Sales Campus 2013 – Malaga HEX-Advanced

March 4-15
Agenda
• Recent & coming NPI

• Expanding your expertise

• Selling against competition

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Rule of engagement

You must take notes

Question to be answered

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
RECENT AND COMING NPI

• 312D2 and 318D2

• 320DL with C6.6 from Xuzhou, China

• Trade dress change

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
2013 coming changes
New Product
Introduction
312D2L / 318D2L

Engine update
320DL

Source change
323DL / 324DL / 336DL

NPI
336D2L / 340D2L

Styling change
320/349

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
312D2 / 318D2 - Engine change

Cat 3054C engine:


– Proven technology
– Low pressure fuel system
– Mechanical engine (with governor)
– Durable and fuel efficient
– Meets EU Stage II regulations

312D2 Net power (ISO9249) – 67 kW


318D2 Net power (ISO9249) – 82 kW

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
312D2 / 318D2 – Styling change
D Series

D2 Series

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
320DL from CXL

• New Cat C6.6 engine from Xuzhou, China


– Similar performance than Cat C6.4
– Similar Fuel consumption than Cat C6.4
– Similar fuel injection system

• Improved filtration system


– Improved reliability

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Improved fuel filtration system
800,000,000 400,000 2,000 1
4μm particles 4μm particles 4μm particles 4μm particles
β ratio = 153 β ratio = 2000 β ratio = 2000 β ratio = 2000

TANK
122,400,000,000 Cat C6.6 (Vista)
4μm particles
Cat C6.4

β ratio = 2 β ratio = 75 β ratio = 75 β ratio = 2000

61,200,000,000 816,000,000 10,880,000


4μm particles 4μm particles 4μm particles

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Trade dress change (312 - 349)

Current 320D Styling New 320D Styling

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
EXPANDING YOUR EXPERTISE

• Select the right model

• Configure to win

• Identify best practices for key applications

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
How to select the right model/configuration?

Understand the application

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
WW HEX Application Profile
Truck Loading Digging/Trenching Travelling Leveling Lifting Idling

SMALL 29% 11% 13% 19% 9% 20%

MEDIUM 41% 26% 8% 4% 6% 16%

LARGE 53% 23% 7% 1% 5% 11%

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Other applications
Rip & Load Block handling Demolition

Machine: Caterpillar 340DL Machine: Caterpillar 385BL


Location: South Africa Location: UAE

Hammering

Ditch cleaning
Machine: Caterpillar 325DL Machine: Modified Cat 320DL Machine: Caterpillar 330C UHD
Location: Saudi Location: Western Africa Location: Belgium

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Model selection process

Application Work tool Minimum machine


requirements

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Model selection process

• Owning and Operating cost


• Physical machine size – Legal requirements
• Features
• Truck pass match
• Competitive environment
• Availability - Resale value
• …

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
From application to work tool

Step#1
Estimate cycle time

Step#2
Calculate effective cycles per hour

Step#3
Calculate bucket size

Step#4
Select the model

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Cycle time estimating chart

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Bucket payload from PHB

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
349DL Bucket Matching Guide from Specalog

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Model selection – Rule of thumb

Production required Estimated HEX weight



350 t/hr ????

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Model selection – Rule of thumb

Production required Estimated HEX weight


 x0.1 
350 t/hr 35 t

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Case study

From: mb@contractors.com
To: salemore@dealer.cat.com
Cc:
Date: 01/01/2013 12:50 PM
Subject: Re: Transport equipment

Dear Salemore,

We finally win the bid. The new D10 is already on site preparing the area.
We need one more HEX to reach the required project deadline.
Would appreciate to receive your proposal at the latest today.

Regards
Mark Bridgestone

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Case study - Task
• Work in your team.
• Each team to ask questions to customer during 10 min
• Answer will be written by each team on flip chart.

• Which excavator should we propose?


• What would be a good alternate choice knowing that we compete
against a Komatsu PC400?

• The spokesman of each team then describes the solution in front of


the team.

10min Q&A / 10 min preparation / 10 min presentation per team.

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Case study - Answer
INFO TO ASK TO THE CUSTOMER

INFO TO FIND IN PHB OR SPECALOG

CALCULATIONS

STEP 1 - Estimate the cycle time


Loading technique=Bench loading 90 Bench loading 90
Estimated cycle time [PHB/Excavators/Cycle time estimating charts] 20 sec

Theoritical Number of cycle per hour=3600/20 180 cycles/hrs

STEP 2 - Calculate effective cycle time per hour


Operator skill/Efficiency 90%
Machine availability 95%
General Operational efficiency 83%

Actual Number of cycle per hour=180 x 0.9 x 0.95 x 0.83 127 cycles/hrs

STEP 3 - Calculate required bucket capacity


Hourly production required 280 lcm/hr
Material type Sandy Clay
Bucket fill factor [PHB/Excavator/Working weights (bucket & payload)] 100%

Volume to be move per cycle=(Required production lcm/nb of cycle) 2.20 m3


Bucket size=Volume to be move/fill factor 2.20 m3

STEP 4 - Select the model


Material density 1600 kg/m3
Right model 336

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Configure to Win

Matching Boom, Stick, Bucket & Attachments to Specific Job


Requirements Maximizes Productivity

STICK BOOM

BUCKET

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Boom and stick selection
TYPE AVANTAGES USAGE
More Durable
Thicker plate Severe applications
Less sensitive to misapplication
“MASS”
More Production Optimize productivity
Higher digging force
Higher payload

More versatile When a given reach digging


“REACH” Longer reach/digging depth depth is required

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Mass versus Reach (Lane 1) – Digging force
STICK force* REACH MASS MASS vs. REACH
329DL 155 kN 167 kN +8%
336DL 158 kN 180 kN +14%
349DL 201 kN 240 kN +19%
BUCKET
FORCE
BUCKET force* REACH MASS MASS vs. REACH
329DL 168 kN 185 kN +10%
STICK
FORCE 336DL 176 kN 218 kN +24%
349DL 263 kN 297 kN +13%
(*) bucket tip radius varies depending of the configuration

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Mass versus Reach (Lane 1) – Payload

Max payload REACH MASS MASS vs. REACH


329DL 4539 kg 5288 kg +17%
336DL 4723 kg 5511 kg +17%
349DL 6520 kg 7480 kg +15%

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Lane 1 configurations
STICK force* REACH MASS
DCA1
320DL Akashi N/A
5.7m boom / 2.9m stick

DCA1 DCA2
329DL Akashi
6.15m boom / 2.65m stick 5.55m boom/2.5m stick

DCA6 DCA8
336DL Aurora
6.5m boom / 3.2m stick 6.18m boom/2.55m stick

DCA1 DCA2
340DL CXL
6.5m boom / 3.2m stick 6.18m boom/2.55m stick

DCA2 DCA1
349DL Aurora
6.9 m boom/3.4m stick 6.55m boom/2.5m stick

DCA1
374DL Gosselies Lane 2
7.0 m boom/2.6m stick

DCA1
390DL Gosselies Lane 2
7.25 m boom/2.9m stick

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
FOPS cab
Falling Object Protective Structure
ISO10262

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
ROPS cab not offered in AME
Roll Over Protective Structure
ISO12117

Non-ROPS – LRC ROPS – Australia, Turkey

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Impact of bucket GET on performance

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Bucket size is critical

• Longer cycle time, lower productivity


• Excessive fuel consumption
• Lower boom & stick life
• Stability issue

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Bucket quiz
5110B BUCKET A BUCKET B

+ OR
7.6 m3 9.7 m3

From performance report TEXR0372

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Criteria to be used for bucket selection
• Stability
• Impact on structure life

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Bucket selection - Case study
• A customer is owning a 336DL equipped with the ME boom and 2.5m stick. He is
usually working in a wide range of application loading material with a density going
from 1.5 to 1.8t/m3. He would like to know if he could work with a quick coupler
(weight=800 kg) and a 2.2m3 (weight=2200 kg). What would be your
recommendations?

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Case study - Answer

• Max payload including bucket= 5511 kg


• Total weight of bucket and QC = 2200 + 800 = 3000 kg
• Max payload excluding bucket= 5511 – 3000 = 2511 kg

• Max material density (assuming fill factor 100%)


= 2511/2.2 = 1141 kg/m3

Bucket is too large

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Bushing

Tracks selection Link

Pin

Whenever possible, use the narrowest shoes available

U/C System Wear & Structural Life Factors


Machine productivity factors

Shoe Shoe Pin & Bushing Link & Rollers


Flotation Traction Maneuverability
W.L S.L. W.L & S.L. W.L. & S.L.
Wider Shoe ++ same -- same -- -- -

Less Grousers same + - N/A -- - same

W.L. = Wear Life, S.L. = Structural Life

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Selection of Auxiliary circuit

• • Quick coupler circuit


Shears

• • Combined circuit (2 ways)


Hammer

• • Hammer circuit (1 way)


Grapple

• • Combined & MP circuit


Coupler

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
WW HEX Application Profile
Truck Loading Digging/Trenching Travelling Leveling Lifting Idling

SMALL 29% 11% 13% 19% 9% 20%

MEDIUM 41% 26% 8% 4% 6% 16%

LARGE 53% 23% 7% 1% 5% 11%

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Digging position
Most stable

Dig
• Dig over the front
• Dump over the side
Dump Dump

• For ditch cleaning configuration ?


Most stable

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Proper Digging Range
• 35º-45º out from vertical to the vertical position
• Bucket should be loaded by vertical position

45º

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Digging Techniques

• Dig from top down


• Remove material in layers

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Digging techniques

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Digging techniques

3 2 1

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Truck loading tips

• Bench height shouldn’t exceed stick length


• Side rail body truck below boom/stick hinge pin
Stick Length

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Sales Campus 2013 – Malaga HEX - Advanced
March 4-15
Sales Campus 2013 – Malaga HEX - Advanced
March 4-15
Truck loading tips

• Operator efficiency reduced


• HEX must move

3 4 5 6 7 8

Number
of passes

• Require too many trucks


• Truck exchange time negatively impact production

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Sales Campus 2013 – Malaga HEX - Advanced
March 4-15
Truck pass match – Case study
• 336DL equipped with a 2,2 m3 bucket

• Calculate the number of passes to load the 725 with a material


density of 1.2 t/m3. Is it a good pass match?

• Calculate the number of passes to load the 725 with a material


density of 1.8 t/m3. Is it a good pass match?

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Truck pass match – Case study results
• CSG: 725 payload=23.6t, capacity=14.3m3
• d < (23.6/14.3)=1.65 -> limited by capacity
• d > (23.6/14.3)=1.65 -> limited by payload

• d = 1.2t/m3 -> limited by capacity


• Number of passes=14.3/2.2=7 passes

• d = 1.8t/m3 -> limited by payload


• Number of passes=23.6/(2.2*1.8)=6 passes

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Hammer Tips

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Hammer tips

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Hammer Tips

Do not strike more than


XX
15 seconds in one spot

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Hammer Tips

Keep the hammer at 90º


angle to the material

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Hammer Tips

Stop hammer before


the material collapses

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Hammer Tips

Do not bend the tool


while striking

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
SELLING AGAINST COMPETITION

• Know Cat features and benefits

• 318D2 an alternative to compete in 20t size class

• Walk around activity

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
What does customer value?
Is different by customer and what they do…

Productivity? Dealer relationship?


Service Resp. Time?
Resale value?
Initial price?
Parts availability?
Proximity of dealer?
Rental Availability?
Trust?
Uptime?
Superior Fuel Economy? Financial Options?
Comfort? Easy to service?

Salesperson Knowledge? Used Equipment?

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Cat excavators strengths

• Performance
• Durability / Resale value
• Safety
• Operating costs

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Hydraulic return filter cartridge – from 320

UNIQUE!

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Pressure and S.O.S taps – All models

UNIQUE!

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Electric wiring – All models

UNIQUE!

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Stress relieving process – from 324

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Electric Regeneration valve principle – 349, 374, 390

Flow Less Energy Less Fuel


- +

Reduce pump Reduce


displacement engine speed

Energy wasted

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Positive track Pin Retention (PPR2) – 349, 374, 390

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Gain and response map – 374, 390

GAIN RESPONSE

Cylinder Speed
Cylinder Speed

Quick
Speedy Normal
Soft
Smooth

Time after operation


Lever stroke

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Some results available
Machine Against HITACHI Against KOMATSU Against VOLVO OTHER
DOOSAN DH225-7
ZX210LC-3 PC210LC-8 (HEJH3824)
320DL No Results available
(HEJH3799) (HEJH3800) HYUNDAI R210
No media published
MEDIUM SIZE
TRACK PC220LC-8 EC290BLC DOOSAN DX300LC
324DL No Results available
EXCAVATORS (TEJB9320) No media published No media published
PC300LC-7
329DL No Results available No Results available
HEJH3966

ZX350LC-3 PC300LC-7 EO EC360BLC SANY SY365-8


336DL
(TEJB9304) (TEJB9270) (TEXR0560) (TEXR0560)
PC400LC-8 EC460BLC
340DL No Results available
(TEXR0563) (TEJB9690)

JD450DLC PC400LC-7 EC460BLC


345DL
(TEJB9451) (TEJB9448) (TEJB9450)
LARGE SIZE
TRACK JD650LC PC600LC-8
No Results available
EXCAVATORS (TEJB9545) (TEJB9545)
374DL
ZX870LCH-3 PC800SE-7
No Results available
(TEXR0536) (TEJB9546)
390DL No Results available No Results available -

https://cmic.cat.com/

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
318D2 alternative

Hyundai R220LC-9 Cat 320DL Cat 318D2L

Operating weight (t) 21.9 21.5 17.6


Specifications
Net Engine power (ISO9249) 107 103 82

Boom (m) 5.7 5.7 5.1


Configuration Stick (m) 2.9 2.9 2.6

Bucket size (m3) 0.92-1.3 1.19 0.91


Max. reach (m) 9.98 10.02 8.78
Payload (kg) N/A 2970 2280
Lifting front @ (6m, 0) w/o bucket 7260 6950 4800
Performance
Lifting side @ (4.5m, 0) w/o bucket 6860 6300 4350
Productivity index 96 100 80
Fuel consumption index 107 100 92

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Hammer matching guide

H115Es H120Es H130Es


(1140 kg) (1680 kg) (1900 kg)

320DL 5.7m HD boom 2.9m HD boom 360° 360° 360°

318D2 L 5.1m boom 2.6m boom 360° 360°

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Walkaround Exercise

• Split in 4 teams
– Team 1: Hydraulic
– Team 2: Structure & Undercarriage
– Team 3: Engine & Cooling
– Team 4: Operator station and Electrical
• Use the competitive guide and what you have learnt
• 10 minutes to prepare
• 5 minutes to do a walkaround on your topic

Sales Campus 2013 – Malaga HEX - Advanced


March 4-15
Thank you!

Sales Campus 2013 – Malaga HEX-Advanced


March 4-15