Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 61

NATIONAL HIGHWAYS

CHENNAI CIRCLE

BLACK SPOT DETAILS


BLACK SPOT- ABSTRACT
CAUSES FOR ROAD ACCIDENTS

 Two lane road with narrow bridge


Insufficient warning signs
Lack of pedestrian crossing
facilities
WORK COMPLETED

Black Spot work completed during Annual


Plan 2017-18
 Widening from 2 lane to 4 lane
 Widening the narrow culverts

 Provision of Cautionary ,Informatory and Mandatory Boards


and other Road Markings as per standards
PHOTOS – BEFORE EXECUTION
PHOTOS – BEFORE EXECUTION
PHOTOS –AFTER EXECUTION
PHOTOS –AFTER EXECUTION
CAUSES FOR ROAD ACCIDENTS

 Staggered Junction Village Road merges with


NH
Lack of Set Back Distance, Sight Distance
Less turning radius
Improper banking of curves
Insufficient warning signs
Inadequate lighting
Lack of pedestrian crossing facilities
SHORT TERM
PHOTOS
PHOTOS
PHOTOS
LOCATION MAP -
SUBRAMANIYAPURAM
CAUSES FOR ROAD ACCIDENTS

 Two lane road


Lack of Bus bay and bus stop facilities
Insufficient warning signs
Lack of pedestrian crossing facilities
Pedestrian crossing at unauthorized
locations
WORK COMPLETED

 Black Spot work completed during Annual Plan under Road Safety
2016-17

 Widening of the existing road to 4 lane


 Provision of centre medians to avoid pedestrian crossing at unauthorized
locations
 Bus Lay Bye provided
 Provision of Cautionary ,Informatory and Mandatory Boards and other
Road Markings as per standards
PHOTOS
PHOTOS
CAUSES FOR ROAD ACCIDENTS
4 legged junction. SH-127 intersects with NH234 at Km 26/8.
Fully Built up area
Lack of Set Back Distance, Sight Distance
Less turning radius
Improper banking of curves
Insufficient warning signs
Inadequate lighting
Poor drainage
Narrow shoulders
Lack of pedestrian crossing facilities
Pedestrian Crossing at unauthorized locations
PHOTOS
PHOTOS
LOCATION MAP
IMPROVEMENTS
CAUSES FOR ROAD ACCIDENTS
 School located at this stretch .
 Local road branches from NH.
6 lane to two lane with paved shoulder merging location.
Lack of Set Back Distance, Sight Distance
Less turning radius
Insufficient warning signs
Poor drainage
Lack of pedestrian crossing facilities
Pedestrian Crossing at unauthorized locations
PHOTOS
PHOTOS
LOCATION MAP – NEYVELI ROAD
MOSQUE TO GURUGULAM ROAD
SHORT TERM
SHORT TERM
SHORT TERM
SHORT TERM
BLACK SPOT - SHORT TERM MEASURES
Circle: Chennai Division: Villupuram
NH No.532 Black Spot Id.:177
Black Spot : Neyveli Road Mosque to Gurugulam school
Rate
Amount
Sl.No. Description Quantity Unit /Unit
in Rs.
in Rs.

Hot Mixed Thermo Plastic Compound -


1 415.40 sq.m. 841.00 349351
Road Marking

2 Road Studs Poly Corbonate/ABS moulded 468.00 Nos. 414.00 193752

Retro Reflective Cautionary,Mandatory


3 and Informatory sign boards (90cm 14.00 Nos. 4048.00 56672
equilateral triangle board)

Retro Reflective Cautionary,Mandatory


4 and Informatory sign boards (60cm circular 12.00 Nos. 3596.00 43152
board)

Retro Reflective Cautionary,Mandatory


5 and Informatory sign boards (area upto 6.30 sq.m. 10766.00 67826
0.90sqm)
Rate
Amount
Sl.No. Description Quantity Unit /Unit
in Rs.
in Rs.

6 Solar Power Blinker 6.00 Nos. 25000.00 150000


7 Speed Breaker 20000
Sub-Total 880753
Add GST 12% 105690
Contigencies 2.8% 24661
Agency Charges 9% 79268
Supervision Charges 1.5% 13211
Quality Control Charges 1% 8808
Grand Total 1112391
LONG TERM MEASURE

 One Foot Over Bridge near Vallalar School


may be proposed
 Median to be provided to avoid pedestrian
crossing
 Approx. Cost .1.00cr.
PHOTOS
PHOTOS
PHOTOS
LOCATION MAP – VIZHAPALLAM TO
ANNA NAGAR KAZUTHAI BRIDGE
SHORT TERM
CAUSES FOR ROAD ACCIDENTS

 Four legged intersection . Two MDRs to Palur


and Kurinchipadi merges with NH.
Lack of Set Back Distance, Sight Distance
Less turning radius
Improper banking of curves
Insufficient warning signs
Inadequate lighting
Lack of pedestrian crossing facilities
BLACK SPOT - SHORT TERM MEASURES
Circle: Chennai Division: Villupuram
NH No.532 Black Spot Id.:189
Black Spot : Vizhapallam to Anna Nagar Kazuthai Bridge
Rate
Amount
Sl.No. Description Quantity Unit /Unit
in Rs.
in Rs.

Hot Mixed Thermo Plastic Compound -


1 274.78 sq.m. 841.00 231090
Road Marking

2 Road Studs Poly Corbonate/ABS moulded 305.00 Nos. 414.00 126270

Retro Reflective Cautionary,Mandatory


3 and Informatory sign boards (90cm 8.00 Nos. 4048.00 32384
equilateral triangle board)

Retro Reflective Cautionary,Mandatory


4 and Informatory sign boards (60cm circular 8.00 Nos. 3596.00 28768
board)

Retro Reflective Cautionary,Mandatory


5 and Informatory sign boards (area upto 7.20 sq.m. 10766.00 77515
0.90sqm)
Rate
Amount
Sl.No. Description Quantity Unit /Unit
in Rs.
in Rs.

6 Solar Power Blinker 4.00 Nos. 25000.00 100000


7 Speed Breaker 40000
Sub-Total 636027
Add GST 12% 76323
Contigencies 2.8% 17809
Agency Charges 9% 57242
Supervision Charges 1.5% 9540
Quality Control Charges 1% 6360
Grand Total 803301
LONG TERM MEASURE

 Fly over may be proposed at this location .


 Approx. Cost Rs.20 Cr.
PHOTOS
LOCATION MAP – VIRUTHAMBIGAI
ITI
CAUSES FOR ROAD ACCIDENTS

 Virudhachalam Byepass (under TNRSP


maintenance) branches at this point
1 ODR and 2 village roads joins with
NH road
Lack of Set Back Distance, Sight
Distance
Insufficient warning signs
SHORT TERM
SHORT TERM
SHORT TERM
BLACK SPOT - SHORT TERM MEASURES
Circle: Chennai Division: Villupuram
NH No.532 Black Spot Id: 202
Black Spot : Viruthambigai ITI
Rate
Amount
Sl.No. Description Quantity Unit /Unit
in Rs.
in Rs.

Hot Mixed Thermo Plastic Compound -


1 419.00 sq.m. 841.00 352379
Road Marking

2 Road Studs Poly Corbonate/ABS moulded 504.00 Nos. 414.00 208656

Retro Reflective Cautionary,Mandatory


3 and Informatory sign boards (90cm 14.00 Nos. 4048.00 56672
equilateral triangle board)

Retro Reflective Cautionary,Mandatory


4 and Informatory sign boards (60cm circular 12.00 Nos. 3596.00 43152
board)

Retro Reflective Cautionary,Mandatory


5 and Informatory sign boards (area upto 10.80 sq.m. 10766.00 116273
0.90sqm)
Rate
Amount
Sl.No. Description Quantity Unit /Unit
in Rs.
in Rs.

6 Solar Power Blinker 6.00 Nos. 25000.00 150000


7 Speed Breaker 60000
Sub-Total 987132
Add GST 12% 118456
Contigencies 2.8% 27640
Agency Charges 9% 88842
Supervision Charges 1.5% 14807
Quality Control Charges 1% 9871
Grand Total 1246748
LONG TERM MEASURE

 Fly over may be proposed at this location .


 Approx. Cost Rs.20 Cr.

You might also like