BACK GROUND OF ORREX CONSTRUCTION

Its Brief history


AS it is known the there is problem that seen in Addis Ababa is the housing
problem. In order to solve the housing problem of the city and to see the city of Addis
Ababa
 the Addis Ababa administration was proposed Addis Ababa Government construction
and housing development office since 1996 E.C. But it started as a building
construction in 1997.
 they started affordable housing construction within ten sub city of Addis Ababa. from
these sub city Nefas silk lafto sub city governmental construction and housing
development office company was one of them.
 Company Police
 Throughout the construction process on every project we will be proactive and offer
quality work all projects are completed safely, within budget and to the best possible
standard.

VISION:-

Orrex construction vision is to constantly improve as a highly respected, world-class


construction company, with a strong identity which earns the devotion of its customers

MISSION
→ To perform effectively though efficient and professional performance
⇾ To play a leading role in the practice of engineering profession.

⇾ Providing quality service to the society and ensuring continuous improvement of the


company in all aspects.

The main products & services of company
The construction sector of this office has constructed,

Hospitals
Residential complexes
Offices building and expansions
Schools
Health centers etc.
 The main customer or users of the product
 The following are it is main customer and user

As it is a governmental office it has a lot of costumers and user

The community as a whole


Governmental organizations
Private sectors
Regional sector
Investors, etc.
 
Organization structure

General
Manager

Project manager Administrator


Manager and finance
Office Engineer sales
Department
Secretary
Site engineer
Driver

General Forman
MY OVERALL INTERNSHIP EXPERIENCE
 How I get the company
 I applied to my internship question to Orrex construction plc on February
2,2009 E.C, the office allows to me to work JIGJIGA university student block
project, then I spend wonder full working time for the last four months.
My work tasks
The company have varies working section, for the better part of
internship program within the company, first I was taken in the site
work then I conduct with office work,
Site work
Under sub structure
Earth works
› Setting out
› Site clearance
› Pit excavation
›Trench excavation
› back fill &compaction
Office work ‐ Collect data from the site
‐Prepare take off sheet
‐Weekly and monthly report activities
CONTINOU ……..

 Pit excavation: -Pit excavation an excavation of soil for isolated footing


including 25cm working space starting from basement floor level to the end
of foundation depth
 Back fill material: -Back fill is the processes of replacing un selected
material with selected material.
 Masonry work: - Masonry is consists of faced stone, crushed aggregate and
mortar.
 Hard-core: - 250mm thick basaltic stone hard core well rolled, consolidated
and blinded crashed stone, as for the rest of excavation Concrete work
 Concrete is material made up of four gradients such as cement, water, fine
and coarse aggregateReinforcement work
 Steel: steel is easily attack by corrosion so we have placed this material in
safe manner
 FOUNDATION: - foundation is part of the structure that supports the weight
of the structure and transmits all loads that comes from the superstructure
to underlying soil.
HARD CORE MASOREY WALL

PIT EXCAVATION
TRENCH EXCAVATION
Footing: - Footings are structural members used to support columns and
 
walls and to transmit and distribute their loads to the soil
Isolated footing: - The isolated footing under a column distributes the
column load horizontally to prevent excessive total and differential
settlement
Combined footing: - Footings that support two or more columns are
classified as combined footings.
ISOLATED FOOTING

COMPAINED FOOTING
 Form work
 Form work is a mold used to form concrete in to structural shapes (beams,
columns, slabs) for building

FORMWORK GRADE BEAM FORM WORK OF COLUMN

FORM WORK OF SLABE


 Expansion Joint
 An expansion joint shows in targeted to the building at intervals to allow for
expansions contraction by external factors creep, shrinkage

EXPANTION JOINT
Column casting
  The Construction procedure is:
  Column yokes (Cratury) are placed immediately before the slab
is casted, and helps to keep the column forms straight and strong.
Column forms are then placed in the yokes after preparing
column reinforcement is placed and this should erect straight &
supported very well
Finally, check before casting.
Beam casting
The construction procedure of beam
 Props positioned as per the required spacing and leveled through.
 Soffit placed, leveled and position checked.
 Side forms placed after placing of re-bar, their position checked before
being fixed.
 Strutting position and fixed.
 Final check before casting 
 we poured the concrete.
 Challenge I faced
   Challenges during my intern program are listed below:-
 Site language which is too unfamiliar to me and their
methodology of work.
 Reputation of work.
 Climate condition.
 Occurrences of errors and missing data on a drawing.
Benefit I gained

 I have gain the following many benefits from my intern ship


program it helps me to:-
Be ready for work.

Gain practical knowledge.

Competence on work and

Meet experienced engineers


Conclusion

Generally, I introduce many concepts in class but this


inter program create good opportunities to me to see
those concepts practically and also working with
skilled and experienced Forman’s gives me great
quality and made me confidential for work.
  recommendation
On construction safety
I recommend my intern company and construction contractors work in orrex to:-
• Open new office for emergency with its service only
• Use construction safety like helmet and etc.
• Give priority for safety before during any activities.
•Give organized information to their customers
•Give job opportunity
•Increase their social and economic connection
 

e n d