Professional Documents
Culture Documents
Amaravathi Bye Laws
Amaravathi Bye Laws
ORTHOPEDICS
IPHS
Based on the assumptions of the annual rate of admission as 1 per 50 populations and
average length of stay in a hospital as 5 days, The number of beds required for a sub district
having a population of 5 lakh will be around 100-150 beds.
Grade 1 :Sub district hospitals norms for 100 beds or more
Grade 2 : Sub division hospitals norms for 50 beds not exceeding 100 beds
The minimum functional grade of the two different grades of sub-district hospitals requiring
the physical infrastructure, Manpower, Diagnostic and investigation facilities, equipment
norms, drugs and other supportive services etc; have been given.
FLOOR HEIGHT
The room height should not be less than approximately 3.6 m measured at any point from
floor to floor to floor height
ENTERANCE
PHYSICAL FACILITIES
AMBULATORY CARE
WAITING SPACES
Registration , assistance and enquiry counter, facility be made available in all clinics
Main entrances, general waiting and subsidary , waiting spaces are required adjacent to each
consultation and treatment room in all the clinics.