Arch6123 Design Thinking Ii: Site Analysis
Arch6123 Design Thinking Ii: Site Analysis
SITE ANALYSIS
BINUS University
Faculty of Engineering – Department of Architecture
ASSIGNMENT 01
DEADLINE WEEK 7
DESIGN ISSUE ATTRIBUTES COMPONENTS
Room shading
temperature
Building material
Microclimate
Ceiling height
ventilation
windbreak
soil pH
WASTEWATER permeability
floodplains
buffers
Natural wetlands
hazard High permeability soil
woodlands
NATURAL
HAZARD Site location Fault lines
Soil
Filtration
Stormwater Grassed swales
runoff Buffer strips
STORMWATER
Rain gardens
trees
RUNOFF
Stormwater runoff carries
pollution and other harmful Wetlands
substances while its streaming
down the impervious surfaces. Retention area Water bodies
Bioretention swale
Tank maintenance
SITE
A brownfield site is previously
used for commercial buildings or Building Underground
industrial use. It is not in use removal structure
anymore and contains toxic
waste. Buildings in the site