Professional Documents
Culture Documents
Optimization Lab Project 1-Semi-Batch Process Optimization Group No. 7
Optimization Lab Project 1-Semi-Batch Process Optimization Group No. 7
Project 1-Semi-batch
process Optimization
Group No. 7
QUICK LOOK AT THE REACTION
A + B k1 C (desired)
k2 D (undesired)
B + C
REACTANT A
REACTANT B
Distillation column
COOLING WATER
IN
OUTLET
COOLING WATER MIXTURE
OUT
BOTTOMS
PROCESS DETAILS
OOPS LOW
PROFITS! ☹️
HERE COMES A CHEMICAL ENGINEER!
• By introducing heat effects in the current process we can obtain the right
amount of coolant water flowrate and right area of condenser required.
• We can optimize the holding time and the dosing time of the process.
• By such optimization the operating costs will be minimized.
• Regular maintenance of all the equipments used and continuous monitoring
of the market value of the equipments will minimize the fixed costs.
•Dosing time:10.22 hrs
•Holding time:000278 hrs
Post
optimization •Final cash flow:702 crore/year
Cash flow=358
crore/year
� Cash flow=702
crore/year