Infra Water QMS PPR Aug 2019
Infra Water QMS PPR Aug 2019
Infra Water QMS PPR Aug 2019
QMS PPR
BU – INFRA-WATER
AUG 2019
2
Index
Index
1 Status of Last PPR
2 Concrete Production
3 Standard Deviation
4 Customer Appreciation Latter
5 Customer Feedback Report
6 Best Practice
7 Internal Audit NCR Analysis
8 Customer Complain Analysis
9 Hydraulic Testing Status
10 Rework Cost
11 Training Reports
12 Internal Observation
3
QMS MIS Report
STATUS OF LAST PPR FTM AUG 19
Sl. No Function Previous Discussion Point Action Taken Remarks
Design mix to be followed at all locations and Design mix Implementation happening at
box arrangement / weigh batcher to be site.
QMS
5 ensured as per availability for proper batching
of concrete.
Highlighting issues with manhole covers in Work is stop at site due to fund issue.
NRDA. Shear key missing in some structures.
6 QMS Defect to be corrected and Performance of Site
QA/QC to be reviewed.
4
QMS MIS Report
CONCRETE PRODUCTION
140 131.14
122.04 Infra Water Concrete Production Aug 2019
120
100 89.58 87.66
80
60
40
20 10.5
0 0 0
0
MKWS KWSP BWSP MBWS MAIP MUIP MJIP NRDA
1
0.9 Assumed Standard Deviation value as
0.8 per IS 456 Clause No 9.2.4.2
0.7
0.6
0.5 MKWS
0.4 M10 to M15 3.5N/mm2
0.3
0.2
0.1 M20 to M25 4.0N/mm2
0
M-15 M-20 M-25 M-30 M-35 M-40 M-45 M-50 M-55 M-60 KWSP
BWSP
Concerns
6
QMS MIS Report
Quality Rating
100.00
Quality Rating Infra Water Aug 2019 90.00 90.00 90.00
90.00 85.00 85.00 85.00 85.00 85.00
Site Overall Rating Product Rating 80.00 77.00
80.00 80.00
75.00
BWSP 70.00 68.00 70.00 68.00
68.00
50.00
MKWS 75.00 77.00
40.00
KWSP 85.00 90.00
30.00
MBWS 86.00 89.00 20.00
100.00
Quality Rating INFRA Water
80.00
INFRA Overall Rating Product Rating 60.00
20.00
FY 18-19-Q3 76.42 85.62
0.00
FY 18-19-Q2 FY 18-19-Q3 FY 18-19-Q4 FY 19-20-Q1
FY 18-19-Q4 86.77 89.15
Quality Rating INFRA Water Overall Rating Quality Rating INFRA Water Product Rating
FY 19-20-Q1 79.22 80.33
2019 (H1) 3
Average of
MKW Water for
Criteria BWSP NRDA MUIP MAIP MJIP KWSP MBWS 2019 H1 2
S
1
0
Resource mobilization, 4 5 3 3 5 4 4 5 4 ). es ng T
(timely deployment of plants wer vic pi EN
r e SM
& machinery, shuttering po /S
e ke SE
an t use S
m c A
material & manpower).
l & o du Ho LL
ia r A
Quality of Resources er P R
4 5 3 4 4 4 4 4 4 at of VE
deployed y O
Axis Title gm lit
r in Q ua
tte
shu
Adherence with stipulated 3 4 3 3 4 2 3 4 3 y,
ner
time schedule hi
(Achieving mile stones, etc.) ac
m
&
n ts
a
Quality of Product / Services 4 4 3 4 4 4 4 4 4 f pl
to
Team Work 4 5 3 5 4 4 4 5 4 en
ym
4 5 3 5 4 4 4 4 4 plo
EHS Practices de
Housekeeping 4 4 2 5 4 4 4 4 4 ely
m
, (ti
Response time of Project 4 5 3 4 5 4 4 4 4 tion
team a
liz
o bi
Overall Customer 4 5 3 4 4 4 4 4 4 m
e
Satisfaction u rc
so
OVER ALL ASSESMENT VG EXEC G VG VG VG VG VG 4 Re
35 14.00
30
12.00
25
20
10.00
10.00
15
10
Axis Title 8.00
0 6.00
g n n R R R
on tin tio on tio NC NC NC
iv si a a ati c L 5.00 5.00
5.00
ro up
d m rv A EN ED AL
or se ve OP OS
p d nf e cti L ER
ice ga
n
ed
I
-P
r
rr
e C OV
erv n nt .4 o 4.00
s ati e 5 C
d re um 8. &
an - C c ity 3.00
n o m
tio 5.
2 fd nfi
r
duc 7. olo co
o r 2.00
f pr ont on 2.00
C -N
lo 3- .2
ntro .5. 10 1.00
o 7
1 -C
5. 0.00
0.00
0.00 0.00
0.00
0.00 0.00 0.00
0.00
0.00 0.00
0.00
0.00 0.00
0.00
0.00
8. 0.00
BWSP NRDA MKWS KWSP MBWS MUIP MAIP MJIP
1) One drain slab precast found in
NRDA cracked conditions at RD19-15 Jn. From 27 &28/9/2019
SEC-16.
QMS MIS Report
11
Internal Audit NCR
Open Complaints 7
Since Previous 0 0 0 0 0 0 0 0 0 6 6
Month 6
5
Total Complaints 4
Issued in Current 7 0 0 6 0 0 0 0 13
Month 3
2
1
1
Complaints Closed
in current month 7 0 0 6 0 0 0 0 13
0
Critical Non Critical (blank)
Balance Open 0 0 0 0 0 0 0 0 0
Complaints
53.85%
60.00%
50.00%
40.00%
30.00%
20.00%
7.69%
7.69%
7.69%
7.69%
7.69%
7.69%
10.00%
0.00%
0.00%
NIL
15
QMS MIS Report
REWORK COST
NIL
16
QMS MIS Report
Quality Walk & Training snaps @MJIP
17
QMS MIS Report
Training Function
Infra Water
Site No. of Avg.Trg.Time Total Man- Topics Covered Training - Total Man Hrs
Participants (Min) Hrs
*Training on Earth work& Masonary work,Training on 100
HDPE fit up & pipe line hydro testing &
MKWS 76 60 76 commissioning,Training on PQP,QMS,RFI&IMIR.Training on 93.00
Quality control tests & method statement & ITP,Training 90
about Reinf , shuttering & concrete works.
**Method statement and ITP
*Earthwork and Masonary work 80
KWSP 35 80 35.00
*DI pipe fit up Inspection procedure 76.00
*DI pipe hydro testing and commisioning
*QMS *Reinforcement works *DI Pipe fit up*Pipeline 70
BWSP 35 40 24.00
Hydro-Testing
Reinforcement, shuttering & concrete work,Reinforcement,
MBWS 54 40 36 shuttering & concrete work,Quality control tests & Road 60
restoration work and tests.
RFI & IMIR,Quality Control Test,Reinforcement Concrete &
Shuttering.Quality Control Test (Aggregate,Soil & 50
MAIP 38 78 13 Cement),Rshuttering & Control Works,Brick & Massonary
Work,PQP & QMS,MOS &ITP,HDPE & DI Pipe Fit up &
Laying Procedure & Pipe Line Hydrotest Procedure.
40 36.00
35.00
MUIP 0 0 0
30
24.00
(1) Quality control tests (2) PQP & QMS (3)Quality control
tests-Aggregate,Cement & Sand (4) RFI & IMIR (5) MS Pipe 20
MJIP 186 30.00 93.00 Laying - Visual , Fitup , Ultrasonic test (6) Method
Statement of Pipe Laying (7) MS Pipe fabrication , Fitup, 13.00
Welding procedure, NDT Test, Hydro Test
10
NRDA
0.00 0.00
Total 424 277 0
MKWS KWSP BWSP MBWS MAIP MJIP NRDA MUIP
INSPECTION AT PIPE FABRICATION YARD- NVDA Representatives witness the hydro testing of MS
pipe at fabrication yard Bagh
21
QMS MIS Report
Soil Compaction Test @MJIP
22
QMS MIS Report
Motivation Program:
The Certificate and Award has been presented the best performer from KWSP:
Quality Meeting conducted in our KWSP Site:
At Borigumma Office
Quality Walk & Training snaps in WTP Area’s:
At WTP
Good Pratcices -Curing & Starter using snaps:
WTP Office SB
Building Nuagam
ESR
Curing Snaps:
SB Nuagam ESR
WTP/Office Building
Snap
Good practices Snaps:
Dengapadar ESR Column’s
Murthahandi ESR Raft
Shuttering
Shuttering
Cube’s & Slump Taken Snaps:
WTP/BW
Raft
casting
WTP/Office
Building Raft
casting
DOC Marking snaps in Structures:
Reinforcement Bars Cement Wash Snaps:
WTP/MBR
Reinforcement Katharagada ESR
DI pipe’s laying trenching depth Lubricant checking snaps:
Sargiguda Area
SB
Nuagam
Area
SB
Nua
gam
area
DI Pipes Shuttering materilas Storage snaps at Borigumma
Store@KWSP
Best Photograph/Good Initiative
1. Proper surface cleaning and Honeycomb rectification done at 2. Surface cleaning and painting work of Janmohammadpur ESR.
Moltola IPS Roof slab.
36
QMS MIS Report
JMC Projects (India) Limited QMS - MIS
37
QMS MIS Report
JMC Projects (India) Limited QMS - MIS
Before After
42
QMS MIS Report
JMC Projects (India) Limited QMS – MIS (MKWS)
Before After
43
QMS MIS Report
SITE OBSERVATION - NRDA
Reinforcement kept on floor @Floor @intake. Cement bags kept in store found in lumps condition.
45
QMS MIS Report
SITE OBSERVATION - MBWS
Surface cleaning of Conical wall fo bakharpur MS piped/ Structural steel at all Project locations like IPS,
ESR should done before painting work.. WTP etc. need to be painted on Priority. 48
.QMS MIS Report
SITE OBSERVATION - BWSP
Stacking of Steel/ISMB/MS Pipe/Valves etc. need to MS pipe should dispatch from yard to site after
rectify at store yard. Warping, Coating.
Approach Bridge beam found bulged & must be repair as PHE area plinth beam finishing must be done properly
per procedure @MKWS. @MKWS.
QMS MIS Report
50
JMC Projects (India) Limited QMS - MIS
47 bags of cement are found in hardened conditions at Maximum dumped Coarse aggregates are found in
Katharagada ESR location due to improper stacking, which irregular shape & Size, Oversize, Flaky & Elongated type. -
had already suppiled to sub-contractor. Aggregates already rejected.
52
QMS MIS Report
SITE OBSERVATION - KWSP
Improper stacking of rubber gasket at Borigumma Store- Some Reinforcement bars were going to be rusted due to
Already stored in a suitable place. monsoon & improper stacking- Already done for cement
wash..
53
QMS MIS Report
SUPPORT REQUIRED FROM SITE