Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 60

Wireless Network Guardian

Hand-held testing tool


Automatic output report
Manage terminals in the cloud
CONTENTS
WNG SHOW
• WNG UE Client
• WNG Cloud Server
• WNG Laptop Client
Functional verification
WNG UE client :VIVO X20 UE configuration
In VIL project , ZTE planned to do SCFT/Cluster /Statics test
by WNG tool. We are currently using VIVO X20 Handset for
test. It’s support all the frequency Band in India currently
available by VIL.
Here we are showing UE handset configuration & APK file
for WNL & WNG.
• WNL (Wireless NW listener )
• WNG (Wireless NW Guardian)

WNL: –It is interface b/w WNG APK(UE end) & WNG cloud
server to sync each other for command task , Upload log file ,
photograph.

WNG: – It is used for Drive test tool ,to recording data ,Task
selection & all functionality test & upload data to server by UE
only.
VIVO X20 UE WNL configuration

WNL – It is interface b/w WNG apk & WNG cloud server to sync both each other. Here we will upload photograph os site to cloud server.
Here we need to add Cloud server IP address to sync UE. And other end(Cloud server) also add UE to sync each other.
Cloud end UE will add by IMSI & Mobile no. More details will briefly later.
VIVO X20 UE WNG configuration

WNG – It’s software used to perform SCFT/ Statics /Cluster drive test .
Here different window available to check setting , perform task assignment & observation of drive test .
WNG configuration Summary Window:

Summary: Here we can check all the basic information of SCFT & site parameter i.g Lat long
Technology wise details RSRP,SINR, Tx power, RSCP, EcIo ,RX level, Rx qual SNR etc.. Also NW details
available like EARFCN, PCI,MCC ,MNC,PLMN..etc.
WNG configuration Map & Message

Map :– Here all the sites visible & live position of UE also, we can check our site location & parameter of
sites.
Message : Here we can check all the Event message , Signaling ,chart & Tab view as per UE status i.g Idle &
Dedicated mode (Same like TEMS Investigation layer messages).
WNG configuration Test

Test: – We are sending all task here, which we have to do in Drive test /Statics i.g ftpDL ,ftpUL, Call MO,
Call MT, Ping ,ATDT,SMS, Long call ,Short call, Idle .Http dl & Https ul etc .
We can edit any task by editor option i.g Add /delete /Modification .
Setting :-For example, FTP Download task select & check FTP DL setting . here we can modify it.
WNG configuration Test

Test: – Here also we are showing different task setting , I g Ping ,call & SMS. We can modify IP address,
Number ,time out , ping byte, times ,duration etc. We can modify setting here as per requirement.
WNG configuration Tool Setting

Tool: – Here WNG setting available ,which we are using Drive test to change Technology / frequency Band
& Idle test.
Business/Idle state: – We can change setting for Idle / business mode by select this option , when Business
state is enable (Green) means mobile data session is available .If Idle mode selected that time only mobile in
Idle state, data session will not work.
WNG configuration Tool setting

Lock Mode: WNG support technology wise lock mode option.


Lock Frequency: frequency lock Band option also available to lock particular /multiple band .
Above the screen showing GSM technology & Freq Band lock option.
WNG configuration Tool setting

Lock Mode: – WNG support technology wise as well as frequency Band wise lock mode option available.
Above the screen showing WCDMA & LTE technology Band lock option.
Lock R99: R99 can also test by WNG UE tool.
WNG configuration Tool setting

Clear Band: – Switch to clear all technology band lock & frequency .
Engineering Mode: Function to check Phone info status.
WNG configuration Tool setting

Station Photograph: – It is use to capture site Paranomic view, clutter picture , Tower ,building & Antenna
tilt photos for preparation automatically report .
Speed Test: Function to use speed test by WNG.
WNG configuration Tool setting

WNG setting : – Here we can change setting of Color ,Indoor /outdoor & data management window to
check log file size.
Drive Test Process: How to select Task

Task selection view: first Select file which we need to test , all test cases will assign by cloud server to
defined particular UE. As per technology wise drive test first lock technology by UE end.
Picture 2&3 shown:- Date wise folder automatically generated in WNG & inside the folder all task visible ,
which we have assigned to particular UE from cloud server..
Drive Test Process: How to select Task

Here Task selected JAI3483G short call name coming in WNG & you can check site in Map also.
Now go to Test & select task which we have planned for SCFT/Cluster/Statics. We can modify task also.
Log file & Task (Start/Stop) process:

Start Recording & Task process: First click button of Record log file then go to test window & start task .
Now log file recording start & do SCFT /Cluster/Statics test.
Stop Log file: After finish round of SCFT/statics /Cluster drive , Stop task first then go to stop recording
option. Now stop log file message displayed , please select Ok. Same scenario should be applicable for
other task .
How to Complete Task Process

After log file properly stop , log file saved in UE. Now we need to do complete task.
• Now click on 3dots option & new display will come, which have five option there. Please select task
complete option.
• Select File option will appear, please select date folder & task name. Now need to check task & click task
complete option. After Task complete message will display on WNG.
Log file/Photo upload Process

After task complete finished , Need to upload log file in Cloud server by WNG option.
Upload log file: Please select upload file option then log file upload processing will display on screen.
After uploaded file message will display ”Data upload to complete”.
Same process will follow for all the drive test round .
Upload photo: We can upload site photo from here to cloud server for report preparation.
Remove /Reset Task Process

Remove Task : If you want remove task please click here. The task automatically removed & show No task.

Reset Task : If any drive route or task have issue then we need to select this option to reset task, After
that “task & log file” both will be reset .And Previously log file replaced automatically.
WNG Cloud Server

Each partner have their own User name& password to access cloud for task & report Generation.
WNG Cloud Server

After Login WNG cloud server as above screen will come.


UE Manage “How to check status & manage UE in Cloud server”

There are 3 step: Status UE; Group Manage ; All UE list.


The WNG management platform manages all test UEs. Before performing UE management on the WNG
management platform, you need to register the test UE on the platform and allocate a number to this
UE Status view

Here we can check UE live status i.g Idle condition ,Test in progress, uploading data & offline etc .
Group Manage

Every one make their own group as per team size, to send easily Task to each handsets.
All UE: How to Add UE in WNG Cloud

There are two method to add UE in Cloud:


ADD UE
1.By Custom & 2 By Template
UE Add by Custom

In this method we are filling all details by manually ,then import one by one.
UE add by Template

Firstly Download template & fill all the excel column as per requirement then import file by chose file
ADD UE
selection.
Task Manage

The WNG management platform can create one task or task group and set it to UE. Test items include
ping \ short message \ call \ FTP download \ FTP upload \ Http Upload \ Http Download \ Video \ VoLTE \
Attach \ Detach \ IDLE test and so on
Map View

Here we can check live /Historical drive status & location of any UE in Google map, satellite
map, Baidu map & Normal Map support by WNG .
Business Intelligence: Site Table

For Report generation we need follow some steps.


1. Site Table 2. Template 3 Report 4 Collection
Business Intelligence (Site Table)

For Report generation we need follow some steps.


1. Site Table : Firstly download site table template for each technology & fill details as per
column ,after that upload these files. Site Info Template
UMTS
Business Intelligence : Template

For Report generation we need follow some steps.


Template : First Go to Template option & upload template file i.g file type .rtlx & .xml (file provide by WNG
expert (In that file report automatically generate script).
Put Template Name & Type (SSV or Cluster) and after that technology which we are uploading template.
Business Intelligence : Report

For Report generation we need follow some steps.


Report : Go to report & Generate report setting.
Business Intelligence : Report Generation

1. Report name: Please give report name so that report generate that name only.
2. Select Server: Don’t need to change server IP.
3. Generation method: Generate report at once.
4. Select template: Need to select which technology report output required (GSM/MTS/LTE).
Business Intelligence : Report Generation

Data source configuration: We need to select log file as per task name wise from cloud served by edit
option.
Output type: we are generation report in Excel & word both.
Confirm Generate option to process report.
Business Intelligence : Report Generation

Data source configuration: We need to select log file as per task name wise from cloud served by edit
option.
Import Log file : Please click add option to import log file from cloud server.
Business Intelligence : Report Generation

Data source configuration: We need to select log file as per task name wise from cloud served by edit
option.
Import Log file : Please click add option to import log file from cloud server.
Now choose data directory or file.
Business Intelligence : Report Generation

Now we have choose log file through cloud server by task name. Which log file DT Engg will upload after
SCFT done. We need to identify log file as per Task name & confirm .
Business Intelligence : Report Generation

Now we have select site table for site creation & basic information in report.
Parameter template list have select 100ms Bin sample size.
Finally confirm after all process.
Same process for all data source configuration scenario for all task.
Business Intelligence : Report Generation

Same process for all data source configuration scenario for all task.
Output Type : Report will be generate by Excel or word format.
Project Map source : Please select map format option to select map theme in report background.
And finally confirm generation report.
Business Intelligence : Report Generation

And finally confirm generation report.


Business Intelligence : Report Generation

After 100% process completion report will generate.


Now we can download report from here .
Test Template (Add/Delete/Modification)

Test template : We can add/delete & modify template as per requirement.


Single site Verify :Parameter Manage(Cell file)-1

Single site Verify manage all the technology parameter like cell file. We can upload all the technology
Engg parameter as given format & Import it. It is visible in WNG handset on map view.
WNG Project
parameter
Single site Verify :Parameter Manage(Cell file)-2

While Importing project parameter data & Error is coming then we need to check that particular row
& column number to identify problem.
WNG Project
parameter
Single site Verify :Parameter Manage(Cell file)-3

After Success Import parameter data project name generate as given window show.
WNG Project
parameter
How to Assign Task UE(1)

Go to single site verify then enter Load Project para .


Select Technology wise project name.
How to Assign Task UE-(2)

Test site – Search site ID where we are going for DT.


DT test – select test template to perform i.g. mobility test 2glong call, 4GPD DL , 3GUL..etc.
Same scenario for CQT test (Statics test) also & choose template as requirement.
How to Assign Task UE-3

Test UEs – Pleases select UE by IMSI number/by Name, where task send for perform.
Now Task Para configuration – Please put task name to identify log file name ,site wise & task wise.
Finally start task option & check in UE to receive or not.
WNG Laptop Client Confidential▲

WNG laptop client support layer3 \ layer2 signal analysis and event analysis.

© ZTE All rights reserved


52
WNG Laptop Client Confidential▲

© ZTE All rights reserved


53
CONTENTS
WNG SHOW
• WNG UE Client
• WNG Cloud Server
• WNG Laptop Client
Functional verification
WNG Laptop Client Confidential▲

© ZTE All rights reserved


55
WNG Function verification-CA Confidential▲

CA OFF CA ON

© ZTE All rights reserved


56
WNG Function verification-CA Confidential▲

WNG support carrier aggregation test.


Carrier ID 0 means main carriver;
Carrier ID 1 means second carriver;
EARFCN can show the freq info.

© ZTE All rights reserved


57
WNG Function verification--GSM & UMTS Confidential▲

2G KPI 3G KPI
MOC/MTC Voice MOC/MTC Voice
MOC/MTC SMS MOC/MTC SMS
HO from 1 Softer Handover - Intra NodeB HO
Intra BSC Handover (Inter site/cell) HO
Inter BSC Handover (if applciable) Soft HO - Inter NodeB HO
2G to 3G CELL RESELCTION IRAT Handover
2G to 4G CELL RESELCTION 2G to 3G CELL RESELCTION
2G to 2G CELL RESELCTION 3G to 4G CELL RESELCTION
3G to 2G CELL RESELCTION 4G to 3G CELL RESELCTION
4G to 2G CELL RESELCTION 3G to 2G CELL RESELCTION
Ping Test (32 Byte) (ms) 3G to 3G CELL RESELCTION
FTP upload PS Ping Test (32 Byte) (ms)
FTP upload PS (Average & Peak Inter RNC HO (wherever applicable)
Throughput) in Kbps FTP upload PS (Average & Peak Throughput) in Kbps
FTP download PS FTP download PS (Average & Peak Throughput) in Kbps
FTP download PS (Average & Peak FTP upload HS (Average & Peak Throughput) in Kbps
Throughput) in Kbps
FTP download HS (Average & Peak Throughput) in Kbps
Web browsing PS
Web browsing PS
Web browsing HS
Multi RAB Establishment Test

© ZTE All rights reserved


58
WNG Function verification--LTE Confidential▲

LTE LTE
MOC/MTC Voice LTE IRAT Handover for Data
Call Setup Time - VoLTE SRVCC to 2G/3G Handover
MOC/MTC Voice CSFB IRAT Handover Delay / Interuption Time (ms)
Call Setup Time (CSFB to WCDMA) 2G to 4G Cell Reselction
Call Setup Time (CSFB to GSM) 2G to 4G Cell Reselction Time (ms)
SMS MO Success Rate 3G to 4G Cell Reselction
SMS MT Success Rate 3G to 4G Cell Reselction Time (ms)
Attach Success Rate 4G to 3G Cell Reselction
Attach Delay (ms) 4G to 2G Cell Reselction
Detach Success Rate 4G to 4G Cell Reselction
Detach Delay (ms) Ping/Latency Test (ms) - 512 Bytes
Intra eNB Handover Jitter Test (ms)
Intra eNB Handover Delay / Interuption Time (ms) * FTP Download
Inter eNB Handover DL Average & Peak Throughput (Mbps)
Inter eNB Handover Delay / Interuption Time (ms) * FTP Upload
Inter Freq Handover UL Average & Peak Throughput (Mbps)
Inter Freq Handover Delay / Interuption Time (ms)

© ZTE All rights reserved


59
Thank you

You might also like