4
Reserve Capacity
Reserve capacity = Plant capacity − Max. demand
If the maximum demand on the plant is equal to the plant
capacity, then load factor and plant capacity factor will have
the same value
In such a case, the plant will have no reserve capacity
Plant Use Factor =
(Station output in KWh)/(Plant Capacity x Hours of use)
5
Utilization Factor
Summary of Definitions
Reasons for Electrical Load Growth
• New customer additions
− Load will increase if more customers are buying the utility's
product.
− New construction and a net population in-migration to the area will
add new customers and increase peak load.
• New uses of electricity
− Addition or replacing of device by existed customers.
− With every customer buying more electricity, the peak load and
annual energy sales will most likely increase.
Load Forecasting
• A technique used by power or energy-providing companies to predict the
power/energy needed to meet the demand and supply equilibrium.
• Systematic procedure for quantitatively defining future loads.
Classification depending on the time period:
• Short term
– 1-2 years for deciding operating procedures & preparing budget
estimates
• Medium-term
– 5-6 years for planning the size of stations.
• Long term
– 20-year period for bigger picture of energy supply problems
Factors Affecting Load Forecasting