Genset Quick Start Guide (PBB and BEVMi)
Genset Quick Start Guide (PBB and BEVMi)
Prepared by:
Jeovanie Dioses
Maintenance Engineer
Approved by:
Romel Agbing
Engineering and Maintenance Head
Strictly
Engineering andPrivate and Confidential
Maintenance Department
GENERATOR SET
BASIC PARTS
1. Radiator
7
1 2. Engine
3. AC Alternator
2
4. Fuel Tank
3
5
5. Oil Filters
6 Sir Aljeen
8 6. Control Panel
4 7. Air Filters
8. Batteries
Strictly
Engineering andPrivate and Confidential
Maintenance Department
DURING POWER OUTAGE
Strictly
Engineering andPrivate and Confidential
Maintenance Department
• Coordinate to the area owner that there is a power interruption
• Advise them to turn OFF all the machine and equipment inside
the Plant
Strictly
Engineering andPrivate and Confidential
Maintenance Department
Open the Main Supply
(Meralco) Panel
Strictly
Engineering andPrivate and Confidential
Maintenance Department
Turn OFF the MDP 460
Main Circuit Breaker
Strictly
Engineering andPrivate and Confidential
Maintenance Department
Turn OFF the circuit
breaker of PBB MDP
230 Panel and MDP
ACCU
Strictly
Engineering andPrivate and Confidential
Maintenance Department
Open the GENSET
Control Panel
Strictly
Engineering andPrivate and Confidential
Maintenance Department
The HMI will show’s Click the HAND
“Generator at Rest”. BUTTON (Manual)
The Genset will start
running
Strictly
Engineering andPrivate and Confidential
Maintenance Department
During GENSET’s Transient period, it will running from 0 to normal
running condition (0V to 460V, 0Hz to 60Hz)
Strictly
Engineering andPrivate and Confidential
Maintenance Department
• If the GENSET’s HMI show’s that the supplied
voltage as well as the frequency are
Strictly
Engineering andPrivate and Confidential
Maintenance Department
Turn ON the GENSET’s
Breaker
Strictly
Engineering andPrivate and Confidential
Maintenance Department
Turn ON Main Circuit
Breaker of MDP 460,
ACCU and MDP 230
Strictly
Engineering andPrivate and Confidential
Maintenance Department
• Coordinate to the area owner that the GENSET is currently
running
• In the case of PBB, the installed GENSET can supplied all the
machine and equipment inside their plant. They can turn ON
their Equipment and Machineries
Strictly
Engineering andPrivate and Confidential
Maintenance Department
ELECTRICAL POWER
RESTORED
Strictly
Engineering andPrivate and Confidential
Maintenance Department
• Coordinate to the area owner that the Electrical Supply from the
GRID (Meralco).
Strictly
Engineering andPrivate and Confidential
Maintenance Department
Turn OFF the Genset
Breaker
Strictly
Engineering andPrivate and Confidential
Maintenance Department
Turn OFF the GENSET
Control Panel MCB
Strictly
Engineering andPrivate and Confidential
Maintenance Department
Turn OFF the circuit breaker
of PBB MDP 460, PBB MDP
230 Panel and
MDP ACCU
Strictly
Engineering andPrivate and Confidential
Maintenance Department
Turn ON the Main Circuit
Breaker (Meralco Supply)
Strictly
Engineering andPrivate and Confidential
Maintenance Department
Turn ON the circuit
breaker of PBB MDP
460, PBB MDP 230
Panel and
MDP ACCU
Strictly
Engineering andPrivate and Confidential
Maintenance Department
• Advise the area owner that the power supply is restored.
Strictly
Engineering andPrivate and Confidential
Maintenance Department
Strictly Private and Confidential
BEVMi GENSET SWITCHING
Rated: 75kVA, 3phase, 230V
Prepared by:
Jeovanie Dioses
Maintenance Engineer
Approved by:
Romel Agbing
Engineering and Maintenance Head
Strictly
Engineering andPrivate and Confidential
Maintenance Department
DURING POWER OUTAGE
Strictly
Engineering andPrivate and Confidential
Maintenance Department
• Coordinate to the area owner that there is a power interruption
• Advise them to turn OFF all the machine and equipment inside
the Plant
Strictly
Engineering andPrivate and Confidential
Maintenance Department
Strictly
Engineering andPrivate and Confidential
Maintenance Department
Go to the MAIN
CIRCUIT BREAKER
PANEL BOARD
(2500 Amp)
Strictly
Engineering andPrivate and Confidential
Maintenance Department
Air Circuit Breaker
Strictly
Engineering andPrivate and Confidential
Maintenance Department
Go to the GENSET
Strictly
Engineering andPrivate and Confidential
Maintenance Department
Closed/ connect the
Genset’s Knife Switch
Strictly
Engineering andPrivate and Confidential
Maintenance Department
Start the Genset
Strictly
Engineering andPrivate and Confidential
Maintenance Department
Rotate the Speed Controller to the
right, do this gradually until the
frequency reach 60Hz
Note: Voltage is directly proportional to Speed
Strictly
Engineering andPrivate and Confidential
Maintenance Department
Ensures that the there is water
flowing in the Genset’s Radiator
(it’s serve as a cooling mechanism)
Strictly
Engineering andPrivate and Confidential
Maintenance Department
COSMETICS ELECTRICAL
PANEL BOARDS
Strictly
Engineering andPrivate and Confidential
Maintenance Department
Turn OFF all the Circuit
breakers
Strictly
Engineering andPrivate and Confidential
Maintenance Department
Meralco Genset Meralco Genset
Turn OFF the Meralco C.B.
and Turn ON the Genset
C.B.
Meralco Genset
Meralco Genset
Strictly
Engineering andPrivate and Confidential
Maintenance Department
Check the Voltage per phase of
the Genset, if it is 220V-230V, it
is ready to use
Strictly
Engineering andPrivate and Confidential
Maintenance Department
Once checking and validate that the
Voltage and Frequency is around 220-
230V, 60Hz,respectively
Strictly
Engineering andPrivate and Confidential
Maintenance Department
Turn ON all the Circuit
breakers
Strictly
Engineering andPrivate and Confidential
Maintenance Department
• Currently, our existing Genset can supplied only the COLD
PROCESS DEPARTMENT and ADMIN.
• Advise the area owner that our Genset is currently running. They
can turn on their lightings and some machine (Mixer/ Flow Wrap
or Inkjet).
Strictly
Engineering andPrivate and Confidential
Maintenance Department
• During operation, check the Ampere per Line of the genset to
secure that only 80% or lower of total genset capacity is being
used, 150 Ampere below
Strictly
Engineering andPrivate and Confidential
Maintenance Department
ELECTRICAL POWER
RESTORED
Strictly
Engineering andPrivate and Confidential
Maintenance Department
• Coordinate to the area owner that the Electrical Supply from the
GRID (Meralco) is restored.
Strictly
Engineering andPrivate and Confidential
Maintenance Department
Turn OFF all the Circuit
breakers
Strictly
Engineering andPrivate and Confidential
Maintenance Department
Turn OFF the GENSET’s BREAKER
Strictly
Engineering andPrivate and Confidential
Maintenance Department
Reduce the speed gradually.
Strictly
Engineering andPrivate and Confidential
Maintenance Department
Switch OFF the GENSET
Strictly
Engineering andPrivate and Confidential
Maintenance Department
Disconnect the GENSET’s Knife
Switch
Strictly
Engineering andPrivate and Confidential
Maintenance Department
Meralco Genset Meralco Genset
Switch the breaker from
GENSET to MERALCO
Meralco Genset
Meralco Genset
Strictly
Engineering andPrivate and Confidential
Maintenance Department
Go to the MAIN
CIRCUIT BREAKER
PANEL BOARD
(2500 Amp)
Strictly
Engineering andPrivate and Confidential
Maintenance Department
Air Circuit Breaker
Strictly
Engineering andPrivate and Confidential
Maintenance Department
COSMETICS ELECTRICAL
PANEL BOARDS
Strictly
Engineering andPrivate and Confidential
Maintenance Department
Turn ON all the Circuit
breakers
Strictly
Engineering andPrivate and Confidential
Maintenance Department
• Advise the area owner that the power supply is restored (all
departments)