Rehabilitation of Drainage System of Cau Sop Pumping Station
Rehabilitation of Drainage System of Cau Sop Pumping Station
MEET THE
A
VU QUOC HUNG
CONTENT
01 Background of Cong Sao pumping station
03 Design construction
04 Economic efficiency
01
BACKGROUND
01
www.zacomic.com
CALCULATION
OF
METOROLOGY
AND
HYDROLOGY
“The best company is our company”
Station selection Designed frequency Period calculation
Hai Duong station P = 10% 5 days maximum
Hai Duong meteorological Construction works of Having high overlap times
station near the study area grade III works The difference between 5
Having full data of rainfall in
(according to QCVN days maximum and 7 days
recent 29 years (1990-2019) 04-05:2012/BNNPTNT) maximum is small.
Having necessary data for Having highest appearance
planning improvement frequency.
Using
software
FFC 2008
to draw the
frequency
curve
From the frequency curve, Xp=10% = 320.78mm
02
Calculation of hydrological
www.zacomic.com
Total
Time 28/8HYDROLOGY
SURFACE WATER 29/8 30/8 31/8 1/9 precipitation
(mm)
XTP 5 192.2 114.8 13.2 0.5 325.7
KP 0.985
XP 4.9
“The best company is our company”
189.3 113.1 13.0 0.5 320.8
02
Drainage coefficient
www.zacomic.com
qi =
(l/s/ha) with c is flow coefficient of each area.
Drainage coefficient qi == qri. α r + qci . α c + qli . α l + qoi . α o
“The best company is our company”
Type of area Paddy rice Crops Lake Other Total
Percentage 61.7 18.1 6.0 14.2 100
qr qc ql qo qi
Date
(l/s-ha) (l/s-ha) (l/s-ha) (l/s-ha) (l/s-ha)
Drainage 28/09 0.00 0.06 0.01 0.08 0.15
coefficien 29/09
30/09
4.31
9.95
2.38
1.42
0.26
0.16
2.96
1.77
9.91
13.30
t 31/09
01/10
4.57 0.16
0.01
0.02
0.00
0.2
0.01
4.96
1.18
1.17
02/10 0.31 0.00 0.00 0.00 0.31
03/10 0.05 0.00 0.00 0.00 0.05
02 www.zacomic.com
D r a in a g e c o e ffic ie n t (l/s -h a )
D r a in a g e c o e ffic ie n t (l/s -h a )
Drainage coefficient
DESIGN
CONSTRUCTION
“The best company is our company”
03
www.zacomic.com
Trapezoid canal
DESIGN CONSTRUCTION
𝐝𝐞𝐬𝐢𝐠𝐧
𝐙 = 𝐀 𝟎 − 𝐡𝟎 − ∑ 𝐢𝐢 𝐥𝐢 − ∑ 𝛗𝐢
𝐬𝐮𝐜𝐭𝐢𝐨𝐧𝐭𝐚𝐧𝐤
Determine elevation of channel’s bottom
Z =–hdesign
channel’s bottom
Determine the lowest water level in suction tank
= Z channel’s bottom + hmin
Determine water levels in discharge tank
Determine the design discharge tank water level
= + + hloss
Determine maximum water level of discharge tank
= + + hloss
Calculation of
water columns
of pumping
Determine the designed water column Hdesign
H
stations
design = +
Z min= 0.46
“The best company is our company” Zmin = 2.39 Hmin = 1.93 Qmin = 5.78
Choosing 8 pumps
Choosing
22
(m3/h)
HTD8000-4 of Hai
)
Duong Pump
type of
Manufacturing Joint
Stock Company pumps
Type of Q H (m) N Nmotor Dsuction Ddischarge
pump (m3/h) (r/min) (kW) (m) (m)