Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 1

pe

system ensures that:


by the DPL prior to issue for construction.
ved documents and drawings are used in the work face.
and unambiguous.

ed procedures and Inspection & Test Plans are controlled documents. The Quality Manager is responsible to ensure the initial issue and subsequent changes are acknowledged by those authorized t
approved by qualified and
has been established to control documents required for the Quality Management System. Project documents shall be maintained at the following Locations; authorized

ct prior to submitting to SATORP through DPL. This review shall be indic


ect. An index of as built documents shall be maintained as part of the file. All documents shall be verified for accuracy by
of the document control system
registration and distribution of contract
the submission of the request

You might also like