Material Requirement Planning PPT

You might also like

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 19

Shivom Chakravarty

Materials
Requirement
Planning
What is it about?

Independent Demand ---- Depended Demand

Concept of MRP
» Lot for Lot / Fixed Order – Inventory Ordering
» (Lower ) Level Number

Terms
» Master Production Scheduling – MPS – End
Products Requirements
» Bill of Material - BOM
» Inventory in Hand – Inventory Record File
» Lead Time (for each component) – A> Ordering
Lead Time or B> Manufacturing Lead TIme

Required Data
Examples 
Are there any
Common Use
Items??

Home Theater!
» Let’s have that data!
» 300 Speakers in Week 10
» All Listed parts and sub-parts
» Lead Times

End Product
Requirements
and
Lead Times
Lot Size Lead Time On Hand Safety Lower Level
Discipline (Weeks) Inventory Stock   Code Item Id (Name)   1 2 3 4 5 6 7 8 9 10
Lot for Lot         0 A Gross Requirements                    
              Scheduled Receipts                    
              Projected On Hand                    
              Net Requirements                    
              Planned Order Receipts                    
              Planned Order Releases                    
                                   
          1 B Gross Requirements                    
              Scheduled Receipts                    
              Projected On Hand                    
              Net Requirements                    
              Planned Order Receipts                    
              Planned Order Releases                    
                                   
          1 C Gross Requirements                    
              Scheduled Receipts                    
              Projected On Hand                    
              Net Requirements                    
              Planned Order Receipts                    
              Planned Order Releases                    

Materials Requirement Plan


Using the Inventory Record
Another
Example??
Cycle!
» Demand : 500 Cycles to be delivered on week 22

» Parts : Saddle, Tyre, Wheel, Reflector, Frame, Chain


Assembly, Handlebar, Brakes, Fork, Rim, Spokes,
Tyre Vavle, Padal

» Lead Times : Order / Assembly

Data for Example 2


    Days  
S No Component Order Lead Time Assembly Lead Time
1Saddle 14 3
2 Tyre 5 
3 Wheel   14
4 Reflector 5 1
5 Frame 10 1
6 Chain Assembly 14 1
7 Handlebar 10 2
8 Brakes 7 1
9 Fork 4 
10 Rim 19 
11 Spokes 20 4
12 Tyre Valve 2 1
13 Padal 15 2

Lead Times - Cycle


0                  Cycle (1)            
                                 

Saddle Wheel Chain Brakes


1    (1)     (2)       Frame (1)     Assembly (1)     (2)
                                 
                                 
RIM Spokes Fork Handle Chain Paddle
2        Tyre (1) (1) (48)   (1) Bar (1)   Wheel (1) Chain (1) (2)    
                                 
                                 
Tyre
3        Valve (1)                      

BOM – Cycle (Simplified)


» 1. Inputs – MPS, BOM, Inventory Record, Lead
Times
» 2. Do Parts Explosion!
» 3. Offset requirements (by lead times)
» 4. Netting = Gross – Available Inventory
» 5. Lot Sizing ( for placing order for procurement
or production)

Summary of
MRP Logic
Almost over 
Using a Different Lot Size Discipline
( First Min Lot Size (for a component, say,
Saddle = 150, then multiples of 20) .
» Congrats!

MRP Done !