Not to add new requirements to the EPPs.
7. NEXTS STEPS: Plan 2015
EPPs Drilling Waste Objetive in 2015

GLOBAL DRILLING & COMPLETION


Support to EPPs Project
a. GDC PARTICIPATION TO ELABORATE EPPs (2012-2013)
b. MUD School May 2014
c. E&P Direction Madrid workshop (agree to review
evidences and EPPs) October 2014
d. EPPs vs Waste Management Standard 2015
e. Comments to Waste Management Standard 2015
f. EPPs Objective 2015 – 2020 / evidences for EPPs
compliance
© Repsol. DSMA E&P. March 2015. 47
7. NEXTS STEPS: Plan 2015
EPPs Drilling Waste Objetive in 2015

Implement of Environmental Performance Practices (EPPs) in accordance to 2014-2020 projection


2015
2015 This objective applies to scheduled drilling program (wells finished before December 1 st , 2015).
Objective
Objective Objective completed if verified externally the implement of the EPPs in accordance with received evidences

DG E&P
To implement EPPs for waste 2014-2020
from PROJECTION
drilling activity

100% EPPs 8/18/20


8/18/20 8/18/20
8/18/20
EPPs implemented
implemented
90% 8/18/20
80% 8/18/20 • Drilled wells will be
8/18/20
8/18/20
70%

60%
verified according to EPPs
50% • Similar verification plan as
40%
8/18/20
8/18/20 in 2014
30%

20% 8/18/20
8/18/20
10%

0%
8/18/2 8/18/2
8/18/2 8/18/2
8/18/2 8/18/2
8/18/2 8/18/2
8/18/2 8/18/2 8/18/2
8/18/2
0
0 0 0 0 0 0
0 0
0

2014 2015
OFFSHORE OFFSHORE
There shall be no discharge of free oil as a result of the discharge Feasible alternatives for the disposal of offshore WBFs, OBFs,
EPP 54 EPP 53
to sea of WBFs muds and WBFs cuttings SBFs and associated cuttings are to be evaluated
EPP 55 NAFs muds discharge to sea is not allowed
EPP 72 Prepare a Disposal Plan for fluids and cuttings discharge
EPP 56 NAFs drill cuttings (Diesel Oil base) discharge to sea is not allowed
ONSHORE ONSHORE
Uncontrolled pumping off of fluids is an unacceptable onshore Feasible alternatives for the disposal of onshore WBDF, NADF
EPP 78 EPP 74 and associated cuttings are to be evaluated
disposal method
Discharge to a water body is an unacceptable onshore disposal Unacceptable Onshore disposal methods (which may lead to
EPP 79 EPP 77
methods pollution problems) is trenching
©
7. NEXTS STEPS: Plan 2015
WATER Management 2015 Company Objetive

• Ecuador, Bloque 16
Company Goal
• Bolivia, Margarita
2015 • Trinidad y Tobago, TSP

Action Plan • All the assets


2015-2020
Business Unit objetive

© Repsol. DSMA E&P. March 2015 50


7. NEXTS STEPS: Plan 2015
WATER Management. Stages Action Plan 2015-2020 E&P
• To conduct the studies identified in the Action Plan to get a better
Phase I: knowledge of the real situation of the asset.
2015 • Define and implement instrumentation plan to improve the
management of water withdrawal and wastewater
• POIs Implementation

• Setting quantitative targets for water consumption and risk


Phase II: reduction where relevant
2016-2018 • Further studies to know the situation of water bodies
• POIs Implementation

Phase III: • Evaluation of the effectiveness of the


2019-2020 implemented actions and next steps for the
future

Main Conclusion
• Base line of water map has been developed for 9 E&P Assets
• Action Management plan has been defined for 2015-2020
• Cost estimation of implementing this action plan is 4 MM USD

© Repsol. DSMA E&P. March 2015 51


7. NEXT STEPS: Plan 2015
EMISphere Project

Repsol has acquired the product E-Suite to support environmental management and
environmental reporting in all assets throughout the whole company.

E-Suite is being implemented in Repsol under the EMISphere project.


The provider of E-Suite is IHS, based in USA.

Like Repsol, all major Oil&Gas companies are working on what is generally known as an
EMIS (Emission Monitoring Information System) Project:

The challenge in E&P consists in obtaining a unique


system to carry out the environmental complete
performance.
In detail, a global compliance including:
- EPPs
- Legal local requirements
- Internal and external reporting

© Repsol. DSMA E&P. March 2015 52


7. NEXT STEPS: Plan 2015
EMISphere deployment in DG E&P

2014 2015

E-Suite implementation in the big EMISphere deployment


Downstream facilities in Spain: strategy in Repsol E&P:
5 refineries and 1 chemical plant study and analyze the global
implementation strategy in
DG E&P.

Initial evaluation in ALASKA Pilot implementation in ALASKA Exploration


Exploration Project Project

Initial evaluation in PERU Pilot implementation in PERU Kinteroni Asset


Kinteroni Asset

Develop another pilot


implementation in an asset
according with the strategy
defined (2nd semester 2015 /
2016)
© Repsol. DSMA E&P. March 2015
THANK YOU

© Repsol. DSMA E&P. March 2015.


8. Annex

© Repsol. DSMA E&P. March 2015 56


8.1. Annex Bolivia

© Repsol. DSMA E&P. March 2015 57


8.1. Annex BOLIVIA
Geophysics. Follow up 2013-2014
All Projects 2014
78%

20%
8% 13%

Bolivia - Geophysical (2014)

80%
77%

20% 20%
13% 13%
7% 10%

Huacaya L2d Margarita Sur L2d


% Applicability % In compliance % Out of Compliance % Unknown

© Repsol. DSMA E&P. March 2015 58


8.1. Annex BOLIVIA
Drilling and Well Testing. Follow up 2013-2014
All Projects 2013-2014
2013 90% 2014
83%

12% 11% 6% 13% 5%


5%

Bolivia - Drilling & Well Testing (2013)

85% 85% 81% 81%

13% 10% 5% 13% 10% 5% 11% 13% 6% 11% 13% 6%

Mgr-5 Mgr-6 Plm-a8 Srb-no5


% Applicability % In compliance % Out of Compliance % Unknown

Bolivia - Drilling & Well Testing (2014)


89% 89% 90% 90%

12% 12% 14% 14%


6% 6% 6% 6% 5% 5% 5% 5%

Surubi Bb112 Surubi No4 St Srbd5 Srb-no5


% Applicability % In compliance % Out of Compliance % Unknown
© Repsol. DSMA E&P. March 2015 59
8.1. Annex BOLIVIA
Assets. Follow up 2012-2014
All Assets 2012-2014
81%
2012 2014
60%

23% 26%
14% 17% 16%
3%

Bolivia - Assets (2012)


70%
58% 58% 57%

29% 32% 30%


25% 25% 25%
18% 19%
11% 13% 11% 14%

Cambeiti Mamore Margarita Monteagudo


% Applicability % In compliance % Out of Compliance % Unknown

93%
Bolivia - Assets (2014)
84% 83%
70%

30%
20% 21%
16% 13%
10% 7% 10% 6%
0% 0% 4%

Cambeiti Mamore Margarita Monteagudo


% Applicability % In compliance % Out of Compliance % Unknown

© Repsol. DSMA E&P. March 2015 60


8.1. Annex BOLIVIA
Plans of Implementation (POIs) 2014
Asset Env. Vector POIs Exemptions Asset Env. Vector POIs Exemptions
Air 1 0 Air 2 0
Cambeiti Margarita Pendiente de definir
Effluents 0 5 Effluents 0 3 necesidad 1 Nuevo
Air 5 0 POIs tras cierre de
Mamoré Air 1 0
Monteagudo diciembre de 2014:
Effluents 4 0
Effluents 0 0 EPP 86

No of POIs
2 Nuevos POIs tras cierre
10 de diciembre de 2014:
EPPs 129 y 132
9

8
EPP
7
129
6
128 Effluents
5 127
126
4
104
3 97
96 Air Emissions
2
91
1 82

0
Margarita

Monteagudo
Cambeiti

Margarita
Mamoré

Mamoré

Mamoré
Monteagudo
Cambeiti

2014 2015 2016 2018…


© Repsol. DSMA E&P. March 2015 61
8.1. Annex BOLIVIA
Repsol Water Tool (RWT). Results 2014

Measurement score

4.00
Future Demand score Water use score

2.00

E&P Bolivia- Caibenti


Risk social score Source score
E&P Bolivia-Monteagudo
0.00 E&P Mamoré
E&P Margarita

Risk R&B score Receiving body score

Water quality score Water treatment score

© Repsol. DSMA E&P. March 2015 62


8.1. Annex BOLIVIA
Water Management Project: Action Plans 2015-2020

No of Projects No EPPs EPPs

582.000 $
7

- INSTRUMENTATION
6
- DECREASE WATER CONSUMPTION
- SANITARY WATER DISCHARGE
5 - WATER BODIES ANALYSIS

0
Margarita Cambeiti Mamoré Margarita Monteagudo Mamoré Margarita Monteagudo
2014 2015 2016

© Repsol. DSMA E&P. March 2015 63


8.2. Annex Ecuador

© Repsol. DSMA E&P. March 2015 64


8.2. Annex ECUADOR
Drilling and Well Testing. Follow up 2013-2014
All Projects 2013
47%

35%

18%
11%

Ecuador - Drilling & Well Testing (2013)

47% 47% 47% 47% 47%

35% 35% 35% 35% 35%

18% 18% 18% 18% 18%


11% 11% 11% 11% 11%

Daimi B 30h Daimi B 31h Daimi B 33h Ginta A 19h Ginta A 51

% Applicability % In compliance % Out of Compliance % Unknown

© Repsol. DSMA E&P. March 2015 65


8.2. Annex ECUADOR
Assets. Follow up 2012-2014

Ecuador - Bl-16 & Tivacuno (2012)

44%
40%
32%

17%

% Applicability % In compliance % Out of Compliance % Unknown

Ecuador - Bl-16 & Tivacuno (2014)

54%

32%
27%

15%

% Applicability % In compliance % Out of Compliance % Unknown

© Repsol. DSMA E&P. March 2015 66


8.2. Annex ECUADOR
Plans of Implementation (POIs) 2014
Asset Env. Vector POIs Dispensation
Air 1 5
Bloque 16
Effluents 7 0

No of POIs
7

5
EPP
131
4 129
128
Effluents
3 127
119

2 115
100 Air Emissions

0
Bloque 16 Bloque 16 Bloque 16 Bloque 16 Bloque 16
2013 2014 2015 2016 2017
2018…

© Repsol. DSMA E&P. March 2015 67


8.2. Annex ECUADOR
Repsol Water Tool (RWT). Results 2014 (Bloque 16)

Measurement score

4.00
Future Demand score Water use score

2.00

Risk social score Source score

0.00

Risk R&B score Receiving body score

Water quality score Water treatment score

© Repsol. DSMA E&P. March 2015 68


8.2. Annex ECUADOR
Water Management Project: Action Plans 2015-2020 (Bloque 16)

No of Projects No
No EPPs
EPPs EPPs
EPPs

8
8
1,103,594 $
7
7 - INSTRUMENTATION
- SOCIAL
6 - DECREASE WATER CONSUMPTION
- IMPROVEMENT IN THE QUANTITY OF
5
5 PRODUCED WATER
- SANITARY WATER DISCHARGE
4
4
- WATER BODIES ANALYSIS AND
REMEDIATION IF REQUIRED
3
3

2
2

1
1

0
0
Bloque
Bloque 16
16 Bloque
Bloque 16
16 Bloque
Bloque 16
16 Bloque
Bloque 16
16 Bloque
Bloque 16
16
2013
2013 2014
2014 2015
2015 2016
2016 2017
2017

© Repsol. DSMA E&P. March 2015 69


8.3. Annex Perú

© Repsol. DSMA E&P. March 2015 70


8.3. Annex PERU
Geophysics. Follow up 2013-2014
All Projects 2014
88%

29%

7% 5%

Peru - Geophysical (2014)


88% 88%

29% 29%

7% 5% 7% 5%

Mapi & Mashira 2d Sagari 3d

% Applicability % In compliance % Out of Compliance % Unknown

© Repsol. DSMA E&P. March 2015 71


8.3. Annex PERU
Assets. Follow up 2012-2014

Peru - Kinteroni (2014)

40%
36%

24%

17%

% Applicability % In compliance % Out of Compliance % Unknown

© Repsol. DSMA E&P. March 2015 72


8.4. Annex Venezuela

© Repsol. DSMA E&P. March 2015 73


8.4. Annex VENEZUELA
Assets. Follow up 2012-2014
Venezuela - Quiriquire (2012)

52%
39%

15%
9%

% Applicability % In compliance % Out of Compliance % Unknown

Venezuela - Quiriquire (2014)


80%

20%
13%
0%

% Applicability % In compliance % Out of Compliance % Unknown

© Repsol. DSMA E&P. March 2015 74


8.4. Annex VENEZUELA
Plans of Implementation (POIs) 2014

Asset Env. Vector POIs


Air 4
Quiriquire Gas
Effluents 0

1 Nuevo POI tras cierre


No of POIs
de diciembre de 2014:
EPP 115
5

EPP
4

3
101
100
2
96
82
1

0
Quiriquire Gas Quiriquire Gas Quiriquire Gas
2014 2015 2016

© Repsol. DSMA E&P. March 2015 75


8.4. Annex VENEZUELA
Repsol Water Tool (RWT). Results and Action Plans 2015-2020
(Quiriquire Gas)

335.000 $
Measurement score (2015)
Future Demand score 1.00 Water use score
- INSTRUMENTATION
- ENVIRONMENTAL RISK
0.50
Risk social score Source score
0.00 1- Analysis of soil/groundwater.
2- External study: Influence of
asset wastewater discharge in
the ecosystem.
Risk R&B score Receiving body score

Water quality Water


score treatment score

*Datos de 2011.

© Repsol. DSMA E&P. March 2015 76


8.5. Annex Trinidad &
Tobago

© Repsol. DSMA E&P. March 2015 77


8.5. Annex TRINIDAD & TOBAGO
Drilling and Well Testing. Follow up 2013-2014
All Projects 2014
91%

12% 7% 3%

T&T - Drilling and Well Testing (2014)

95% 94% 94% 94%


88%
75%

19% 15%
11% 13% 11% 12% 12% 11%
6% 5% 0% 6% 6% 6%
0% 0% 0% 0%

Infill G Pinta 1 Arima Infill Tbn2 Tbn Ext Tbn3

% Applicability % In compliance % Out of Compliance % Unknown

© Repsol. DSMA E&P. March 2015 78


8.5. Annex TRINIDAD & TOBAGO
Assets. Follow up 2012-2014
T&T - Teak, Samaan & Poui (2012)

50%

29%
21%
16%

% Applicability % In compliance % Out of Compliance % Unknown

T&T - Teak, Samaan & Poui (2014)

50%
39%

12% 11%

% Applicability % In compliance % Out of Compliance % Unknown

© Repsol. DSMA E&P. March 2015 79


8.5. Annex TRINIDAD & TOBAGO
Plans of Implementation (POIs) 2014
Asset Env. Vector POIs
Air 2
TSP
Effluents 11

No of POIs
13

12

11

10
EPP
9 121
8 117

7 115
Effluents
114
6
111
5 110
4 109
100
3 Air Emissions
96
2

0
TSP TSP TSP TSP TSP
2013 2014 2015 2016 2017 2018…

© Repsol. DSMA E&P. March 2015 80


8.5. Annex TRINIDAD & TOBAGO
Repsol Water Tool (RWT). Results 2014 (Teak, Samaan, Poui)

Measurement score

4.00
Future Demand score Water use score

2.00

Risk social score Source score

0.00

Risk R&B score Receiving body score

Water quality score Water treatment score

© Repsol. DSMA E&P. March 2015 81


8.5. Annex TRINIDAD & TOBAGO
Water Management Project: Action Plans 2015-2020 (Teak,
Samaan, Poui)
No of Projects EPPs
2.300.000 $
8

- WATER PRODUCTION DISCHARGE


7 - SANITARY WATER DISCHARGE
- WATER PRODUCTION REINJECTION
6

0
TSP TSP TSP TSP TSP
2013 2014 2015 2016 2017

© Repsol. DSMA E&P. March 2015 82


8.6. Annex Spain

© Repsol. DSMA E&P. March 2015 83


8.6. Annex SPAIN
Assets. Follow up 2012-2014
All Assets 2012-2014
70%
2012 2014
57%

23%
19% 24%
14% 10% 7%

Spain - Assets (2012)

65%
50%

23% 27%
20%
13% 15% 15%

Casablanca Poseidon
% Applicability % In compliance % Out of Compliance % Unknown

Spain - Assets (2014)


78%

58%
42%

12% 11% 11% 8%


0%

Casablanca Poseidon
% Applicability % In compliance % Out of Compliance % Unknown
© Repsol. DSMA E&P. March 2015 84
8.6. Annex SPAIN
Plans of Implementation (POIs) 2014
Asset Env. POIs Dispensation
Vector

Air 2 0
Casablanca
Effluents 1 0
Air 1 4
Poseidón
Effluents 5 0 POIs realizados

No of POIs
6

5
EPP

4 132
129
3 128 Effluents

126
115
2
100
Air Emissions
99
1

0
Casablanca Poseidon Casablanca Poseidon Casablanca Poseidon
2014 2015 2016

© Repsol. DSMA E&P. March 2015 85


8.6. Annex SPAIN
Repsol Water Tool (RWT). Results 2014

Measurement score

2.00
Future Demand score Water use score

1.00

Risk social score Source score


E&P Casablanca
0.00 E&P Poseidón

Risk R&B score Receiving body score

Water quality score Water treatment score

© Repsol. DSMA E&P. March 2015 86


8.6. Annex SPAIN
Water Management Project: Action Plans 2015-2020

No of Projects No EPPs EPPs


35.000 $
3

- SOCIAL
- WATER PRODUCTION DISCHARGE PERMIT
- SANITARY WATER DISCHARGE

0
Casablanca Poseidón Casablanca Poseidón
2014 2015

© Repsol. DG E&P. March 2015 87


8.7. Annex Russia

© Repsol. DSMA E&P. March 2015 88


8.7. Annex RUSSIA
Geophysics. Follow up 2013-2014
All Projects 2013-2014
2013 67%
82% 2014

33%
14% 13% 18%
0% 0%

Russia - Geophysical (2013)


67%

33%
14%
0%

Kumolskiy
% Applicability % In compliance % Out of Compliance % Unknown

Russia - Geophysical (2014)


90% 90%
74% 74%

26% 26%
13% 10% 13% 13% 13% 10%
0% 0% 0% 0%

Karabashsky 2d Kumolsky 2d C20 Kumolsky 2d C25 Salymsky 2d

% Applicability % In compliance % Out of Compliance % Unknown

© Repsol. DSMA E&P. March 2015 89


8.7. Annex RUSSIA
Drilling and Well Testing. Follow up 2013-2014
All Projects 2013-2014
100%
2013 2014
94%

6% 6% 7%
0% 0% 0%

Russia - Drilling & Well Testing (2013)


100%
91%

5% 7% 9%
0% 0% 0%

Gabi 1 Gabi 3
% Applicability % In compliance % Out of Compliance % Unknown

Russia - Drilling & Well Testing (2014)


100% 100% 100% 100%

5% 7% 7% 7% 0% 0%
0% 0% 0% 0% 0% 0%

K4p 1p K-3 (karabashsky) 31p & 32p (karabashsky) Gabi1_testing


% Applicability % In compliance % Out of Compliance % Unknown
© Repsol. DSMA E&P. March 2015 90
8.8. Annex USA

© Repsol. DSMA E&P. March 2015 91


8.8. Annex USA
Geophysical. Follow up 2013-2014

USA - Alaska Schraeder Bluff L3D (2014)

87%

10% 13%
0%

% Applicability % In compliance % Out of Compliance % Unknown

© Repsol. DG E&P. March 2015 92


8.8 Annex USA
Drilling and Well Testing. Follow up 2013-2014
All Projects 2013-2014
95%
2013 75% 2014

25%
13% 14%
0% 0% 5%

USA - Drilling & Well Testing (2013)


76% 71% 76%

24% 29% 24%


14% 11% 14%
0% 0% 0%

Qugruk 1 Qugruk 3 Qugruk 6


% Applicability % In compliance % Out of Compliance % Unknown

USA - Drilling & Well Testing (2014)


95%

14%
0% 5%

GOM Leon Well


% Applicability % In compliance % Out of Compliance % Unknown

© Repsol. DG E&P. March 2015 93


8.9. Annex Europa, Asia,
Africa Regional Unit

© Repsol. DSMA E&P. March 2015 94


8.9. Annex EAA- Algeria
Geophysical. Follow up 2013-2014

Algeria - Illizi 3D (2014)


100%

6% 0% 0%

% Applicability % In compliance % Out of Compliance % Unknown

© Repsol. DSMA E&P. March 2015 95


8.9. Annex EAA- Algeria
Drilling and Well Testing. Follow up 2013-2014
All Projects 2013
79%

6% 11% 11%

Algeria - Drilling (2013)


83%
75% 75%

8% 8% 8% 13% 13% 13% 13%


5% 5%

Tde1 Tene1 Wda1

% Applicability % In compliance % Out of Compliance % Unknown

© Repsol. DSMA E&P. March 2015 96


8.9. Annex EAA- Libya
Drilling and Well Testing. Follow up 2013-2014
All Projects 2013-2014
100%
2013 2014
66%

29%
19%
5% 7% 0% 0%

Libya - Drilling & Well Testing (2013)

65% 67%

29% 30%
21% 18%
6% 4%

A1 129/02 A1 129/04

% Applicability % In compliance % Out of Compliance % Unknown

Libya - Drilling & Well Testing (2014)


100% 100% 100% 100%

7% 7% 7% 7%
0% 0% 0% 0% 0% 0% 0% 0%

Khaima Sanam Wedan Agrub B1 120/04


% Applicability % In compliance % Out of Compliance % Unknown

© Repsol. DSMA E&P. March 2015 97


8.9. Annex EAA- Norway
Geophysics. Follow up 2013-2014

Norway - Hagar M2D HR (2014)


94%

11% 6%
0%

% Applicability % In compliance % Out of Compliance % Unknown

© Repsol. DGSMA E&P. March 2015 98


8.9. Annex EAA- Norway
Drilling and Well Testing. Follow up 2013-2014
All Projects 2013
83%

10% 17%
0%

Norway - Drilling and Well Testing (2013)

87%
80%

20%
10% 10% 13%
0% 0%

Brattholmen Darwin
% Applicability % In compliance % Out of Compliance % Unknown

© Repsol. DSMA E&P. March 2015 99


8.9. Annex EAA- Kurdistan
Drilling and Well Testing. Follow up 2013-2014
All Projects 2014
100%

7% 0% 0%

Kurdistan - Drilling and Well Testing (2014)


100% 100%

7% 7%
0% 0% 0% 0%

Binari Zewe 1
% Applicability % In compliance % Out of Compliance % Unknown

© Repsol. DG E&P. March 2015 100


8.9. Annex EAA- Mauritania
Drilling and Well Testing. Follow up 2013-2014

Mauritania - Ougilla 1 (2014)


100%

7%
0% 0%

% Applicability % In compliance % Out of Compliance % Unknown

© Repsol. DSMA E&P. March 2015 101


8.9. Annex EAA- Namibia
Drilling and Well Testing. Follow up 2013-2014

Namibia - Welwitschia (2014)


100%

11%
0% 0%

% Applicability % In compliance % Out of Compliance % Unknown

© Repsol. DSMA E&P. March 2015 102


8.9. Annex EAA- Angola
Drilling and Well Testing. Follow up 2013-2014

Angola - Locosso 1 (2014)


100%

15%
0% 0%

% Applicability % In compliance % Out of Compliance % Unknown

© Repsol. DSMA E&P. March 2015 103


8.10. Annex Caribbean
Regional Unit

© Repsol. DSMA E&P. March 2015 104


8.10. Annex CARIBBEAN- Colombia
Geophysics. Follow up 2013-2014
All Projects 2014
97%

11%
0% 3%

Colombia - Geophysical (2014)


100%
94%

11% 11%
6%
0% 0% 0%

Guajira M2d Siluro M2d

% Applicability % In compliance % Out of Compliance % Unknown

© Repsol. DSMA E&P. March 2o15 105


8.10. Annex CARIBBEAN- Aruba
Geophysics. Follow up 2013-2014
Aruba - 2D (2013)

72%

22%
12%
6%

% Applicability % In compliance % Out of Compliance % Unknown

Aruba - 3D (2014)
100%

11%
0% 0%

% Applicability % In compliance % Out of Compliance % Unknown

© Repsol. DSMA E&P. March 2015 106


8.11. Annex Australia

© Repsol. DSMA E&P. March 2015 107


8.11. Annex AUSTRALIA
Geophysics. Follow up 2013-2014

Australia - WCB 3D (2013)


68%

26%
13%
5%

% Applicability % In compliance % Out of Compliance % Unknown

Australia - WCB 2D (2014)


88%

11% 12%
0%

% Applicability % In compliance % Out of Compliance % Unknown

© Repsol. DSMA E&P. March 2015 108


8.12. Annex Brazil

© Repsol. DSMA E&P. March 2015 109


8.12. Annex BRAZIL
Drilling and Well Testing. Follow up 2013-2014
All Projects 2013-2014
2013 2014
87%
81%

14% 19% 15% 13%


0% 0%

Brazil - Drilling & Well Testing (2013)


85%
78%

22%
15% 13% 15%
0% 0%

Panoramix Iii Vampira


% Applicability % In compliance % Out of Compliance % Unknown

Brazil - Drilling & Well Testing (2014)


87%

15% 13%
0%

Campos Basin. Seat 2


% Applicability % In compliance % Out of Compliance % Unknown

© Repsol. DSMA E&P. March 2015 110