DUG

Integration

Prepared by:
Khalil

Khalil Al-Alami 1 DUG integration


Before you start be sure to have:
1. Laptop with OMT-50S or newer.
2. USB to serial cable.
3. Consel Cable (RPM 919 732)
4. CF flash card reader
5. DUG required software
6. IDB file, configuration parameters
(from site, design sheet, and
call the Back office guy):
 Number of DUG’s in the site.
 Number of and which sectors on eech DUG.
 RU config. (no. Of TRX for each sector).
 DBB and TEI.
 Number of E1’s in the site.
 External Alarms to be defined.

Khalil Al-Alami 2 DUG integration


Connection Cable
Connect the Consel Cable to LMT A of the DUG

Console cable

Khalil Al-Alami 3 DUG integration


Creating IDB
 Creating IDB by using Wizard on OMT.

Khalil Al-Alami 4 DUG integration


Creating IDB
 OMT Window

Khalil Al-Alami 5 DUG integration


Creating IDB
 In the Configuration menu , click Create IDB (This opens up the Create IDB window).

Khalil Al-Alami 6 DUG integration


Creating IDB Defining Cabinet Setup
 Click New to open the Define Setup for Cabinet Window.

Khalil Al-Alami 7 DUG integration


Creating IDB Defining Cabinet Setup
 In the Cabinet Type box, select the cabinet type.

Khalil Al-Alami 8 DUG integration


Creating IDB Defining Cabinet Setup
 In the Cabinet Type box, select the cabinet type. (eg. 6101)

Khalil Al-Alami 9 DUG integration


Creating IDB Defining Cabinet Setup

Khalil Al-Alami 10 DUG integration


Creating IDB Defining Antenna Sector Setup
 Click New to open the Antenna Systems for Sector window.

Khalil Al-Alami 11 DUG integration


Creating IDB Defining Antenna Sector Setup
 Seclect number of sectors in the site. (eg. 3 sectors)

Khalil Al-Alami 12 DUG integration


Creating IDB Defining Antenna Sector Setup

Khalil Al-Alami 13 DUG integration


Creating IDB Defining Antenna Sector Setup

Khalil Al-Alami 14 DUG integration


Creating IDB Defining Antenna Sector Setup
 Choose the GSM Band (here B8 (900)).

Khalil Al-Alami 15 DUG integration


Creating IDB Defining Antenna Sector Setup

Khalil Al-Alami 16 DUG integration


Creating IDB Defining Antenna Sector Setup
 Click RE setup.

Khalil Al-Alami 17 DUG integration


Creating IDB Defining Antenna Sector Setup
 Choose the Radio equipment Model.

Khalil Al-Alami 18 DUG integration


Creating IDB Defining Antenna Sector Setup
 RUS Knowledge.

The RUS is certified for 60 W. The default output power


without license keys is 20 W. License keys are used to
set the output power to 40 W or 60 W. The RUS has the
following functions: • Transceiving Receiving Processing
(TRP) • Uplink and downlink filtering • Power Amplifier
(PA) functions • Up to four carriers downlink and uplink
with 2-RX diversity

Khalil Al-Alami 19 DUG integration


Creating IDB Defining Antenna Sector Setup
 Choose the Radio equipment Model. (eg. RUS 02)

Khalil Al-Alami 20 DUG integration


Creating IDB Defining Antenna Sector Setup

Khalil Al-Alami 21 DUG integration


Creating IDB Defining Antenna Sector Setup

Khalil Al-Alami 22 DUG integration


Creating IDB Defining Antenna Sector Setup
 Multi Carrier Transceiver (MCTR) configuration
 Define the Number of TRXs per MCTR ( eg. 4/4/4)

Khalil Al-Alami 23 DUG integration


Creating IDB Defining Antenna Sector Setup
 Click OK.

Khalil Al-Alami 24 DUG integration


Creating IDB Defining Antenna Sector Setup
 Click OK.

Khalil Al-Alami 25 DUG integration


Creating IDB
 Defining DBB. (eg. DBB 10 01)

Khalil Al-Alami 26 DUG integration


Creating IDB
 Click OK.

Khalil Al-Alami 27 DUG integration


Creating IDB
 Tick ”Run RBS configuration Wizard”

Khalil Al-Alami 28 DUG integration


Creating IDB
 Click OK.

Khalil Al-Alami 29 DUG integration


Creating IDB
 Click Yes.

Khalil Al-Alami 30 DUG integration


Creating IDB

Khalil Al-Alami 31 DUG integration


Creating IDB
 Tick ”All Parameters”

Khalil Al-Alami 32 DUG integration


Creating IDB

Khalil Al-Alami 33 DUG integration


Creating IDB
 For each HW Unit, select the desired shelf and slot. As according the actual installation.

Khalil Al-Alami 34 DUG integration


Creating IDB

Khalil Al-Alami 35 DUG integration


Creating IDB

Khalil Al-Alami 36 DUG integration


Creating IDB

Khalil Al-Alami 37 DUG integration


Creating IDB
 Defining Node Parameter: here in our case DUG-1 will control the RBS system so set this to true in DUG-1
as below and all other DU’s will be set to false

Khalil Al-Alami 38 DUG integration


Creating IDB
 Defining Node Parameter: DUG-2 will be set to false.

Khalil Al-Alami 39 DUG integration


Creating IDB
 Defining Node Parameter: In DUW will be set to false. (in the Element manager)

Khalil Al-Alami 40 DUG integration


Creating IDB Defining Node Parameter
 Add the External nodes

Khalil Al-Alami 41 DUG integration


Creating IDB Defining Node Parameter
 Add the External nodes

Khalil Al-Alami 42 DUG integration


Creating IDB Defining Node Parameter
 Add the External nodes

Khalil Al-Alami 43 DUG integration


Creating IDB
 SHU ports setting.

Khalil Al-Alami 44 DUG integration


Creating IDB
 SHU Knowledge.

Khalil Al-Alami 45 DUG integration


Creating IDB
 Leave this and Click OK

Khalil Al-Alami 46 DUG integration


Creating IDB
 Click OK

Khalil Al-Alami 47 DUG integration


Creating IDB
 Click Cancel

Khalil Al-Alami 48 DUG integration


Creating IDB
 Click OK for all ” Define Loss for FEEED_RXB 0” windows

Khalil Al-Alami 49 DUG integration


Creating IDB
 Click OK for all ”Define Delay for FEEED_RXB 0” windows

Khalil Al-Alami 50 DUG integration


Creating IDB Defining Transmission
 This config for alone DUG case, or for the seconde DUG in case of multi DUG and cascade E1 topology.

Khalil Al-Alami 51 DUG integration


Creating IDB Defining Transmission

 This config for the 1st DUG in case of Dual DUG , two E1, and cascade E1 topology.

Khalil Al-Alami 52 DUG integration


Creating IDB Defining Transmission

 Case of Dual DUG , two E1, and cascade E1 topology. Signal Cable (RPM 513 1104)

 The needed Signal Cables

ESB Signal Cable


(RPM 777 296)

Terminator ESB

Khalil Al-Alami 53 DUG integration


Creating IDB Defining TEI

 For DUG-1 TEI=62

Khalil Al-Alami 54 DUG integration


Creating IDB Defining TEI

 For DUG-2 TEI=61

Khalil Al-Alami 55 DUG integration


Creating IDB Defining External Alarms
 On SCU

Khalil Al-Alami 56 DUG integration


Creating IDB Defining External Alarms

Khalil Al-Alami 57 DUG integration


Creating IDB Defining External Alarms
 Click Apply when finish defining each alarm

Khalil Al-Alami 58 DUG integration


Creating IDB Defining External Alarms
 Alarm is created.

Khalil Al-Alami 59 DUG integration


Creating IDB Defining External Alarms
 Compleate for SAU

Khalil Al-Alami 60 DUG integration


Creating IDB Defining External Alarms
 Compleate for SAU

Khalil Al-Alami 61 DUG integration


Creating IDB Defining External Alarms
 Compleate for SAU : Door Alarm as an Example. Then click Apply

Khalil Al-Alami 62 DUG integration


Creating IDB Defining External Alarms
 Compleate for SAU : Door Alarm as an Example.

Khalil Al-Alami 63 DUG integration


Creating IDB Defining External Alarms
 Click OK

Khalil Al-Alami 64 DUG integration


Creating IDB Defining TF Compensation

Khalil Al-Alami 65 DUG integration


Creating IDB Defining TF Compensation

Khalil Al-Alami 66 DUG integration


Creating IDB Defining TF Compensation

Khalil Al-Alami 67 DUG integration


Creating IDB Defining TF Compensation
 Set the ESB delay value then click Apply

Khalil Al-Alami 68 DUG integration


Creating IDB Defining TF Compensation
 After apply the TF value changed automatically to –ve value, set it to 0 than chick OK

Khalil Al-Alami 69 DUG integration


Creating IDB Defining TF Compensation
 After apply the TF value changed automatically to –ve value, set it to 0 than chick OK

Khalil Al-Alami 70 DUG integration


Creating IDB Defining TF Compensation

Khalil Al-Alami 71 DUG integration


Creating IDB Defining Power Parameters

Khalil Al-Alami 72 DUG integration


Creating IDB Defining Power Parameters

Khalil Al-Alami 73 DUG integration


Creating IDB Defining Power Parameters

Khalil Al-Alami 74 DUG integration


Creating IDB Defining Power Parameters

Khalil Al-Alami 75 DUG integration


Creating IDB

Khalil Al-Alami 76 DUG integration


Creating IDB
 Here if you are already connected to the DUG and you want to install this created IDB direct to the DUG click
yes, else no.

Khalil Al-Alami 77 DUG integration


Creating IDB
 Before you save it is recomendded to define present RU’s.

Khalil Al-Alami 78 DUG integration


Creating IDB
 Before you save it is recomendded to define present RU’s.

Khalil Al-Alami 79 DUG integration


Creating IDB
 Before you save it is recomendded to define present RU’s.

Before Define After Define

Khalil Al-Alami 80 DUG integration


Creating IDB
 Save this created IDB on your storage to use it latter.

Khalil Al-Alami 81 DUG integration


Installing IDB

1. Physically
connect the OMT
to the RBS by
using the
console cable
and usb to serial
cable together.

Khalil Al-Alami 82 DUG integration


Installing IDB

2. Make sure from


OMT COM port
configuration. OMT
COM number must be
as COM of the USB to
serial that deserved in
you laptop.

Khalil Al-Alami 83 DUG integration


Installing IDB

Khalil Al-Alami 84 DUG integration


Installing IDB
 Before clicking the
”Install” icon/toolbar,
make sure that the
DUG is in
Maintenance Mode.
 Either press the
button on the DUG or
right click on ”GSM
Node” Box in OMT
then click Change
Maintenance mode.
 Make sure that the
Blue LED Lighting
 Click Install
 Note: Do not
touch the RBS when
any indicators are
flashing.

Khalil Al-Alami 85 DUG integration


Installing CF Flash
 Before you insert the CF flash inside the
DUG! you need to copy the required
Software to this flash from your Laptop.
 Use the Card reader to connect to the
Flash. Then do the copying.
 Note. You can load the pre created IDB
direct to this Flash as descibed in the
following slides.

Khalil Al-Alami 86 DUG integration


Loading the IDB to the Flash Card
 Load flash card

Khalil Al-Alami 87 DUG integration


Loading the IDB to the Flash Card
 Load flash card

Khalil Al-Alami 88 DUG integration


Loading the IDB to the Flash Card
 Choose where the IDB locatted and choose RBS software on the flash card then click on Load

Khalil Al-Alami 89 DUG integration


Compleate integration
1. Check all cables are connected and DUG ready for power on.
2. Power the DUG on and wait untile the Green LED ( ) is in steady or constant light.
3. Make sure that Maintenance LED ( )in DUG and RUS are off and not blue, if it’s
blue push and hold on maintenance button.
4. Make sure from the E1 connectivity.
5. Call Back Office to start integration.

DUG Optical Indicators

 Fault LED

 Operation LED

 Maintenance LED

 Status LED

Khalil Al-Alami 90 DUG integration


When the Back Office complete the integration
1. Open OMT and connect

Khalil Al-Alami 91 DUG integration


When the Back Office complete the integration
1. OMT now connected

Khalil Al-Alami 92 DUG integration


When the Back Office complete the integration
2. Click read to load the DUG configuration to your OMT

Khalil Al-Alami 93 DUG integration


When the Back Office complete the integration
1. Click Yes

Khalil Al-Alami 94 DUG integration


When the Back Office complete the integration
1. Check the Alarms: Right click on “Alarm Inlets” block as below then choose monitor.

Khalil Al-Alami 95 DUG integration


When the Back Office complete the integration
1. Check the Alarms: Right click on “Alarm Inlets” block as below then choose monitor.

Khalil Al-Alami 96 DUG integration


When the Back Office complete the integration
 Monitoring the Alarms.

Khalil Al-Alami 97 DUG integration


When the Back Office complete the integration
 Check the VSWR: on the RUS block right click and choose Monitor

Khalil Al-Alami 98 DUG integration


When the Back Office complete the integration
 Check the VSWR: on the RUS block right click and choose Monitor

Khalil Al-Alami 99 DUG integration


When the Back Office complete the integration
 VSWR monitoring

Khalil Al-Alami 100 DUG integration


IDB Modification
 Incase of any problem or for any reason you need to modify the
configuration, you need to load installed IDB from the DUG to your OMT
then after you finish each modification save it to the DUG.

 Connect you cable to the DUG and connect the OMT as explained before.

 Click on Read botton.

 Do modify the IDB.


 make sure that the DUG is in Maintenance Mode.

 Click on install.

Khalil Al-Alami 101 DUG integration


Khalil Al-Alami 102 DUG integration