This document discusses several black spots along national highways in the Chennai circle that have been identified as locations with high rates of road accidents. It provides details of 3 black spots where improvement work was completed in 2017-18, including widening roads, improving signage and markings, and adding pedestrian facilities. It also describes the causes of accidents at 4 additional black spots and proposes short-term measures like road markings, signs, and lights to improve safety at those locations. Long-term solutions like flyovers or overpasses are suggested at 2 spots. Photos document conditions before and after the safety improvements.
in Rs.
in Rs.
6 Solar Power Blinker 8.00 Nos. 25
This document discusses several black spots along national highways in the Chennai circle that have been identified as locations with high rates of road accidents. It provides details of 3 black spots where improvement work was completed in 2017-18, including widening roads, improving signage and markings, and adding pedestrian facilities. It also describes the causes of accidents at 4 additional black spots and proposes short-term measures like road markings, signs, and lights to improve safety at those locations. Long-term solutions like flyovers or overpasses are suggested at 2 spots. Photos document conditions before and after the safety improvements.
in Rs.
in Rs.
6 Solar Power Blinker 8.00 Nos. 25
This document discusses several black spots along national highways in the Chennai circle that have been identified as locations with high rates of road accidents. It provides details of 3 black spots where improvement work was completed in 2017-18, including widening roads, improving signage and markings, and adding pedestrian facilities. It also describes the causes of accidents at 4 additional black spots and proposes short-term measures like road markings, signs, and lights to improve safety at those locations. Long-term solutions like flyovers or overpasses are suggested at 2 spots. Photos document conditions before and after the safety improvements.
in Rs.
in Rs.
6 Solar Power Blinker 8.00 Nos. 25
Insufficient warning signs Lack of pedestrian crossing facilities WORK COMPLETED
Black Spot work completed during Annual
Plan 2017-18 Widening from 2 lane to 4 lane Widening the narrow culverts
Provision of Cautionary ,Informatory and Mandatory Boards
and other Road Markings as per standards PHOTOS – BEFORE EXECUTION PHOTOS – BEFORE EXECUTION PHOTOS –AFTER EXECUTION PHOTOS –AFTER EXECUTION CAUSES FOR ROAD ACCIDENTS
Staggered Junction Village Road merges with
NH Lack of Set Back Distance, Sight Distance Less turning radius Improper banking of curves Insufficient warning signs Inadequate lighting Lack of pedestrian crossing facilities SHORT TERM PHOTOS PHOTOS PHOTOS LOCATION MAP - SUBRAMANIYAPURAM CAUSES FOR ROAD ACCIDENTS
Two lane road
Lack of Bus bay and bus stop facilities Insufficient warning signs Lack of pedestrian crossing facilities Pedestrian crossing at unauthorized locations WORK COMPLETED
Black Spot work completed during Annual Plan under Road Safety 2016-17
Widening of the existing road to 4 lane
Provision of centre medians to avoid pedestrian crossing at unauthorized locations Bus Lay Bye provided Provision of Cautionary ,Informatory and Mandatory Boards and other Road Markings as per standards PHOTOS PHOTOS CAUSES FOR ROAD ACCIDENTS 4 legged junction. SH-127 intersects with NH234 at Km 26/8. Fully Built up area Lack of Set Back Distance, Sight Distance Less turning radius Improper banking of curves Insufficient warning signs Inadequate lighting Poor drainage Narrow shoulders Lack of pedestrian crossing facilities Pedestrian Crossing at unauthorized locations PHOTOS PHOTOS LOCATION MAP IMPROVEMENTS CAUSES FOR ROAD ACCIDENTS School located at this stretch . Local road branches from NH. 6 lane to two lane with paved shoulder merging location. Lack of Set Back Distance, Sight Distance Less turning radius Insufficient warning signs Poor drainage Lack of pedestrian crossing facilities Pedestrian Crossing at unauthorized locations PHOTOS PHOTOS LOCATION MAP – NEYVELI ROAD MOSQUE TO GURUGULAM ROAD SHORT TERM SHORT TERM SHORT TERM SHORT TERM BLACK SPOT - SHORT TERM MEASURES Circle: Chennai Division: Villupuram NH No.532 Black Spot Id.:177 Black Spot : Neyveli Road Mosque to Gurugulam school Rate Amount Sl.No. Description Quantity Unit /Unit in Rs. in Rs.
5 and Informatory sign boards (area upto 6.30 sq.m. 10766.00 67826 0.90sqm) Rate Amount Sl.No. Description Quantity Unit /Unit in Rs. in Rs.
6 Solar Power Blinker 6.00 Nos. 25000.00 150000
7 Speed Breaker 20000 Sub-Total 880753 Add GST 12% 105690 Contigencies 2.8% 24661 Agency Charges 9% 79268 Supervision Charges 1.5% 13211 Quality Control Charges 1% 8808 Grand Total 1112391 LONG TERM MEASURE
One Foot Over Bridge near Vallalar School
may be proposed Median to be provided to avoid pedestrian crossing Approx. Cost .1.00cr. PHOTOS PHOTOS PHOTOS LOCATION MAP – VIZHAPALLAM TO ANNA NAGAR KAZUTHAI BRIDGE SHORT TERM CAUSES FOR ROAD ACCIDENTS
Four legged intersection . Two MDRs to Palur
and Kurinchipadi merges with NH. Lack of Set Back Distance, Sight Distance Less turning radius Improper banking of curves Insufficient warning signs Inadequate lighting Lack of pedestrian crossing facilities BLACK SPOT - SHORT TERM MEASURES Circle: Chennai Division: Villupuram NH No.532 Black Spot Id.:189 Black Spot : Vizhapallam to Anna Nagar Kazuthai Bridge Rate Amount Sl.No. Description Quantity Unit /Unit in Rs. in Rs.
maintenance) branches at this point 1 ODR and 2 village roads joins with NH road Lack of Set Back Distance, Sight Distance Insufficient warning signs SHORT TERM SHORT TERM SHORT TERM BLACK SPOT - SHORT TERM MEASURES Circle: Chennai Division: Villupuram NH No.532 Black Spot Id: 202 Black Spot : Viruthambigai ITI Rate Amount Sl.No. Description Quantity Unit /Unit in Rs. in Rs.