Professional Documents
Culture Documents
Supplier Performance Measurement Training Material: Nordin Mimouni - Supplier Quality Manager Rev. 1 - February 22 2019
Supplier Performance Measurement Training Material: Nordin Mimouni - Supplier Quality Manager Rev. 1 - February 22 2019
Training Material
Nordin Mimouni – Supplier Quality Manager
Rev. 1 – February 22nd 2019
1. ACRONYMS
2. NORTH AMERICA
a. QUANTITY RELIABILITY RULES
b. DATE RELIABILITY RULES
c. AGGREGATION RULES FOR 2
MULTIPLE GRs PER SL
d. QUALITY CONFORMANCE
CALCULATION
Table
e. CLAIMS CALCULATION
3. ASIA
a. QUANTITY RELIABILITY RULES
SA = Scheduling Agreement
GR = Goods Receipt
DD = Delivery Date
SDD = Statistical Delivery Date
Qty = Quantity
DT = Date Tolerance
QT = Quantity Tolerance in ZZLIB_START Master Data
SL = Schedule Line
YTD = Calendar Year to Date
CS = Camoplast Solideal
© Camso 2019
QUANTITY RELIABILITY RULES NA
4
Quantity Reliability Scores are pulled from ACS vendor evaluation solution:
SAP table ZZLIB_LIEFBEUR (Tcode ZZLIB_START) with Monthly Summation
and are based on GRs against POs and SAs.
POs:
1. If GR Qty = (PO Qty +/- QT*), score is 100.
2. If GR Qty </> (PO Qty +/- QT*), score is 1.
SAs:
1. If GR Qty = (Oldest Qty Released +/- QT*), score is 100.
2. If GR Posting Date </> (Oldest Qty Released +/- QT*), score is 1.
*POs and SAs:
3. QTs may be set per Plant only for goods received by weight or length.
4. No QTs are permitted for goods received by PC.
5. Access to set and maintain QTs is assigned to only one User per Plant.
© Camso 2019
DATE RELIABILITY RULES NA
5
Date Reliability Scores are pulled from ACS vendor evaluation solution:
SAP table ZZLIB_LIEFBEUR (Tcode ZZLIB_START) with Monthly Summation
and are based on GRs against POs and SAs.
POs:
1. If GR Posting Date = (SDD +/- DT*), score is 100.
2. If GR Posting Date </> (SDD +/- DT*), score is 1.
SAs:
3. Deliveries are evaluated per the sequence in the DS.
4. If GR Posting Date = (Oldest open DD +/- DT*), score is 100.
5. If GR Posting Date </> (Oldest open DD +/- DT*), score is 1.
*POs and SAs:
6. DTs are not permitted (configured DT = 0 days)
7. Access to set and maintain DTs is assigned to only one User per Plant.
© Camso 2019
AGGREGATION OF MULTIPLE GRs
FOR DATE AND QUANTITY RELIABILITY NA
SAP T-CODE: ZZLIB_START / TABLE: ZZLIB_LIEFBEUR
By Default:
Multiple GRs delivered for the same SL on the same day are aggregated as
one GR.
Only the latest good receipt is displayed and evaluated in the vendor
evaluation.
Older entries are suppressed in the report.
Clicking the “Deactivate GR-aggregation” button at the top of the detailed report
removes the aggregation to show a score for each delivery. This mode is not used for
the Monthly Summation or Combined Score.
© Camso 2019
QUALITY CONFORMANCE RULES NA
SAP T-CODE: ZPURHISTO / tables EKBE/EKPO/EKKO
7
© Camso 2019
CLAIMS NA
SAP T-CODE: ZPURHISTO / tables EKBE/EKPO/EKKO
8
© Camso 2019
QUANTITY RELIABILITY RULES ASIA
9
Quantity Reliability Scores are pulled from SAP standard vendor evaluation component (not
ACS like in North America). There is a Monthly Summation and results are based on GRs
against POs.
Table ZMM051_DATA (Tcode ZMM051)
3. QTs may be set per Plant only for goods received by weight or length.
4. No QTs are permitted for goods received by PC.
5. Access to set and maintain QTs is assigned to only one User per Plant
© Camso 2019
DATE RELIABILITY RULES ASIA
10
Quantity Reliability Scores are pulled from SAP standard vendor evaluation component
(not ACS like in North America). There is a Monthly Summation and results are based
on GRs against POs.
Table ZMM051_DATA (Tcode ZMM051)
*DTs are not permitted (configured DT = 0 days). Access to set and maintain DTs is
assigned to only one User per Plant.
© Camso 2019
DATE RELIABILITY RULES ASIA
TOLERANCES (ZMM051_VE)
© Camso 2019
11
AGGREGATION OF MULTIPLE GRs
FOR DATE AND QUANTITY RELIABILITY ASIA
SAP T-CODE: ZMM051 / TABLE: ZMM051_DATA
12
By Default:
Multiple GRs delivered for the same SL are aggregated as one GR.
Only the latest good receipt is displayed and evaluated in the vendor
evaluation.
Older entries are suppressed in the report.
© Camso 2019
QUALITY CONFORMANCE RULES LOADSTAR
SAP T-CODE: MCVB / table S163
13
© Camso 2019
QUALITY CONFORMANCE RULES CSRP
SAP T-CODE: QA33 / tables QALS
14
100 x [1 – (Qty Returned during the past 6 months / Qty Received during the
same 6-month period)]
© Camso 2019
CLAIMS LOADSTAR
Excel File
15
© Camso 2019
CLAIMS CSRP
SAP T-CODE: ZPURHISTO / tables EKBE/EKPO/EKKO
16
1. Value is the sum of all Return PO Amounts (PO type = ZR02) for
the past 6 months.
2. Only purchase organization 7000 is selected
3. Results are converted to USD using exchange rate from BI yearly
budget
© Camso 2019
COMBINED SCORE – NA and Asia
17