ESTIMATION AND COSTING OF

RESIDENTIAL AND COMMERCIAL


BUILDING

MAJOR PROJECT
Submitted in partial fulfillment of the requirement for the

Award of Bachelor of Engineering Degree


In
Civil Engineering
To
Jawaharlal Nehru Technological University
Hyderabad
By
Mohd Adnan Afroze Uddin
Hafeez 14J11A0139
14J11A0138
Mohd Tajuddin
Mohd Sohail 14J11A0142
Ahmed Under the guidance of
14J11A0141 Prof. Srinivas Ganta

DEPARTMENT OF CIVIL
ENGINEERING
ABHINAV HITECH ENGINEERING
COLLEGE
JAWAHARALAL NEHRU
TECHNOLOGICAL UNIVERSITY
HYDERABAD
DECLARATION
We hereby declare that that the work embodied in this project is our
original work. It is submitted in partial fulfillment of the requirement for
award of bachelor of engineering degree in civil engineering to Jawaharlal
Nehru Technological University Hyderabad.

We further state that no part of this report has been submitted for any
other degree/diploma or any title equal in importance to any other
university.

Sr.No Roll No. Name Signature


1. 14J11A0138 Mohd Adnan Hafeez
2. 14J11A0139 Afroze Uddin
3. 14J11A0141 Mohd Sohail Ahmed
4. 14J11A0142 Mohd Tajuddin

Place- Hyderabad

Date-
Abhinav Hitech Engineering College

Certificate
Certified that the major project report entitled “Estimation
and costing of residential and commercial building” “is
submitted as an authentic record of major project done by
Mohd Adnan Hafeez (14J11A0138), Afroze Uddin
(14J11A0139), Mohd Sohail Ahmed (14J11A0141) and Mohd
Tajuddin (14J11A0142) students of civil engineering 7th
semester under our guidance in partial fulfillment of the
requirement for the award of bachelor of Engineering degree
in Jawaharlal Nehru Technological University Hyderabad.

Project guide: H.O.D. CIVIL ENGINEERING

(……………………….) (……………………………..)
Prof: Srinivas Ganta PROF: SRINVIAS GANTA
ACKNOWLEDGEMENT
We place on record and warmly acknowledge the
continuous encouragement, Invaluable supervision, timely
suggestions and inspired guidance offered by our guide Prof
Srinivas Ganta, Professor and H.O.D. of Civil Engineering at
Abhinav Hitech Engineering College, Hyderabad in bringing
this report to a successful completion.

We are grateful of department of civil


engineering for permitting us to make use of the facilities
available in the department to carry out the project
successfully. Last but not least we express our sincere thanks
to all our friends and our parents who have patiently
extended all sorts of help for accomplishing this
undertaking.

Mohd Adnan Hafeez (14J11A0138)


Afroze Uddin (14J11A0139)
Mohd Sohail Ahmed (14J11A0141)
Mohd Tajuddin (14J11A0142)
ABSTRACT
An estimate is a computation of the quantities required and expenditure
likely to be incurred the construction of a work. In any construction project,
the probable cost of construction which is known beforehand is known as
the estimated cost. And hence it is quite essential for the arrangement of
financial resources for the completion of any construction project.

In this project, the main aim was to find out the detailed estimate of
quantities of all the structural aspect of G+4 building. The location of the site
is at Vijay Nagar Colony, Hyderabad 500028. To estimate the total cost of
construction of the G+4 building. The G+4 building structure is designed as
ground floor for commercial stores and 1st floor for commercial office, The
2nd, 3rd and 4th floor is designed for residential, Cellar (Parking area) and
underground concrete water storage is also estimated.

It also aims in finding out the probable cost, or the estimated cost of the
project based on the computation of these quantities.

The structural aspects considered for the estimation of quantities and


costing with labors and machinery required for earthwork in excavation and
backfilling, concrete work in foundation and in R.C.C structures such as
beams, columns, slabs, staircases etc., steel reinforcement in beams,
columns and other R.C.C structures and brickwork in superstructure,
shuttering in slabs, columns, beams etc., construction equipment’s, flooring,
doors , windows, door frames , window frames, plaster of Paris , ceilings ,
wall drops , plastering considering (1st and 2nd ) coat , painting ,glass marble
finishing etc.,

The computation of quantities was carried out based on the drawings of


various structural elements, such as the each floor plan, footings and
columns layout, beams layout, staircases layout, footing specifications and
column specifications, which have also been provided in this document.
These details provide an idea for requirement of quantities for a particular
project and also the likely expenditure which would be needed to be
arranged .This documentation also provides the abstract of the estimated
cost for the structural aspects.