Directional Soil Improvement Technology For Urban Underground Construction Projects in Vietnam
Directional Soil Improvement Technology For Urban Underground Construction Projects in Vietnam
TECHNOLOGY
FOR URBAN UNDERGROUND CONSTRUCTION PROJECTS IN VIETNAM
Urban
Area
High High
construction population
ratio density
WHAT IS THE RESTRICTION
Drainage by Dewatering
Using structural well
elements or material Modification by Soil Consolidation
inclusions, Hydraulic Change soil permeability
integrated with ground confinement and Improvement Modification
reinforcement Technology
Compaction
Grouting/
Injection Method
Drainage Method
• Dewatering well Compaction and
Grouting/Injection
Vibration Method
• Cause the vibration
Method
• Jet Grouting
Soil • Chemical Grouting
Improvement Drainage Method
• Change under ground water level
• Might occur the settlement to surrounding
• Deep Mixing
Technology structure
Pre-compress and
Consolidation
Geosynthetics • Surcharge
• Take time
• Vertical drain
• Vacuum Consolidation • Might also occur the settlement to
surrounding structure
Vibration Method
Cement Slurry +
Air + Water
Desludging
Triple tube
(Cement slurry + Air + Water)
Upside Jet :
High pressure water
(40Mpa, 50L/min)
Downside Jet :
High pressure cement slurry
Cement with high pressure Air
Column
(40Mpa, 300L/min)
D3.5m
10
BIG DIAMETER JET GROUTING - MACHINERY
Automatic cement
Boring machine mixer
High pressure pump
for water Cement silo
25t Truck crane
14
(3) Installation of construction stage
15
(4) Installation of machine
17
(6) After boring to predetermined depth, starting jet
grouting.
18
(7) Processing for desludging
Desludging
P tank
Small equipment/machinery
• Easy to mob/demob
• Easy to setup in narrow site in urban area
• Easy to reach restricted area (at proximity to another building/structure or under a flyover...)
• 2,5 m heigth
BD Jet
• ~30m heigth
• 3,5T
• ~80T
CDM
• 50m improved
• ~30m improved
ADVANTAGES COMPARING TO CONVENTIONAL JET
GROUTING METHOD
(1) REDUCTION OF THE CONSTRUCTION PERIOD
Number of grouting holes
(For Example) Soil Improvement Zone: 15m*20m=300m2
Soil Improved Depth: 10m
Construction period
[Conventional method (φ1.0m)] [Big Diameter Jet method (φ3.5m)]
- Grouting time : 72,900min - Grouting time : 3,960min
- Efficiency : 360min/day*1rig - Efficiency : 360min/day*1rig
- Number of rig : 4rigs - Number of rig : 1rigs
- Construction period : 72,900/360/4=51days - Construction period : 3,960/360/1=11days
23
(3) HIGH AVOIDANCE CAPABILITY OF UTILITY PIPE
φ1000mm
750mm
Because space is narrow, location of grouting
hole will be just above the pipe.
φ3500mm
Sludge Pit
(>250m3)
Panoramic View of Opera House Station Job Site
Under Working Platform Sludge Pit during Construction Sludge Pit after Sedimentation
27
CASE-2
Project Name : Ho Chi Minh Metro line 1
Location Ho Chi Minh city – Viet Nam
:
Project Owner : MAUR
Main Contractor : SMJO (Shimizu-Maeda Joint Operation)
Soil Improvement for TBM break out (Launching
Improvement Purpose : Shaft)
29
CASE-4
Embankment reinforcement work in KANZAKI river
Project Name :
(JYOSHIMAHASHI JYORYU UGAN H26-15)
Location Osaka Japan
:
Project Owner : Osaka prefecture
Main Contractor : ASANUMA GUMI
Improvement Purpose : Soil strengthening
30
CASE-5
Embankment reinforcement work in KANZAKI
Project Name : river
(KANZAKI OHASHI JYORYU SAGAN H26-6)
Location Osaka Japan
:
Project Owner : Osaka prefecture
Main Contractor : TOKYU KENSETSU
Improvement Purpose : Soil strengthening
31
CASE-6
Embankment reinforcement work in KANZAKI
Project Name : river
(SENHOKUHASHI JYOKARYU UGAN H26-4)
Location Osaka Japan
:
Project Owner : Osaka prefecture
Main Contractor : NIHON KOKUDO KAIHATSU
Improvement Purpose : Soil strengthening
32
CASE-7
Project Name : Embankment seismic reinforcement work in TSURUMI CHUO NITYOUME
Location : Yokohama Kanagawa Japan
Project Owner : Japan Land and Transportation Ministry
Main Contractor : RINKAI NISSAN KENSETSU
Improvement Purpose : Soil strengthening
33
CASE-8
Embankment seismic reinforcement work in
Project Name : TSURUMI CHUO NITYOUME
Location Miyagi Japan
:
Project Owner : Miyagi Prefecture
Main Contractor : MARUMOTO GUMI
Improvement Purpose : Soil strengthening
34
DIRECTIONAL SOIL IMPROVEMENT TECHNOLOGY -
CHEMICAL GROUTING
Main purpose of chemical grouting is to reduce permeability of ground
CHEMICAL GROUTING
Machineries
High mobility machineries, which are very small and can arrange on truck suitable for short-period
and narrow site
This technology is apply at Ho Chi Minh Water Environment Project – Phase 2 - Package G for the
improvement work at launching/receiving shaft