HP-IP TURBINE
CASINGS MILD SOFT RUST Removed by
BDA COLOR Mechanical
HP INNER DEPOSITS. cleaning
CASING
OBSERVATIONS, FINDINGS AND
REMEDIAL MEASURES
ACTION
COMPONENTS TEST FINDINGS TAKEN
HP BLADE RING
In the 13th stage, black
Deposit
color deposits were samples sent
observed on the fixed for analysis.
HP-IP TURBINE: blades. Deposits
DIAPHRAGMS
BDA removed by
IP BLADE RING – 1
Minor brown color
steam
washing and
deposits were observed
sand blasting.
at the back of the 6
th
stage blades.
OBSERVATIONS, FINDINGS AND
REMEDIAL MEASURES
ACTION
COMPONENTS TEST FINDINGS TAKEN
IP BLADE RING – 2
• Oil like brown color
sticky deposits were
observed in the 7th &
Deposit
8th stage blades. samples sent
• Adherent brown color
for analysis.
HP-IP TURBINE: Deposits
DIAPHRAGMS BDA hard deposits were
removed by
observed in the 9th –
11th stage blades. steam
• In the 12th stage washing and
blade, huge amount of sand blasting.
soft deposits were
observed.
OBSERVATIONS, FINDINGS AND
REMEDIAL MEASURES
COMPONE TEST FINDINGS ACTION TAKEN
NTS
LPT inner casing:
• In bottom half, 2 to 3
cracks of 10 to 15 mm • The crack edges
length were observed
near 6th extraction were punched.
tapping (RHS) on the • Deposit samples
parting plane. collected and sent
LP BDA, • In the 3rd and 4th stage
TURBINE: for analysis.
blades Grey color soft
CASINGS FMI deposits were • Deposits were
observed. removed by
• More corrosion was mechanical
observed in the inner cleaning / sand
rim surface between 5 th
blasting.
& 6 stages and 5
th th
stage blades.
OBSERVATIONS, FINDINGS AND
REMEDIAL MEASURES
COMPONE
TEST FINDINGS ACTION TAKEN
NTS
LP rotor 6th stage:
Linear indications
(cracks) were observed
in the lacing wire as
follows: .
• IP side – 24 in the • Cracks were
LP ROTOR LPI inner lacing wire & 29 repaired.
in the outer wire.
Generator side – 7 in
the inner lacing wire
and 13 in the outer
wire.
OBSERVATIONS, FINDINGS AND
REMEDIAL MEASURES
COMPONE
TEST FINDINGS ACTION TAKEN
NTS
•In the 3rd and 4th stage
blades, Grey color soft
deposits were • Deposits samples
observed. sent for analysis.
•In the LPT rotor 5th Deposits
LP ROTOR BDA stage (IPT end & Gen removed by sand
end) heavy erosion – blasting.
corrosion has been
• Shall be attended
observed in all the
blades of the respective
during LEP
stage.
OBSERVATIONS, FINDINGS AND
REMEDIAL MEASURES
COMPONE
TEST FINDINGS ACTION TAKEN
NTS
•In NFT, last stage
blades (generator side),
7 packets (1 packet = 4
blades) showed
deviation. After repair
• Shall be attended
LP ROTOR NFT works in the welding
during LEP
region of the inner &
outer lacing wires, 2
packets alone showed
deviation.
OBSERVATIONS, FINDINGS AND
REMEDIAL MEASURES
COMPONE
TEST FINDINGS ACTION TAKEN
NTS
•In the impulse wheel,
erosion was observed
in the tenon region (in
one quarter area, in the
direction of rotation) • Deposits samples
BDA, •In the HP reaction sent for analysis.
stages, 2-3 mm linear
HP ROTOR FMI, indications were
Deposits removed
LPI observed in the blade by steam washing
rivet region, in some of and sand blasting.
the stages, indicating
slight relaxation of the
rivet flaring.
OBSERVATIONS, FINDINGS AND
REMEDIAL MEASURES
COMPONE ACTION
TEST FINDINGS
NTS TAKEN
•In HP 13th stage, Black color
blade deposits were
observed.
• Deposits
•In the IPT rotor: 6th stage
minor Brown color deposits samples sent
were observed on the for analysis.
blades. In the 7th and 8th Deposits
HP ROTOR BDA stage blades, sticky Brown removed by
color deposits like an oil steam
coating was observed. In the
stages 9–11th Brown color washing and
hard deposits were sand
observed. In the 12th stage blasting.
brown color soft deposits
were observed.
OBSERVATIONS, FINDINGS AND
REMEDIAL MEASURES
COMPONE ACTION
TEST FINDINGS
NTS TAKEN
•In the Dye Penetrant Test
(LPI), star shaped crack was
observed at the front top
end (LHS); another crack
observed at the rear end
BEARINGS (LHS) and the rear side • New bearing
NO – 3 LPI, edges showed disbond has been
symptoms provided for
BOTTOM UT
•In the Ultrasonic testing bearing No.3.
HALF.
(UT), a disbond area of
24.5% of total bearing area
was observed. M/s Alstom
has recommended for
replacement of the bearing.
OBSERVATIONS, FINDINGS AND
REMEDIAL MEASURES
COMPONE ACTION
TEST FINDINGS
NTS TAKEN
NO – 2 crack at 2 locations
• 2 thrust pads
BOTTOM LPI, was observed.
were
HALF. & UT • Thrust collar: In two
replaced.
THRUST thrust pads, babbit
COLLAR metal plug indications
were observed.
OBSERVATIONS, FINDINGS AND
REMEDIAL MEASURES
COMPONE ACTION
TEST FINDINGS
NTS TAKEN
GOVERNING VALVES( 6
NOS
• In the Dye penetration
test, linear indications
(cracks) of length 100 • Shall be
TURBINE LPI,
to 150 mm were considered
VALVES FMI observed at the during LEP
circumferential weld
joints of valve seats to
the valve body.
observed.
OBSERVATIONS, FINDINGS AND
REMEDIAL MEASURES
COMPONE ACTION
TEST FINDINGS
NTS TAKEN
RHSV (left):
• At the flap seat region a
blowhole of 4 mm length