Professional Documents
Culture Documents
W1 - Pipe Network Analysis
W1 - Pipe Network Analysis
W1 - Pipe Network Analysis
c d
i h g j
𝑸
𝟐 𝑸
𝟒
PIPE BRANCHING
• A system of three or more reservoirs with a common pipe junction
for which it is desired to calculate the flow in each pipe.
B
A
J
C
HARDY CROSS METHOD
𝑸
𝟏 𝑸
𝟑
a b e f
Loop A
c d
i h g j
𝑸
𝟐 𝑸
𝟒
•
Requirements:
1. The net head loss around a loop A = 0 ; + = 0
2. At any junction, ;
Example at point b, - - = 0 ; at point d, + + = 0
HEAD LOSS AND Q RELATIONSHIP
Substituting (2) into (1) and expanding by the binomial theorem (neglecting terms containing and higher
powers.
= +)
In order to satisfy continuity requirements at each Junction, the value of SQ must be the same in each
pipe. Thus the equation (3) gives
PROCEDURES
(HARDY CROSS METHOD)
•1. Assume any distribution of flow in each pipe.
2. Calculate head loss, in each pipe (clockwise (+) and counter-
clockwise (-)).
3. Summing up the head losses algebraically (tor each loop).
= (Darcy) or = (Hazen)
4. Calculate = for each loop.
5. Compute Q and obtain a new flow distribution in the loop.
6. Use the revised flows to repeat 1,2,3,4 and 5, until the desired
precision is attained.
EXAMPLE
• Analyse the flow through the pipes of the following network.
Assume f=0.005 for all pipes.
C
1524m
d = 305mm
A B
0.513 0.513
915m
d = 406mm
D
SOLUTION
1st Correction 2nd Correction 3rd
ACB 0.305 1524 962.35 0.1750 29.4721 336.82 0.1432 19.7368 275.6358 0.1410
ACB
ADB 0.305
0.406 1524
915 962.35
138.24 0.1750
-0.338 29.4721
-15.7933 336.82
93.45 0.1432
-0.3698 19.7368
-18.9049 275.6358
102.2437 0.1410
-0.372
ADB 0.406 915 138.24 -0.338 +13.6788
-15.7933 430.27
93.45 -0.3698 +0.8319
-18.9049 377.8795
102.2437 -0.372
- = -0.0318 430.27
1 = +13.6788 2= - = -0.0022
+0.8319 377.8795
EXERCISE
Analyse the flow through the pipe of the following network. Assume f=0.0025 for
all pipes. If the elevation and pressure head at point A are given as 61m and 45.72m
respectively and the elevation of point D is 30.5m, compute:
a) The flow in each pipe
b) The pressure head at point D
m
m
0
00 m
150
5
SOLUTION
QUANTITY BALANCE METHOD
(FOR PIPE BRANCHING)
Error
Corrected value
4. Repeat the above process until continuity requirements are satisfied (Q=0)
EXERCISE
•Analyse
the flow in each pipe and determine the pressure head at
point J. Assume f = 0.005 and use
=-
Reservoir L D Z
B (m) (mm) (m)
A A 500 600 50
B 1000 300 30
J C 1500 300 10
D 3000 450 20
C
D
SOLUTION
THANK YOU!