POWER PLANT
COMMISSIONING ITU APA SIH ?
COMMISSIONING ITU ADALAH SUATU AKTIFITAS PENGUJIAN DAN TEST
KEHANDALAN SUATU SYSTEM PADA SUATU PLANT YANG SUDAH SELESAI PROSES
KONSTRUKSINYA. HAL INI DILAKUKAN SEBELUM PLANT TERSEBUT DI OPERASIKAN
KAN ATAU DISERAH TERIMAKAN KE OWNER SEBAGAI PEMILIK PLANT.
SYSTEM DI POWER PLANT YANG WAJIB DIKETAHUI ADALAH :
• WATER SYSTEM
• FUEL OIL SYSTEM
• STEAM SYSTEM
• FLUE GAS SYSTEM
• AIR SYSTEM
• LUBE OIL SYSTEM
• ASH HANDLING SYSTEM
• COAL HANDLING SYSTEM
• COMPRESSION AIR SYSTEM
• FIRE PROTECTION SYSTEM
TAHAPAN POKOK KONSTRUKSI
• TACHO METER
• GUN THEMPERATURE
• NOISE LEVEL
• VIBRO METER
• FILLER GOUGE
• MEASUREMENT TAPE
• MIRROR
• DIAL INDICATOR
• WELDING MACHINE
• GRINDING MACHINE
• CHAIN BLOCK, LEVER BLOCK
• HAND TOOLS
ALAT UKUR UNTUK ELECTRICAL
• VOLTAGE TESTER
• AMPERE METER
• FREKUENSI METER
• OHM METER
• HV TEST HIPOT
• INSULATION TESTING
• CT RASIO
• ETC.
SATUAN UKURAN
•PROJECT MANAGER
•COMMISSIONING MANAGER
•COMMISSIONING ENGINEER
•COMMISSIONING SUPERVISOR
•SKILL TECHNICIAN
•DOCUMENT CONTROL
STANDARD & CODE
STANDARD
& CODE
JOB DESCRIPTION COMMISSIONING ENGINEER
• TO INSPECT AND VERIFY BOTH MECHANICAL AND ELECTRICAL INSTALLATION DONE BY CONTRACTOR AT SITE.
• RESPONSIBLE FOR ENSURING THAT ALL MECHANICAL AND ROTATING EQUIPMENT PACKAGES ARE DESIGNED, PROCURED,
CONSTRUCTED, TESTED, INSTALLED, AND COMMISSIONED IN ACCORDANCE WITH COMPANY TECHNICAL REQUIREMENTS AND
SPECIFICATIONS
• REVIEW DESIGN, REQUISITIONS , SPECIFICATIONS, BID LISTS, VENDOR QUOTATIONS/BIDS (ENSURE THAT ALL EQUIPMENT ARE IN
ACCORDANCE WITH THE INSTALLATION DOCUMENT ABOVE) BE COMMISSIONING.
• ENSURE THE INSTALLATION IS INSTALLED CORRECTLY TO COMPLY WITH THE COMMISSION ABILITY
• PREPARE ERECTION CLEARANCE CECRTIFICATE AS PER CLIENT BOUNDARY PACKAGE
• COORDINATE WITH TEAM THAT THE SYSTEM CAN BE COMMISSIONING
• ENSURING THE SAFE TESTING AND COMMISSIONING OF COMPLETED INSTALLATIONS TO ACHIEVE THE NECESSARY PLANT
PERFORMANCE IN ACCORDANCE WITH PROJECT REQUIREMENTS
SETELAH DI CHECK DAN DIRASA SEMUA DOCUMENT SUDAH LENGKAP, KITA AKAN MULAI PELAKSANAAN
COMMISSIONING DARI INDIVIDUAL TEST , CONTOH NYA :
SOLORUN TEST MOTOR OLEH ELECTRICAL TEAM
LEAK TEST , FLUSHING AND BLOWING AT PIPING
WATER FILLING STORAGE TANK
END CLOSURE PRESSURE VESSEL
DUCTING LEAK TEST
ETC.
SETELAH POMPA MELALUI PROSES FINAL ALIGNMENT COUPLING SETELAH SOLO RUNS TEST, POMPA AKAN DI
COUPLE COPLINGNYA DAN DI LAKUKAN LOAD RUN TEST YAITU DIOPERASIKAN DI BERI BEBAN ALIRAN AIR
ATAU MINYAK PADA JALUR PIPA.
HTTPS://YOUTU.BE/VOZSIQYX2EE
• LOAD RUN TEST PUMP ADALAH SUATU KEGIATAN UNTUK MENGUJI KEHANDALAN DAN KEKUATAN POMPA DENGAN MEMBERI BEBAN PADA POMPA DENGAN CARA DI
OPERASIKAN DALAM JANGKA WAKTU TERTENTU DAN DI CHECK VIBRASI, THEMPERATUR, NOISE DAN RPM NYA.
• VIBRASI = VIBRATION METER = SATUANNYA CPS (CYCLES PER SECOND) ATAU HERTZ
• NOISE = NOISE LEVEL = NOISE LEVEL METER = SATUANNYA DBA (DESIBEL EKUVALEN) KEP- 51/MEN/1999, TENTANG NILAI AMBANG BATAS (NAB) KEBISINGAN DI
TEMPAT KERJA, DITETAPKAN SEBESAR 85 DBA.
GUN THEMPERATURE
NOISE LEVEL
TACHO METER
NAH… MARI KITA MENCOBA SIMULASI UNTUK COMMISSIONING WATER
TREATMENT PLANT UNTUK MEMBUAT DEMINERALIZED WATER
YANG HARUS KITA SIAPKAN ADALAH :
JSA & WORK PERMIT
FLOW DIAGRAM PROCESS & ARRANGEMENT DRAWING
PIPING & INSTRUMEN DIAGRAM
SPECIFICATION
PIPE DESIGNATION LINE
SPECIFICATION OF EQUIPMENT ; KITA CARI BQ NYA DAN MDR NYA
SIAPKAN MANPOWER, TOOLS, MEASUREMENT TOOLS, FORM ATAU ISIAN UNTUK MERECORD HASIL TEST
FLOW DIAGRAM PROCESS
• PADA POMPA CHECK VIBRASI, THEMPERATURE, NOISE DAN RPM NYA SESUAI FORM DAN CHECK LIST YG
SDH DIBERIKAN ENGINEER COMMISSIONING PER PERIODE YG SDH ADA DI FORM