Floating Head Heat Exchanger

General Assembly view


Gaskets
Tube side Inlet Shell side Inlet
Gasket

Floating Head
Shell Bundle

Back Cover

Distributor
Saddle

Tube side Outlet Shell side Outlet

Tube Sheet

1
Floating Head Heat Exchanger
Split View of Parts
Gasket Gasket Split ring Spacer Gasket
Gasket
Tube Bundle

Tube sheet Tube sheet Floating


Distributor Head Back Cover

Shell

Floating
Head Detail

2
Causes of Gasket Leakage
• Wrong Gasket selection

• Insufficient Tightening

• Non -Uniform Tightening

• Thermal stress across the fasteners –Thermal expansion or contraction

• Thermal Shock

• Over pressurization

• Tube to Tube Sheet leakage

• Difference in height of pass partition and tube sheet sealing surface

• Air in the liquid line ( Process line/ Steam line / Water line etc. is not
vented properly) 3
Leakage Testing Procedure

Blind Inlets-Outlets at Disconnect and remove


plant area Floating Head with gasket

Disconnect and remove Install the bundle puller


Distributor with gasket
Disconnect and remove Pull the bundle out
Back cover with gasket

Bundle Puller

Ground level

4
Lower the bundle and Lift the bundle puller with
take to hydro-jetting area clean bundle and new gasket,
Clean Shell and covers ready for reinstallation

Bundle Puller

Ground level 5
Reinsert the bundle by Lower the bundle puller to
bundle puller the ground and take it away

Bundle Puller

Ground level
6
 Shell Side Hydro-test
Install front Test Ring with Install Pressure Gauge Raise the pressure up to
gasket value given by Inspection
Connect water pump
Install back Test Ring Check leakages from
with gasket Fill the shell by water tubes
Install Blinds in shell

PG

Ground level Water Pump


7
Shell Side Hydro-test …
Check leakages from tubes continuation
PG

“A” “B”
Water

View “A”

Water

View “B”

8
Discharge water from Reinstall distributor Remove Test Ring &
shell drain with new gasket & gasket [floating head
Remove Test Ring & tight bolts side]
gasket [distributor side] Blind Distributor in & Reinstall Floating Head
out with split flange, new
gasket & tight bolts

PG

Drain

9
Tube Side Hydro-test

Install PG in distributor Check floating head Discharge the water,


top nozzle gasket sealing remove PG and water
Connect water pump Check distributor gasket pump
sealing Remove blinds form
Fill tube side by water
distributor nozzle and
Raise the pressure up to
value given by Inspection
tight bolts

PG PG

Drain

Water Pump

10
Shell Side Final Hydro-test

Install Back cover with Check Back cover Discharge the water,
Gasket gasket sealing remove PG and water
Connect water pump pump
Check bundle to shell
Fill Shell side by water gasket sealing Remove blinds form
shell nozzles and tight
Raise the pressure up to bolts
value given by Inspection

PG

Drain

Water Pump

11