Professional Documents
Culture Documents
Ltelowthroughput Analysis & Improvement Techniques
Ltelowthroughput Analysis & Improvement Techniques
Ltelowthroughput Analysis & Improvement Techniques
analysis &
improvement
techniques
objective
› Analysis flow for low throughput investigation from
performance counters point of view
›
Demonstrate throughput improvement with
practical cases.
›
Key learnings.
objective
› Analysis flow for low throughput investigation from
performance counters point of view
›
Demonstrate throughput improvement with
practical cases.
›
Key learnings.
Co n t en t
CQI ,64/16QAM,TM Av CQI, % 64QAM samples and RI indicates DL SINR status
modes Average CQI should be high (>10%), % of 64QAM sample should be high (>10%),
PRB(DL) and High PRB and PDCCH utilization would impact the DL
PDCCH utilization Throughput (pmPrbUtilDl / pmPrbUtilUl).
Good i m p r o v e m e n t i n T h r o u g h p u t & NO r e d u c t i o n i n D a t a Vo l u m e p o s t
physical optimization
Sample case
090125002
Change in
Electric down tilt
from 2 to 4
I m p r o v e m e n t i n UE p o w e r l i m i t i n g r a t i o p o s t c h a n g e s
Sample case
090125002
C l e a r i m p r o v e m e n t i n LOW RSRQ s a m p l e s p o s t c h a n g e s
(RSRQ c o m p a r i s o n is f r o m PM UE i n i t i a t e d
measurement)
S a m p l e case_150166001
W h e n A l l R e l a t i o n w e r e d e l e t e d ANR c r e a t e d r e l a t i o n w i t h n a t u r a l
n e i g h b o r 150164-3 a n d KPI t u r n e d g o o d
R e l a t i o n 150166001_33420-90427-3 w a s n o t c r e a t e d a g a i n
S a m p l e case_150166001
.Good i m p r o v e m e n t i n a l l m a t r i c e s w e r e o b s e r v e d p o s t r e l a t i o n c r e a t i o n
w i t h immediate n e i g h b o r
S a m p l e case_150166001
ANR w a s n o t a d d i n g a n y n e i g h b o r r e l a t i o n s f o r t h i s i n d o o r c e l l .
Investigation c o n f i r m e d missing “UTRANfreqrelation” & “EUtranFreqRelation”
MO f o r t h i s c e l l
A f t e r t h e c r e a t i o n o f t h e s e MO, KPI i m p r o v e d
Samplecase_094962003
SITE DF5330 is h i g h l y u t i l i z e d a n d t h r o u g h p u t f o r a l l t h r e e c e l l r e d u c e s
w i t h increase in d a t a vol ume
No u s e r l i c e n s e l i m i t a t i o n i n t h e s e c e l l s a s RRC s u c c e s s r a t e is q u i t e g o o d
95330003 D o w n l i n k PRB
utilization and Dl t h r o u g h p u t
In o f f peak h o u r s - t h r o u g h p u t is q u i t e g o o d
In peak h o u r s -High d o w n l i n k PRB u t i l i z a t i o n is l i m i t i n g t h e
downlink throughput.
95330003 D o w n l i n k PRB
utilization and Dl t h r o u g h p u t
H i gh v a l u e o f c o n n e c t e d u s e r, DL PRB a n d s c h e d u l e r u t i l i z a t i o n
Ways t o r e d u c e PRB u t i l i z a t i o n
›
There are very limited means of reducing of PRB
utilization .How ever some of these methods can be tried
on case by case basis
›
Traffic offload to less utilized neighboring cells
›
Reduce control channel resources(Before that
check PDCCH utilization)
› Add Bandwidth (if system is operating < 20Mhz) as
Bandwidth increase would increase number of PRB
›
Reduce inactivity timer (tInactivityTimer) value so that
inactive user can be released early
DF5330-Data Vo l u m e
Qoffsetcelleutran to -2
Qoffsetcelleutran to -6
Qoffsetcelleutran to -4
Physical optimization
an and Tilt changes
D a t a f r o m UL SINR c o u n t e r s c o n f i r m s p o o r SINR c o n d i t i o n a t t h e c e l l
S a m p l e case_93704001
UETR TRACES FOR CALL DROP
CTR a l s o c o n f i r m s u p l i n k i ssue a t t h e c e l l a s t h e r e a r e m a n y c a l l
drop rel at e d t o poor uplink coverage
ISSUE f o r w a r d e d t o o&M t e a m f o r DAS AUDIT a n d CHECK a s F a u l t y DAS
was suspected as p r i m a r y cause o f p o o r p e r f o r m a n c e
S a m p l e case_93704001
DL t h r o u g h p u t is q u i t e g o o d f o r t h e c e l l . DL c o v e r a g e a n d SINR is a l s o
good f o r the cell.
S a m p l e case_155980003
CELL 15598003 h a s v e r y l o w u p l i n k t h r o u g h p u t
S a m p l e case_155980003
RLC r e t r a n s m i s s i o n r a t e a n d p a c k e t l o s s is v e r y h i g h i n u p l i n k f o r t h i s
cell
S a m p l e case_155980003
RSSI is v e r y h i g h a t t h i s c e l l w h i c h is i m p a c t i n g t h r o u g h p u t a n d p a c k e t l o s s i n u p l i n k . A g g r e s s i v e
s e t t i n g o f p Z e r o N o m i n a l P u s c h & p Z e r o N o m i n a l P u c c h u s e d f o r t h i s c e l l b u t KPI d i d n o t i m p r o v e .
C e l l f o r w a r d e d t o o&M t e a m f o r PIM t e s t i n g a n d r u l i n g o u t i n t e r n a l i n t e r f e r e n c e
Essential Features
A l l t h e s e f e a t u r e s s h o u l d be e n a b l e d a t eNodeB f o r Good UL a n d DL
throughput
Essential Parameters
›
Radio Network MO parameters:
– EUtranCellFDD
› dlChannelBandwidth / ulChannelBandwidth=should be equal to license
bandwidth noOfTxAntennas for MIMO= 2
noOfRxAntennas for MIMO= 2
› transmission Mode default is 3, TxDiv and Open Loop Spatial Multiplexing (2x2
MIMO)
› pdcchCfiMode (number of OFDM symbols used for PDCCH, 1->3)
› maximumTransmissionPower = 460 (for 40 watt site)
› partOfSectorPower (for a sector)= 100
› pZeroNominalPucch some UEs need this to be increased or ACK/NACKs are not
received successfully on PUCCH.
› pZeroNominalPusch some UEs need this to be increased from default or lots of
errors seen on PUSCH.
– SectorEquipmentFunction
› confOutputPower = license power(20/40/60 Watt)
counters f o r t h r o u g h p u t analysis
›
UL Interference on PUCCH / PUSCH :
pmRadioRecInterferencePwrPUCCH / pmRadioRecInterferencePwr
›
SINR of PUCCH / PUSCH: pmSinrPucchDistr / pmSinrPuschDistr
› PRB Utilization in DL / UL : pmPrbUtilDl / pmPrbUtilUl
›
RLC ACK/NACK: pmRlcArqUlack|pmRlcArqUlNack
›
Transport block PWR restricted:
pmRadioTbsPwrRestricted / pmRadioTbsPwrUNRestricted
›
Scheduling activity per cell in UL and DL :
pmSchedActivityCellDl
/pmSchedActivityUeDl
›
Rank distribution MIMO/ SIMO : pmRadioTxRankDistr
›
Number of A2 events(UE in poor coverage)
:pmBadCovEvalReport
RSS
I
U L Interference on PUCCH* :
UL interference on PUSCH :
pmRadioRecInterferencePwrPUCCH
pmRadioRecInterferencePwr
The measured Noise and Interference Power on PUCCH
The measured Noise and Interference Power on PUSCH
PDF ranges:
[0]: N+I <= -121 PDF ranges:
[1]: -121 < N+I <= -120 [0]: N+I <= -121
[2]: -120 < N+I <= -119 [1]: -121 < N+I <= -120
[3]: -119 < N+I <= -118 [2]: -120 < N+I <= -119
[4]: -118 < N+I <= -117 [3]: -119 < N+I <= -118
[5]: -117 < N+I <= -116 [4]: -118 < N+I <= -117
[6]: -116 < N+I <= -115 [5]: -117 < N+I <= -116
[7]: -115 < N+I <= -114 [6]: -116 < N+I <= -115
[8]: -114< N+I <= -113 [7]: -115 < N+I <= -114
[9]: -113 < N+I <= -112 [8]: -114< N+I <= -113
[10]: -112 < N+I <= -108 [9]: -113 < N+I <= -112
[11]: -108 < N+I <= -104 [10]: -112 < N+I <= -108
[12]: -104 < N+I <= -100 [11]: -108 < N+I <= -104
[13]: -100 < N+I <= -96 [12]: -104 < N+I <= -100
[14]: -96 < N+I <= -92 [13]: -100 < N+I <= -96
[15]: -92 < N+I [14]: -96 < N+I <= -92
Unit: dBm/PRB [15]: -92 < N+I
Unit: dBm/PRB
Distribution of the SINR values calculated for PUCCH . Distribution of the SINR values calculated for PUSCH .
F o r g o o d t h r o u g h p u t i n UL - FEW S a m p l e s i n p o o r SINR r a n g e s
PRB u t i l i z a t i o n
PRB Utilization in UL:
PRB Utilization in Dl : pmPrbUtilUl
pmPrbUtilDl
A distribution that shows the Physical
A distribution that shows the downlink Physical Resource Blocks (PRB) utilization (total
Resource Blocks (PRB) utilization (total number of used PRB by available
number of used PRB by available PRB) on PRB) on the Physical Uplink Shared
the Physical Downlink Shared Channel Channel (PUSCH).
(PDSCH).
PDF ranges:
PDF ranges: [0]: 0 % <= Utilization < 10 % [1]:
[0]: 0 % <= Utilization < 10 % 10 % <= Utilization < 20 %
[1]: 10 % <= Utilization < 20 % [2]: 20 % <= Utilization < 30 %
[2]: 20 % <= Utilization < 30 [3]: 30 % <= Utilization < 40
% [3]: 30 % <= Utilization < % [4]: 40 % <= Utilization <
50 % [5]: 50 % <= Utilization
40 % [4]: 40 % <= Utilization
< 60 % [6]: 60 % <=
< 50 % [5]: 50 % <= Utilization < 70 % [7]: 70 %
Utilization < 60 % [6]: 60 % <= Utilization < 80 % [8]: 80
<= Utilization < 70 % [7]: 70 % <= Utilization < 90 % [9]:
% <= Utilization < 80 % [8]: 90 % <= Utilization
80 % <= Utilization < 90 % Unit: -
[9]: 90 % <= Utilization Condition: One sample should be the
Unit: - utilization during the sample gathering
Condition: One sample should be the utilization period.
during the sample gathering period.
F o r Good UL a n d DL t h r o u g h p u t - UL a n d DL PRB u t i l i z a t i o n s h o u l d
be l o w r e s p e c t i v e l y ( <80%)
UL RLC NACK
RLC ACK: RLC NACK:
pmRlcArqUlack pmRlcArqUlNack
›
The total number of successful
›
The total number of
RLC PDU transmissions unsuccessful RLC PDU and
(ACKs) in the uplink direction. RLC PDU segment
transmissions (NACKs) in the
›
Unit: -
uplink direction.
›
Condition: Continuous ›
Unit: -
measurement for Radio
Bearers aggregated to cell
›
Condition: Continuous
level.. measurement for Radio
Bearers aggregated to cell
level.
F o r g o o d t h r o u g h p u t i n UL –U L RLC NACK RATIO s h o u l d be l o w
Power re str ic te d
t r a n s p o r t block-UL
Transport block PWR restricted: Transport block PWR restricted:
pmRadioTbsPwrUNRestricted
pmRadioTbsPwrRestricted
R a t i o o f p o w e r l i m i t e d t o n o n p o w e r l i m i t e d b l o c k s s h o u l d be l o w
F o r Good t h r o u g h p u t i n UL- R a t i o s h o u l d be l o w ( < 50%)
CQ
I
CQI Is a feedback mechanism from UE to eNB in downlink
›
QPSK Samples (%) = 100 * (pmMacHarqDlAckQpsk/
(pmMacHarqDlAckQpsk + pmMacHarqDlAck16qam
+ pmMacHarqDlAck64qam))
›
16 QAM Samples (%) = 100 *
(pmMacHarqDlAck16qam / (pmMacHarqDlAckQpsk +
pmMacHarqDlAck16qam + pmMacHarqDlAck64qam))
›
64QAM Samples(%) = 100 *
(pmMacHarqDlAck64qam/ (pmMacHarqDlAckQpsk +
pmMacHarqDlAck16qam + pmMacHarqDlAck64qam))
F o r g o o d DL t h r o u g h p u t - H i gh u s a g e o f 64 QAM a n d 16 QAM s c h e m e i n DL
M o d u l a t i o n scheme usage
UL
F o r g o o d UL t h r o u g h p u t - H i gh u s a g e o f 16 QAM s c h e m e i n UL
KEY
LEARNING
›
Check all important KPI in cases of low throughput as it
make analysis simple and help in finding the root
cause faster.
›
Do basic parameter and feature audit before proceeding
further
›
Check RSSI at the cell and UL power control parameter
setting.
›
Rule out any transmission issue by checking DL latency
and packet loss rate.
›
DL throughput is mostly impacted by poor DL SINR.
Low
Avg CQI/ 64 QAM sample/RI indicated poor DL SINR.
›
UL throughput is mostly impacted by poor UL coverage
check CTR traces & UL SINR counters for this.