Manufacturing Setup

By:-
Rishi Dewan – Roll No. 27
Ritwik Jain- Roll No. 28
Sahil Kohli- Roll No. 29
Saurabh Chincholikar- Roll No. 30
Saurabh Mathur- Roll No. 32
Saurabh Tomar- Roll No. 33
Introduction to Microsoft
Dynamics
ERP tool
CRM solution provider
Help in important business decision making
Automate and streamline various business processes
Topics to be covered
Setup Company data
Adding and editing line items
Maintaining work shifts and shop calenders
Work Machine centers and manufacturing capacity
setup
Routings (BOR – Bill of Resources)
Production BOMs (Bills of Materials)
Production BOM – Routing per item produced
Other setup procedures
Setup Company Data
Departments -> Administration->Application Setup->
General->Tasks->Company Information

Company Information consists of four tabs: (a)


General, (b) Communication, (c) Payments and (d)
Shipping
Parameterization of Items
Departments–>Manufacturing –>Product Design and
from the Lists ->Items
Result
F1 Help
Choose Columns
Right click on header line- select ‘Choose Columns’
FactBoxes
Work shifts – Shop Calendars
Working hours in a factory are break down into more
than one shifts.
We usually start with one shift
If work centers must work over their planned
capacity then we need to add shifts.
We assume that our factory operates from Monday to
Friday
Step
We choose Departments– Administration-
Application Setup –Manufacturing and then
Tasks –Manufacturing Setup
Screen Shot
Step

We choose Departments–Manufacturing –


Capacity and then Administration -Setup – Work
shifts.
Screen Shot
Step

Next we choose Administration –Setup – Shop

Calendars, add the 3rd shop calendar and OK


Screen Shot
Step
The next screen shows the day, starting and ending
time and shift.
We will change the ending time to 15:59:59 in all days.
Each time the system will confirm the change.
Screen Shot
Work – Machine Centres and
manufacturing capacity setup
Now we will setup the resources i.e.

Work Centers which are involved in the production of


bicycles

And also the capacity planning


Step
We choose Departments– Manufacturing –
Capacities and then Administration – Setup –
Capacity Units of Measure.
Screen Shot
Step
We select Capacities – Administration – Setup –
Work Centre Groups.
There are two groups defined the Inventory
department and the Production department
Work Center Groups
Work Centers
Work Center Card
Work Center Calender Matrix
Machine Centers

Good practice not give machine center a name of the employee


Machine Center Card
Routings (BOR – Bill of Resources)
Routings are used to show which work and machine centres
take part in the production of one unit of measure of a
specific product.
Various times that can be considered in a routing (setup,
run, wait, move etc.)
The labour, machinery, and tooling elements of
manufacturing can be as crucial as the component
materials you use. These are the elements that can cause
production to come to a crawl and cause costs to far exceed
projections. The TRAVERSE Routing and Resources
application provides the functionality to define these
important pieces of your manufacturing software solution.
Routings (BOR – Bill of
Resources)
Manufacturing 
Product Design  Lists–
Routings.
EDIT ROUTING
EDIT ROUTING
EDIT ROUTING
Production BOMs show which semi-finished (produced) and
purchased items are needed (in quantity) for the production
of one unit of measure of the item produced.
In a similar way to the routings, although production BOMs
are not directly connected to Items (only indirectly through
the item replenishment tab), for simplicity we tend to use for
the production BOM the Item No. that is produced using the
specific BOM.
CRONUS UK Ltd./Hom
e
1.Begining
2.Production Forecast Field
3.Numbering Feature
4.Defining Numbers
5.Number Specification
6.Changing Numbers
7.Result
Thank You