A PRESENTATION ON ELECTRICS,

INSTRUMENTATION & AUTOMATION OF


DEMINERALIZATION PLANT OF CAPACITY
3X89 Cu/M Hr. AT TSL-KPO

CONSULTING ENGINEERS LIMITED


Use of DM Plant
• The centralized DM plant will supply the DM
quality water to the following areas:

• In CPP-1 for Cycle Make up of Captive Power Plant.


• Coke Dry Quenching Steam Generator of Coke Oven Plant.
• Make-up for Process Stream Requirement to CDQ boilers
and CPP-1.
• Closed Loop Cooling System of Blast Furnace.

CONSULTING ENGINEERS LIMITED


Capacity of D

CONSULTING ENGINEERS LIMITED


FRONT VIEW OF METERING PANEL

33 kV Incomer 33 kV
Cubicle from Outgoing
tapping point feeder
cubicle

1400

CONSULTING ENGINEERS LIMITED


SIDE VIEW OF METERING PANEL

1900

1350

1600

CONSULTING ENGINEERS LIMITED


BASE FRAME OF METERING PANEL FABRICATED AT SITE

500 33 kV Incomer
cable 33 kV Outgoing
cable

CONSULTING ENGINEERS LIMITED


NOTES ON METERING PANEL

1. All dimensions indicated in previous slides are in mm.


2. Width and depth of cable trench in metering room is 800 mm and 800 mm
respectively.
3. Increasing the width of cable trench we can avoid the need of base frame.
4. Provision of lighting is also to be done in metering room.
5. Earthing is also required to be done for metering panel.