Value Preposition
Growing demand for validated
Building Automation System
Convergence of Industrial and
Building Automation
More efficiency using same
technology/spare parts etc for
Process automation
Building automation
Integration of FDA relevant data
with the building automation
system, if the process automation
tasks do not justify investments for
DCS or PLC type automation
Secondary pharmaceutical
manufacturing plants
Packaging plants
© ABB - 5
Floor Plan and Phases
© ABB - 6
Building Automation with 800xA
Needs: Products:
Air cleanliness control Air handling units EU 2000
Air flow control Air flow controllers
Pressure control Blue duct
Temperature control Laminar flows/units
Humidity control Diffusors
Running security Air locks
Incubators
Solutions:
HVAC four level concept
Building Automation with System 800xA
Heating / Cooling recovery with System 800xA
© ABB - 8
Clean Rooms from Class 100 to 100,000
CORRIDOR
PAL MAL
STERILE
CLASSIFIED Air Locks
ROOM
MAL
CORRIDOR
© ABB - 9
4 Level Concept
EU 15 EU 15
© ABB - 11
Level 4 + Level 3: Space Control Unit
P
EU 15 EU 15
© ABB - 12
Level 3-4 + Level 2: Recirculation Air
P EU-2000 P
P
EU 15 EU 15
© ABB - 13
Level 2-4 + Level 1: Fresh Air
EU-2000
EU-2000 EU 13
+
+ + - +
-
EU9EU4
P
Extraction Air EU9 EU 13
-
P EU-2000 P
P
EU 15 EU 15
© ABB - 14
Building Automation with System 800xA
Conditions are continuously monitored:
Alarms and Events indicate
Predefined limits are exceeded
Conditions are violated
Alarms
Automatically created
Visible in all displays
Single alarm and alarm group indication
Graphic Display
Example: Air Unit Ground Floor
Schedule
Weekly
User Access Control
Change Control
Reporting
© ABB - 15
Building Automation with 800xA
Suitable location
Suitable construction
Suitable size/layout (to
prevent
cross-contamination)
Adequate HVAC
Adequate lighting
Maintainable
Cleanable
Glossary:
GMP: Good Manufacturing Practice
© ABB - 17
GMP - Buildings and Facilities Issues
Process Buildings
Process Rooms / Production
Suites
Environment Parameters
Utility Areas
Environment and Process
Parameters
Plant Plant
Operator
Chillers, ...
800xA Library Concept
Air Handler Control
Air Handling Unit
Damper Control Device
Fan Control Device
Fan Duty Standby Device
Air Filter Monitor Device
Room Monitoring
Temperature Monitor Device
Relative Humidity Device
Differential Pressure Device
Particle Monitor Device
General Functions
Time Switch Device
Day, Week, Month
Energy Management Interface Device
Life Safety Interface Device
-
Fire Smoke Detection Interface Device
Access Control and Monitoring Interface
Device
Emissions Control Analyzer Control
Interface (LON/OPC)
Hydrogen
... Plant-Areas Plant/Site Site/Corporate
Examples: Standard Report Templates in Excel
Trip
20 pre-trip and 10 post-trip
values with 10 seconds between
values.
Trend
Hourly - one minute values
Shift - eight one hour values
Daily - one hour values per
Monthly - daily values
Event
One hour time span with filtering
Snapshot
Standard - 20 signal values from
the historian
Real-time - 20 current signal
© ABB - 27
values