BACK GROUND OF ORREX CONSTRUCTION
VISION:-
MISSION
→ To perform effectively though efficient and professional performance
⇾ To play a leading role in the practice of engineering profession.
Hospitals
Residential complexes
Offices building and expansions
Schools
Health centers etc.
The main customer or users of the product
The following are it is main customer and user
General
Manager
General Forman
MY OVERALL INTERNSHIP EXPERIENCE
How I get the company
I applied to my internship question to Orrex construction plc on February
2,2009 E.C, the office allows to me to work JIGJIGA university student block
project, then I spend wonder full working time for the last four months.
My work tasks
The company have varies working section, for the better part of
internship program within the company, first I was taken in the site
work then I conduct with office work,
Site work
Under sub structure
Earth works
› Setting out
› Site clearance
› Pit excavation
›Trench excavation
› back fill &compaction
Office work ‐ Collect data from the site
‐Prepare take off sheet
‐Weekly and monthly report activities
CONTINOU ……..
PIT EXCAVATION
TRENCH EXCAVATION
Footing: - Footings are structural members used to support columns and
walls and to transmit and distribute their loads to the soil
Isolated footing: - The isolated footing under a column distributes the
column load horizontally to prevent excessive total and differential
settlement
Combined footing: - Footings that support two or more columns are
classified as combined footings.
ISOLATED FOOTING
COMPAINED FOOTING
Form work
Form work is a mold used to form concrete in to structural shapes (beams,
columns, slabs) for building
EXPANTION JOINT
Column casting
The Construction procedure is:
Column yokes (Cratury) are placed immediately before the slab
is casted, and helps to keep the column forms straight and strong.
Column forms are then placed in the yokes after preparing
column reinforcement is placed and this should erect straight &
supported very well
Finally, check before casting.
Beam casting
The construction procedure of beam
Props positioned as per the required spacing and leveled through.
Soffit placed, leveled and position checked.
Side forms placed after placing of re-bar, their position checked before
being fixed.
Strutting position and fixed.
Final check before casting
we poured the concrete.
Challenge I faced
Challenges during my intern program are listed below:-
Site language which is too unfamiliar to me and their
methodology of work.
Reputation of work.
Climate condition.
Occurrences of errors and missing data on a drawing.
Benefit I gained