BENDUNGAN ASAHAN 3

General Layout of the Project


Tailrace Surge Tank and
Tailrace Tunnel 500m

Underground
Powerhouse
HT Surgetank
Headrace Channel  
1.4km
Headpond and Spillway
Headrace Tunnel 8 km

Base camp
Intake Weir

INALUM Asahan River


Tangga PS

150 kV T/L to Simangkuk 30 km


Access Road and Bridges
Scope of Works (1/2)

 Intake Weir:
 Gated Concrete Weir, 176m L x 15m H
 4 Sluiceway (with steel gates)
 2 Scouring Sluiceway (with steel gates)
 Headrace Conduit:
 Double Box Culvert, 5.0m W x 6.0~6.2m W x 521m L
 Headrace Channel:
 Open RC Flume, 9.0m W x 6.2~6.4m H x 1,144m L
 Head Pond:
 Double Lanes, 32 m W x 116 m L
 Headrace Tunnel :
 Circular Concrete-lined Pressure, 6.6m D x 7,794m L
Scope of Works (2/2)

 Headrace Surge Tank:


 Restricted orifice, 14m D x 52.9m H with 2.62m port
 Penstock Tunnel:
 Vertical shaft (with steel liner), 6.6~3.3m D x 299m L
 Powerhouse:
 Underground, 22m W x 38m H x 107m L
 Access Tunnel:
 D-shape un-lined tunnel, 7.0m W x 6.6m H x 357m L
 Tailrace Surge Tank:
 Simple type w/ elliptic section, 19.6m L x 10.4m W x 38.6m H
 Tailrace Tunnel:
 Circular concrete-lined pressure, 6.6m D x 467m L