PC2000-8 - Machines by Machines Which Are Need To Be Investigated More
PA : 83.73% BS BS BS
Downtime : 27.33 H 1.Schedule PS 500 H (Down 1.Carried out PS 40.500Hrs,Replace 1.Continue optimize service
Periode : Week 38 9 H) oil PTO,replace oil SGB,replace fan allocation time for backlog
(17-23 Sept 2012) motor oil cooler,washing unit,test execution
BUS performance.
1.Hose swing leak (Down BUS
EX711 15.58 H) BUS 1.Remind to mechanic about
2 1.Check leaking hose swing, replace monitor condition hose at daily
(20238H) hose and adapter increasing valve check, especially at crimping
swing to hydraulic tank ,final check , area
ground test
PC4000-6 – Machines by machines which are need to be investigated more :
PROBLEM REMARKS ICAC TABLE
NO MODEL
ISSUE CAUSE ACTION COUNTER-MEASURE
PA : 83.88% BS BS BS
Downtime : 27.08 H 1.Schedule PS 250 H (Down 1.Carried out PS 250 Hrs, 1.Monitoring level grease, check
Periode : Week 38 23.50 H) troubleshooting electric cant ON. every daily,
(17-23 Sept 2012) Troubleshooting bull clamp
BUS abnormal,connect cable amplifier,test BUS
1.Balancing valve main pump performance 1.Monitoring level grease, check
SH313
leak (Down 2.58 H) every daily, periodically check
1 BUS the function of autolube system
(39784 H) 1.Re-orig balancing valve main pump 2.Check condition AC system
2,tightening hose grease bull every service and consistency
clamp,tightening bolt mounting schedule service