cleaning.
Electrical motors bearing check…etc.
We found part of the
cracked thermal
insulator
4 drums of ash and
damaged refractory had Ash found accumulated
been removed out from in ash receiving
deferent heater compartment
compartment
The heater was
opened and visually
inspected from
inside and the
attached photo show
the bundle tubes as
found .
This is the photo of
bundle tubes after
(hydro +chemical)
cleaning process
were carried out
All of the three
heater soot blowing
compartments were
opened for
inspection and
cleaning ,the
attached photo show
the condition found.
All of the three
heater soot blowing
compartments were
opened inspected
and cleaned out
from soot ,the
attached photo show
the condition after
(Hydro & chemical)
cleaning
The heater thermoil
bundles were tested
to 10 bar for 1 hours
and the result was
satisfactory no any
sign of pressure
drop or leak.
All cracks found in
the thermal
insulation have been
removed and
rehabilitated
The register was
found in a good
condition.
We found the
diffuser covered with
carbon and part of it
broken
The old nozzle was
cleaned and the diffuser
was replaced by new one.
The attached photos
shows the main gun after
reinstalled.
Service team complete Most of the service
successfully but they stopped without completion
due to delayed arrival of the spare part (diffuser).
The maintenance team at the station completed the
work successfully after receiving the (diffuser).
Operation start the heater for test now running ok.
A high pressure water jet is highly required to get
excellent cleaning results in a short time.
An advance training for some of mechanical and
electrical staff is essential .
Thanks
MANPOWER INCLUDED PREPARED BY
Sufyan Abakar PS#5 Maint. Forman
Alla Gabo Awad Eltayeb Elsheikh
Yousif Ahmed Ali. Mech Tech MUAWIA HASSAN
Mohamed Omer A/Alla. Mech Tech