PT PASN - Asahan 3
PT PASN - Asahan 3
PT PASN - Asahan 3
Underground
Powerhouse
HT Surgetank
Headrace Channel
1.4km
Headpond and Spillway
Headrace Tunnel 8 km
Base camp
Intake Weir
Intake Weir:
Gated Concrete Weir, 176m L x 15m H
4 Sluiceway (with steel gates)
2 Scouring Sluiceway (with steel gates)
Headrace Conduit:
Double Box Culvert, 5.0m W x 6.0~6.2m W x 521m L
Headrace Channel:
Open RC Flume, 9.0m W x 6.2~6.4m H x 1,144m L
Head Pond:
Double Lanes, 32 m W x 116 m L
Headrace Tunnel :
Circular Concrete-lined Pressure, 6.6m D x 7,794m L
Scope of Works (2/2)