Muhammad Ikram Hassan
Muhammad Ikram Hassan
Muhammad Ikram Hassan
18-CT-07
TOPIC
Report of design and construction of residential House
INSTRUCTURE
Engr. Usman Haider
Table of contant
Introduction
Building rules according
Introduction of Organization
Project quality management plan and safety and quality plan
Method Statement for the execution of project
Project profile
Environment Safety and Management Plan Prior to Construction
Contract document
Scheduling
Introduction
The basics requirements of human
existences are food, clothing’s &
shelter. From times ancient man
has been making efforts in
improving their standard of living.
1Location
The site is located at Plot 286,
Block E Punjab Government
Employees Cooperative Housing
Society Phase 2, Lahore,
Punjab, Pakistan
Building Rules According to LDA
Plot Size/Zone Max No. Max Ground Max Height Floor Area Ratio Minimum Parking
of Story Coverage (FAR) Provision
(excludin
g
basement
)
5 Marla & above but less than 10 3 75% 38 feet 1:2.3 1 Car Porch
Marla
10 Marla & Above but less than 1 4 70% 45 feet 1:2.8 1 Car Porch Per
Kanal Story
1 Kanal to 30 Marla 4 65% 45 feet 1:2.6 1 Car Porch Per
Story
Above 30 Marla’s but less than 2- 4 60% 45 feet 1:2.4 2 Car Porch Per
kanals Story
Estimating the quantities of material required for building projects and ordering
these from building suppliers
Arranging and managing subcontractors to work for every stage of construction
Supervising subcontractor's work to ensure buildings are of an acceptable
standard quality and are progressing according to the schedule
Responsibility about of the building work personally
Resolved issues about construction quality and labor supply
Disposing or recycling of construction waste
Environmental impact on society
Project Manager
Construction Quantity
supervisour Surveyor
Account and
financr officer
Autocad
Surveryers
Operator