KALYAN- TALOJA METRO

CORRIDOR

EXTENSION OF LINE 5: THANE – BHIWANDI- KALYAN

T & C DIVISION, MMRDA METRO LINE -5 EXTENSION


Background

Metro Line 5 THANE -BHIWANDI –KALYAN : DPR


prepared and submitted for cabinet approval
High development in Kalyan – Taloja corridor
Growth centre proposed (27 villages) in greater
Kalyan area
Industrial area in Taloja

T & C DIVISION, MMRDA METRO LINE -5 EXTENSION


REGIONAL PLAN OF MUMBAI METROPOLITAON REGION

KALYAN

n
t io
Op d Op
27 VILLAGES

Opt. 3
2
e
SPA AREA

vis

t.
Re
1
t.
Op

NAINA
AREA vi-
mb
Mu pot
e
ai

Na tro d
M e

MMC Virar-Alibaug
Taloja
Railway
MIDC
station

TALOJA

Option 1 (Old)
Option 2 (Old)
Option 3 (Old)
Revised Option
MMC Virar-Alibaug

T & C DIVISION, MMRDA METRO LINE -5 EXTENSION


SANCTIONED DP OF 27 VILLAGES NOTOFIED AREA
Map showing the detailed land use plan of 27 Villages Notified Area and the proposed alignment of MMC and DFC

Airoli-Katai
Naka Road

Diva-Panvel Proposed
Rail way MMC

T & C DIVISION, MMRDA METRO LINE -5 EXTENSION


Need for Public Transport

Growth centre proposed (27 villages) in greater


Kalyan area
Limited public transport connectivity to proposed
Kalyan growth centre and Taloja
For successful development of growth centre public
transport connectivity is must

T & C DIVISION, MMRDA METRO LINE -5 EXTENSION


TALOJA KALYAN METRO CORRIDOR ALINGMENT OPTIONS

Line 5

KALYAN
Thane

Mulund
Airoli

TALOJA

Navi-Mumbai
International
Airport

LOCATION MAP
T & C DIVISION, MMRDA METRO LINE -5 EXTENSION
COMPREHENSIVE TRANSPORTATION STUDY OF MMR
Multi-Modal Corridor: - MMC is a 126 km long Virar-Alibuag Multi Modal Corridor will connect NH-8, Bhiwandi bypass, NH-3, NH-4 and NH-
4B, Mumbai-Pune Expressway, NH-17, etc. The Multi Modal Corridor will be a crucial step towards development, strengthening and creating job
opportunities in seven growth centers in MMR such as Virar, Bhiwandi, Kalyan, Dombivali, Panvel, Taloja and Panvel.

Major proposals considered for Taloja –Kalyan alignment Major proposals considered for Taloja –Kalyan alignment
1. PROPOSED MMC from VIRAR to ALIBAUG 1. PROPOSED SUBURBAN RAIL VASAI-DIVA-PANVEL
2. PROPOSED METRO FROM TALOJA TO KALYAN
T & C DIVISION, MMRDA METRO LINE -5 EXTENSION
CIDCO PROPOSALS IN NAVI – MUMBAI AREA
DETAIL OF ALIGNMENT AT
TALOJA STATION
Taloja

1. CIDCO proposed Metro alignment goes


through Khargar-Taloja MIDC-
Khandeshwar and further up to navi
mumbai airport

2. There is very limited rail based public


transport on the northern side of Taloja Taloja
towards Kalyan. Station
Line 1 details: Navi-Mumbai Metro
Phase Terminal Length
Belapur-Kharghar-Taloja-
I 11.10 km.
Pendhar
MIDC Taloja-Kalamboli–
II Khandeshwar-NMI Airport 10.30 km.
(proposed extension)
Interlink between Pendhar
III 2 .00 Km.
& MIDC
Total Tatoal Stations = 20 23.40 Km. NAINA map: some part of NAINA near to proposed Metro line
T & C DIVISION, MMRDA METRO LINE -5 EXTENSION
TALOJA-KALYAN METRO-ALIGNMENT OPTIONS

n
ya
Option 3: Narthan-Khoni

al
Option 1: NH4-Shilphata- Katai

i -K
nd
wa
naka- Dombivali MIDC Rd- gaon- Nevali phata-

hi
-B
ne

i
asa
ha
Kalyan Stn. Kalyan Stn.

:T

V
e5
lin

s
ard
d
se
o

w
op
OPTION -3 Details

To
Pr
OPTION -1 Details
Length 22.50 Km.
Length 23 .00km.
Road width of 24 m. from

n2
Road width of NH4 =60 M. major part Narthen gaon

tio
major part Katai-
to Khoni pada

Op
Naka
Shilphata- Mulund Airoli
Khoni-Pada
1

3
Kalyan=22 m n (As per CTS
tio

Option
Airoli-Katai
Naka Road p PALAVA study)
O PALAVA future
Proposed Rd:
Shil- expansion
Phata 100 m. from
Nevali phata
Option 2: Narthan-along with

Diva-Panvel Railway
to Kalyan
MMC- Growth centre-Kalyan

-4
NH
Narthan

Stn. Taloja
Gaon
Key Takeaways:
Station
OPTION -2 Details Ex pres
swa
y Vashi
The option-2 along with
nvel
- Pa
Length 22.20 Km. Sion MMC (100 m.)
Road Proposed
• Covers the major
MMC = 100 m
portion of proposed
Proposed DP
Belapur
Growth centre.
Rd= 45 m. Navi-Mumbai
• Road width is adequate.
International
Airport
(100 m. MMC and 45 m.
Panvel DP Road)
Railway
station

T & C DIVISION, MMRDA METRO LINE -5 EXTENSION


TALOJA-KALYAN METRO-ALIGNMENT OPTIONS

Airoli-Katai
Naka Road
Katai-
naka Nilje Hinterland area covered in
Junction
option 2;
1) Proposed Growth Centre in
km

Greater Kalyan area


2

Nilje 2) 27 villages notified area


Stn.
(Planned SPA area of MMRDA)
OPTION 1
3) Major junction of pipeline road
and MMC i.e. Nilje Junction OPTION 2
ph s
a
il- rd

(one road also proposed to be


at
Sh owa

Proposed
T

connected to Airoli by tunnel OPTION 3


Diva-Panvel
MMC and further to Mulund i.e.
Rail way Airoli –Katai naka tunnel )

SANCTIONED DP OF 27 VILLAGES NOTOFIED AREA


T & C DIVISION, MMRDA METRO LINE -5 EXTENSION
PRESENT STATUS
 In this regard, MMRDA conducted a joint site visit with DMRC, CIDCO and KDMC officials for finalization of
metro alignment for the said corridor on 22nd August 2017 (10.00AM –3.00PM) 

 In the site visit it was observed that existing population in the influence area of the said corridor is less so the
ridership will also be less.

 As per the KDMC Officials, the metro should cover the road adjacent to Dombivli MIDC because many people
working in MIDC, come from Panvel and other surrounding areas to Panvel.

 The 1st option of Metro alignment is proposed over the NH4 (from Shil-phata to Taloja). It was discussed that
getting clearances to execute a metro over a national highway will be difficult.

 The 2nd option of Metro alignment is proposed over the MMC (100 m. wide proposed corridor). (MMC also
has metro alignment). According to the CIDCO officials, the MMC metro system will be different from this
system and it would be difficult to run this only 2 to 3 km route of K-T metro from that MMC metro corridor.

 The 3rd option of Metro alignment is proposed over the Malang Road, which does not show any development
and the proposed growth centre and MIDC area are also far away from this route. So it was discussed that
this option will not be viable.

 In this context, it was decided to get detailed Proposed land use plans from CIDCO (NAINA Pocket), KDMC
(except 27 villages) and AKBSNA and revise the options which can satisfy to all the conditions.