INDUSTRIAL PROCESSES

Mark Angelo A. Uy
BSME-5B
OJT EXPERIENCE
• Preparing the safety work permit
• Materials preparation needed in the operation
• Assistant of the supervisors and the mechanics
• People handling
• Plotting and Designing in AutoCAD
SAFETY AND HEALTH PRACTICES
1. Personal Protective Equipment (PPE)
a. Hard hat
b. Safety shoes
c. Protective glass
d. Safety vest
e. Dust mask
f. Hand gloves
g. Ear plugs
h. Harness
i. LOTOTO padlock
SAFETY AND HEALTH PRACTICES
2. Safety Work Permit
a. General work permit
b. Hot work permit
c. Work at Height form
d. Confine space form
e. Equipment Isolation checklist
SAFETY AND HEALTH PRACTICES
3. Before going to the site, a visitor or a contractor must undergo first to safety orientation.

4. In Republic Cement there are designated pedestrian lanes, to ensure safety for the
employees, contractors and visitors. The PPE’s must be ware as you walk along the designated
pedestrian lanes.

5. Headlights of the vehicle must be open, when entering the plant.

6. Wearing reap jeans is not allowed in the plant.


TOOLS AND EQUIPMENT INVOLVE
IN MAINTENANCE DEPT.
• Portable welding machine
• Oxygen cutter
• Grinder
• Lever block and chain block
• Wrenches ( Including pipe wrench, hammer wrench, socket wrench)
• Thermogun
• Micro lob and vibrating pen
• Caliper
CEMENT PRODUCTION PROCESS

Quarry Crusher VRM Homo Silo Preheater

Finish Mill Clinker


Pack House Cooler Kiln
Crusher
QUARRY
CRUSHER
VRM
HOMO SILO
PREHEATER
KILN
KILN
COOLER
CLINKER CRUSHER
FINISH MILL (BALL MILL)
FINISH MILL (BALL MILL)
FINISH MILL (BALL MILL)
PACK HOUSE
PACK HOUSE
PROBLEMS ENCOUNTERED
Perceived by the company:
1. The raw materials coming to Vertical Roller Mill (VRM) is wet, the raw materials cause to
build up in rotor.
2. The belt use in conveying system are always disrupted due to foreign materials like
metals, and weak joints.
3. The misalignment of bucket elevator due to wear of the rubber in the pulley.
4. Damage of motor, due to high vibration.
PROBLEMS ENCOUNTERED
Perceived by the OJT
1. Clogging in the pipelines
2. Lack of tools and equipment for the mechanics
3. Proper budget allotment in the maintenance of conveyor belts
4. Some department becomes superior, and lacks of recognition to other department
5. Passing of assigned task
• CLOGGING
• CONVEYOR BELT
RECOMMENDATION:
• Inspection and cleaning of pipeline more often to prevent clogging.
• Put insulation or cover on the pipeline of finish product cement to prevent build up on the
line because of moisture and exposure of the pipeline in the atmosphere.