Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 8

Mehran University on Engineering And

Technology

Name: Waseem Abass


Roll no: F16PG54
Resented to:Allah Dinno Samo
Date: 29 -7-2020
Subject:Gas Reservoir Engineering
Dry Gas Reservoir:
• The word Dry Gas refers to gas comprising mainly of
methane and some intermediate hydrocarbon
molecule weight due to this compostion dry gas
never under goes phase change.No liquid is formed
either in reservoir or in production fascilities. This is
due to path of depletion is outside of phase
envolope.
Dry Gas Reservoir With Water Influx:

• Water influx in dry gas reservoir are from aquifer which are non
volumetric reservoirs.Encouraging water provides pressure support to
reservoir for production depeding on rate on encouragment.
• Recovery rate of non-volumetric are often lower than volumetric one's
because in non volumetric gas is bypassed and trapped by water.
Volumetric Method For Gas Reserve Calculation:

• Volumetric method is used to find volume of reserve in reservoir at any time during
production.

• Above equation is used to find initial gas in place by volumetric method. where,
• G= Gas in place, SCF
• Vb= Bulk volume, acre-ft
• ɸ= Porosity
• Swi= Water Saturation
• Bgi= Gas Formation Volume Factor
Volumetric Method For Gas Reserve Calculation:
• We can calculate total commulative gas production of reservoir at any time of production
by formula give below,

• Recovery Fator can be calculated by:


Volumetric Calculation of Dry Gas

For initial gas in place

For reservoir gas gravity for three stage separator

For reservoir gas gravity for two stage separator


Volumetric Calculation of Dry Gas

Molecular weight of tock tank liquid can be calculated by


either.

or by this

Original oil in place can be calculated by


Volumetric Calculation of Dry Gas

Fration of initial oil in place that can be in gaseous phase at


surface can be calculated by formula given below

You might also like