PAKISTAN WATER AND POWER

DEVELOPMENT AUTHORITY

DASU HYDROPOWER PROJECT


PRESENTED BY
 SHABBIR AHMAD
(JUNIOR ENGINEER)

 
SEQUENCE OF PRESENTATION
1. Project Location
2. Project Background
3. Project Objective
4. Project Introduction
5. Phasing of the Project
6. Salient Features of the Project
7. Land Required for the Project
8. Major Components of Main Work
9. Preparatory Work
10. Electro-Mechanical Work
PROJECT LOCATION
 07 km North of Dasu town, District Kohistan,
Khyber Pakhtunkhwa Province, Pakistan

 350 km North of Islamabad, Capital city of


Pakistan

 74 km downstream of the Diamer Basha Dam


site
Dasu Hydropower Project Background

 The energy sector in Pak. is suffering from an acute energy


crises .
 caused by an increasing gap between insufficient supply
and a growing demand.
 Electricity use over the decade between 2001 and 2011

grew an estimated 7.6 percent per year.


 Supply increased in the same period only 3.5 percent per

year, resulting in a shortfall of over 7,700 MW in 2011.


 If production is not accelerated, the gap between demand

and supply is expected to increase to over 17,000 MW by


2029.
Dasu Hydropower Project Background

The Vision 2025 Program of WAPDA: In order to


increase hydropower generation capacity while
maintaining water supply to the Indus irrigation
system, the Water and Power Development Authority
(WAPDA) prepared its “Vision 2025” program. The
proposed DHP is an integral part of this program and
the Power Policy 2013 of the GoP.
Project Objective
 To facilitate a sustainable expansion of Pakistan’s
electricity generation capacity in order to bridge the
increasing gap between supply and demand.
 contribute to the country’s strategy to move away from
high cost fossil fuel powered thermal plants towards low
cost, cleaner hydropower generation

 The cost of electricity generation will be considerably


reduced and foreign exchange will be saved by reducing
fuel imports
PROJECT INTRODUCTION
 Employer WAPDA 

 Feasibility Completed in 2009.


 
 Contractor CGGC (China Gezhouba
Group of Companies)

 Consultants DHC (JV of Nippon Koei,


DOLSAR,NDC, DMC, PES)
PROJECT INTRODUCTION

 Bid Type ICB


 Bid Opening 12-05-2016 

 Award Of Contract 29-12-2016

 Contract Agreement Signing 08-03-2017

 Commencement 23-06-2017
 
 Completion Period 2023
 
Phasing of the project

 Stage-I

 Main Hydraulic Structures

 Installation of 6 Turbines

 Installed Capacity 2160 MW

(360MW each)
Phasing of the project
 Stage-II

 After Diamer Bahsha Dam

 Installation of 6 remaining turbines.


SALIENT FEATURES
 RCC Gravity Dam
 Crest length 570 m
 Height 242 m
 Head 184 m
 Storage 1,410 MCM
 Reservoir area 75 km-long -365m-wide
 Total installed capacity 4320 MW
 Annual energy 26,700 GWh
 Design discharge 2670 cumecs
 Safety check flood 51957 cumecs
SALIENT FEATURES
Spillway Gates 08 Nos.

Low Level Outlets 09 Nos.

Headrace Tunnel 04 Nos.


(Each 500m long and 12m diameter)

Tailrace
Tunnel 04 Nos.
Length 2200m
Wide 10m
High 12.5 m
Land Required for Dasu HPP

 Total 9875 Acres


 Civil Work 866 Acres
 Preparatory Work 1121 Acers
 Reservoir Area 788 Acers
 Acquired 740 (7.5%)
MAJOR COMPONENTS OF MW
 Diversion tunnels

 Flushing tunnels

 Coffer dam

 Spillways

 Low Level Outlets


MAJOR COMPONENTS OF MW
 Diversion Tunnel-I
 Length 1200.7m
 Shape D-Type
 Size 20m High x 19m Wide
 Design Discharge 10380 cumecs

 Diversion Tunnel-II

 Length 1512.80m
Flushing Tunnels
 For flushing of sediments

 Right Bank Flushing Tunnel


 Length 743m
 Shape Circular (9.5m diameter)
 Discharge Capacity 1060 cumecs

 Left Bank Flushing Tunnel


 Length 1041.77m
PREPARATORY WORKS
1. KKH-01 Relocation
Total cost: Rs. 14.53 Billion
Contractor: China Civil Engineering Construction Corporation
Total length: RD-0+00 to RD-25+200, (25Kms)
Start point : 11Kms D/S of Dam Axis
Commencement date: August 2015
Currant Status 17.90%

2. KKH-02 Relocation
Total cost: Rs. 16.2649 Billion
Contractor: China Ghezhouba Group of Companies
Total length: RD-25+200 to RD-62+231 (37Kms)
Start Point: 14Kms U/S of Dam Axis
Commencement Date: Not yet commenced
PREPARATORY WORKS
3. RAR-01 Rehabilitation
Total Cost: Rs. 2.71Billion
Contractor: China Civil Engineering Construction Corporation
Total length: RD-0+00 to RD-12+061 (12Kms)
Start point: 12Kms D/S of Dam Axis
Commencement date: August 2015
Currant Status 22.80%

4. RAR-02 Rehabilitation
Total Cost: Rs. 6.2534Billion
Contractor: China Gezhouba Group of Companies
Total length: RD-12+061 to RD-54+00 (42Kms)
Commencement Date: Not yet commenced
PREPARATORY WORKS
5. 132 KV Transmission Line & Grid Station
Total cost: 1.75 billion
Total length: 45Km from Pattan to Dasu
Total towers: 179 Numbers
Contract period: 474 days (230 original + 244 EOT)
Currant Status 42.60%

6. Project Colony & Infrastructure (PC&I)


Contract Status: Recently awarded to China Gansu International
Corporation
Colony Location: Approx 3Km D/S of Dam site at Chuchang village
Total Area: 74.1 Acres (592.8 Kanal)
Contract period: 727 days
Currant Status 02.90%
Dasu HPP Colony
132 KV Transmission Line & Grid Station
Electro-Mechanical Work
 November 25, 2019 Contract signed for
electro-mechanical works of Dasu
Hydropower Project.
 Joint venture of GE Hydro China and

Power China Zhongnan Engineering


Corporation for electro-mechanical works
of Dasu Hydropower Project (Stage-I)