SUBJECT: SOFTWARE ENGINEERING (16CIU18)
Online Class (Google Meet): Prepared by R.Saravanakumar
Class: III B.Com IT A

3) WORK DOWN BREAK STRUCTURE


2

 A bottom-up estimation tool


 WBS is a hierarchical chart that accounts for the
indiviual parts of the system
 WBS chart can indicate either product hierarchy
or process hierarchy
 It identifies the product components and indicates
the manner in which the components are
interconnected
Online Class (Google Meet): Prepared by R.Saravanakumar
Class: III B.Com IT A

PROCESS HIERARCHY:
3

 It identifies the work activity and relationship


among those activities
  Using WBS cost are estimated by assigning cost
to each individual component in the chart and
summing the cost
 WBS are the most widely used cost estimation
techniques
Online Class (Google Meet): Prepared by R.Saravanakumar
Class: III B.Com IT A

4) ALGORITHMIC COST MODEL


4

 Constructive cost model(COCOMO)


 Algorithmic cost estimators compute the estimated cost of software system as
the some of the cos of the module this model is bottom up estimates
 The constructive cost model (COCOMO)is an algorithmic cost model
described by boehm
 In COCOMO model the equation calculates the programmmar month and
deelopment schedule are used for the program unit based on the number of
deliver source instruction(DSI)
 Effort multipliers are used to adjacent the estimate for product
attribute,computer,customer,and project attribute
 The effort multipliers examines the daa from 63 project and by using delphi
technic
Online Class (Google Meet): Prepared by R.Saravanakumar
Class: III B.Com IT A
4) ALGORITHMIC COST MODEL
5
(Contd…)
The COCOMO equation incorporates a number
assumption .for eg. The organic mode application
program equation applied in the following type of
situation
i. small to medium size project
ii. familiar application area

iii. stable

iv. in house development effort


Online Class (Google Meet): Prepared by R.Saravanakumar Class: III B.Com IT A

A SIMPLE AV ABOUT IN PLANNING ORGANIZATION STRUCTURE:


6

➢ VIDEO LINK:

https://www.youtube.com/watch?v=r2qkxbCSsvE
Online Class (Google Meet): Prepared by R.Saravanakumar Class: III B.Com IT A

LETS TEST WHAT YOU LEARN! (MCQ)


7

➢ Kindly type the link to attend the Questionaries (MCQ).

https://forms.gle/BRsLvqL9gfBU4Cjd9

You might also like