The document summarizes the Mumbai Metro Line 3 project from Colaba to Bandra to Santacruz. Some key details:
- The project aims to provide efficient transportation connectivity in Mumbai.
- J. Kumar Infraprojects Ltd is constructing 4 stations along the 5.79 km stretch using cut-and-cover and tunneling methods.
- Work is ongoing at Santacruz, Vidyanagri and BKC stations involving excavation, piling, and station structure. Two tunnel boring machines are currently working.
The document summarizes the Mumbai Metro Line 3 project from Colaba to Bandra to Santacruz. Some key details:
- The project aims to provide efficient transportation connectivity in Mumbai.
- J. Kumar Infraprojects Ltd is constructing 4 stations along the 5.79 km stretch using cut-and-cover and tunneling methods.
- Work is ongoing at Santacruz, Vidyanagri and BKC stations involving excavation, piling, and station structure. Two tunnel boring machines are currently working.
The document summarizes the Mumbai Metro Line 3 project from Colaba to Bandra to Santacruz. Some key details:
- The project aims to provide efficient transportation connectivity in Mumbai.
- J. Kumar Infraprojects Ltd is constructing 4 stations along the 5.79 km stretch using cut-and-cover and tunneling methods.
- Work is ongoing at Santacruz, Vidyanagri and BKC stations involving excavation, piling, and station structure. Two tunnel boring machines are currently working.
Introduction Name of the project: MUMBAI METRO LINE 3 (Colaba – Bandra – SPEEZ) Work Package 5 (Dharavi to Santacruz)
Objective of the project: Efficient connectivity and transportation
Client: Mumbai Metro rail corporation Ltd. (MMRCL) Contractors: J. Kumar Infraprojects Ltd. Principal Consultant: MAPLE Architects: Joined (Omikrone kappa and Indus ) Scope of Work: Constructing 4 stations- Santacruz, Vidyanagri, Bandra- Kurla Complex, Dharavi. By cut and cover method. Tunneling- tunneling with NATM method. Total stretch of the package: 5.79 Kms Total Cost of the project: 2820 Cr. (approx) Status of the project Santacruz Station- Excavation, piling, shoring and strutting, going on. Vidyanagri Station- Station work in progress. Base slab casted. BKC Station- Excavation done, Base slab to be casted soon. Dharavi Station- Excavation, piling, shoring and strutting, going on. Tunneling- 2 TBMs working, 1 TBM to be mobilized soon. 1TBM to complete 300-400m Probable Activities Santacruz Station- Ventilation Shaft, Excavation, Shoring and Strutting, mucking. Vidyanagri Station- Station elements and activities BKC Station- Baseslab, Micropiles for foundation, Station activities, flood walls, slabs, shaft anchoring, shotcreting. Dharavi Station- Excavation patterns, Girder fixing, Shoring and strutting, Mucking disposal, Traffic diversion, Decking. Tunneling- Retreival of 1 TBM and Mobilization and initial drive of 1 TBM. Casting Yard- Precast segments, Precast rings, Precast Station elements.
Previous activities studied by Yash Patel: Excavation in layers, Anchoring in shaft, TBM main drive, Piling. Site Photographs