 SUSPENSION OR TERMINATION

OF SERVICES
 The civil engineer is not responsible and which
make it practical or impossible for the civil
engineer to perform in whole or in part the
services in accordance with their agreement then
the civil engineer shall promptly notify the client
of the same.
 The client may suspend all or part of services or
terminate the agreement by written notice of not
less than 30 days to the civil engineer who shall
immediately make arrangements to stop the
services and minimize further expenditure.
 SETTLEMENT OF DISPUTES

 Then that party shall by notice in writing


served on the other party of the details of the
dispute and request that the dispute be
resolved conciliation.
 OWNERSHIP DATA, DESIGNS AND
DOCUMENTS

 The design analysis, drawings, specifications


and productions thereof are instruments of
services owned by the professional engineer
and shall be used only for the specific project
covered by the agreement between the client
and engineer.
 CIVIL ENGINEERING SERVICES

 Design, consultations and advice


 Feasibility studies
 Field investigation and engineering data collection
 Environmental assessment, impact statement or engineering
reports
 Opinions and probable construction cost
 Preliminary and final designs, drawings, specifications and
construction bidding documents
 Assistance in securing construction bids and in awarding
contracts
 Construction administration and observation
 Arrangements for or performance of testing of
materials and equipment
 Assistance in start-up assessment of capacity, and
operation of facilities
 Preparation of operation and maintenance of manuals
 Appraisals and rate studies
 Value engineering
 Expert testimony
 Assessment of risks
 Structural remediation or rehabilitation project
management and controls
 Provision of supplemental temporary staff
 Teaching