Professional Documents
Culture Documents
Math (Reinforcement in Rigid Pavement)
Math (Reinforcement in Rigid Pavement)
Dowel Bar
Tie Bars
Calculation of Temperature/Distributed Reinforcement
𝑊𝑓𝐿
𝐴 𝑠=
𝑓𝑠
steel per foot of width
=weight of slab ()
L = length of slab
= allowable stress of steel (psi)
𝑡 𝑙𝑏
𝑊= × 150(𝑤h𝑒𝑟𝑒 𝑡 𝑖𝑠 𝑖𝑛𝑐h 𝑎𝑛𝑑 150 3 𝑢𝑛𝑖𝑡 𝑤𝑡 𝑜𝑓 𝑅𝐶 )
12 𝑓𝑡
Distributed Temperature Reinforcement: 𝑊 = 𝑡 × 150
12
45
150 ×12 ×1.5 ×
𝑊𝑓𝐿 150 𝑡𝑓𝐿 2
Longitudinal direction 𝐴 𝑠= ⇒ 𝐴 𝑠= ⇒ 𝐴 𝑠=
𝑓𝑠 12 𝑓 𝑠 12× 33000
⇒ 𝐴 𝑠=0.153𝑖𝑛 2 / 𝑓𝑡
If #4 bars are used, spacing = = 1.3ft c/c 1 ft c/c
24
150 ×12 ×1.5 ×
𝑊𝑓𝐿 150 𝑡𝑓𝐿 2
Transverse direction 𝐴 𝑠= ⇒ 𝐴 𝑠= ⇒ 𝐴 𝑠=
𝑓𝑠 12 𝑓 𝑠 12× 33000
⇒ 𝐴 𝑠=0.082𝑖𝑛 2 / 𝑓𝑡
If #4 bars are used, spacing = = 2.44 ft c/c 2 ft c/c
Tie bars along longitudinal construction joints:
24
150 ×12 ×1.5 ×
𝑊𝑓𝐿 150 𝑡𝑓𝐿 2
Transverse direction 𝐴 𝑠= ⇒ 𝐴 𝑠= ⇒ 𝐴 𝑠= 𝐴 𝑠=0.1𝑖𝑛 2 / 𝑓𝑡
⇒
𝑓𝑠 12 𝑓 𝑠 12× 27000
𝑓𝑠𝑑
Length of tie bars is , l ( in )= + 3(𝑤h𝑒𝑟 e 𝑓 𝑏=10 % 𝑜𝑓 𝑓 ′𝑐 )
2𝑓𝑏
5
27000 ×
8
⇒ l ( in )=
2 × 350
+3 ⇒ l (in )=27.11 in ≈ 24 𝑖𝑛≈ 2 𝑓𝑡
Dowel bars across transverse and contraction joints
Bar Detail Transverse Joints Contraction Joints
Bar Size 10 No 8 No
Length 2 ft 2 ft
Spacing 8 in c/c 12 in c/c
A
#4
@ 24 in c/c
#4
@ 12 in c/c