MUHAMMAD IKRAM HASSAN

18-CT-07

TOPIC
Report of design and construction of residential House
INSTRUCTURE
Engr. Usman Haider
Table of contant

 Introduction
 Building rules according
 Introduction of Organization
 Project quality management plan and safety and quality plan
 Method Statement for the execution of project
 Project profile
 Environment Safety and Management Plan Prior to Construction
 Contract document
 Scheduling
Introduction
 The basics requirements of human
existences are food, clothing’s &
shelter. From times ancient man
has been making efforts in
improving their standard of living.
 1Location
 The site is located at Plot 286,
Block E Punjab Government
Employees Cooperative Housing
Society Phase 2, Lahore,
Punjab, Pakistan
Building Rules According to LDA
Plot Size/Zone Max No. Max Ground Max Height Floor Area Ratio Minimum Parking
of Story Coverage (FAR) Provision
(excludin
g
basement
)

Less than 5- Marla 3 80% 38 feet 1:2.4 Not Mandatory

5 Marla & above but less than 10 3 75% 38 feet 1:2.3 1 Car Porch
Marla
10 Marla & Above but less than 1 4 70% 45 feet 1:2.8 1 Car Porch Per
Kanal Story
1 Kanal to 30 Marla 4 65% 45 feet 1:2.6 1 Car Porch Per
Story
Above 30 Marla’s but less than 2- 4 60% 45 feet 1:2.4 2 Car Porch Per
kanals Story

2-kanals & above 4 55% 45 feet 1:2.2 2 Car Porch Per


Story
Objective of projects

 Estimating the quantities of material required for building projects and ordering
these from building suppliers
 Arranging and managing subcontractors to work for every stage of construction
 Supervising subcontractor's work to ensure buildings are of an acceptable
standard quality and are progressing according to the schedule
 Responsibility about of the building work personally
 Resolved issues about construction quality and labor supply
 Disposing or recycling of construction waste
Environmental impact on society

 Development of infrastructure in society


 Better opportunities for investing in future
 Unused land convert into useable
 Contribution in development of society
Introduction of Organization

 IHB Builder and Designer Company (Private) Limited is a reputed


construction company of Pakistan. Formed in 1996 This has become
possible only with constant efforts of our staff and continuous
encouragement from our clients.
 IHB is registered with Pakistan Engineering Council as “C1” company.
Over the years IHB has technologically advanced specialization in the
following fields of construction:
 Head office at Chiniot Punjab pakistan
PROJECT SERVICES

 Project Office design, implementation and operation


 Project reporting and administration services
 Project guideline/manual development
 Planning and scheduling
 Cost estimation
 Re-measurement and certification
 Safety Agent function
Organization structure

Project Manager

Manger Senior site Electrical Mechanical Health and Safty Contract


Adminstration Engineer Engineer Engineer Engineer Engineer

Junior site Health and Safty Planning


Fore man Supervisour
engineer Supervisour Engineer
Procurement
officer

Construction Quantity
supervisour Surveyor
Account and
financr officer

Autocad
Surveryers
Operator

Mess and food


officer
Lab technicians
Project Quality Management Plan, Safety
and quality plan
 System And Procedure
 Approval Of System
 Competency Of Workforce
 Safety And Security Control Plan
 System And Procedure
 Approval Of System
 Competency Of Workforce
 Safety And Security Control Plan
 Fire Control
 Health & Safety
Method statement for the execution of
project
 Project Strategy
 Mobilization
 Engineering And Design
 Detail Survey Of Site
 Structural Works For Main Building Construction
 ( Methodology)
 Electrical Works
 Addressable Fire Alarm System
 Plumbing Works
 Architectural Work
PROJECT PROFILE
 Name Of Project
 Residential Building
 Client
 Rana Jameel
 Contractor
 Ihb Builder & Designer
 Cost Of The Project
 7.5 Million
 Duration Of Project
 7 Months
 Area Of Project
 450 Sq-ft
Project components
 Site Clearance
 Excavation
 Complete Structure Works
 Waterproofing Works
 Masonry Works
 Finishing Works Including Interior & Exterior Finishes For Floors, Walls, Ceiling And Wall
Partitions
 Steel, Wood & Aluminum Doors & Windows Frame, Leaves And Hardware.
 Metal Works
 Gas Works
 Electrical Equipment
 Kitchen Equipment
 Furnishing
 Front (Concrete Panels Cladding, Curtain Wall)
 External Works (Infrastructure Services, Landscapes)
Environment safety and management plan
prior to construction
 Clearing & Grubbing
 Tree Felling
 3drinking Water Resources
 Fuel For Domestic Use
 Environmental Requirement Plan
 7.5.5 Avoidance Of Social And Environmental Impacts Due To
Construction
 Damaging Infrastructure In The Surroundings Of The Project
 Minimize Negative Impacts On Aesthetics Of The Area
Contract conditions
Section 1. Scope
Section 2. Price And Payment
Section 3. Entire Agreement.
Section 4. Suspension Of Work.
Section 5. Inspection Of The Work
Section 6. Site Access And Rights Of Way.
Section 7. Reports And Surveys
Section 8. Permits, Licenses And Regulations
Section 9. Termination
Section 7. Reports And Surveys
Section 8. Permits, Licenses And Regulations
Section 9. Termination
Section 10. Arbitration
Section 11. Warranty
Scheduling